104
Views
0
CrossRef citations to date
0
Altmetric
Articles

A stage-dependent economic order quantity model for high-tech products with a finite life cycle

Pages 41-55 | Received 05 Feb 2018, Accepted 25 May 2019, Published online: 07 Jun 2019

References

  • Agrawal, S., Banerjee, S., & Papachristos, S. (2013). Inventory model with deteriorating items, ramp-type demand and partially backlogged shortages for a two warehouse system. Applied Mathematical Modelling, 37(20), 8912–8929. doi: 10.1016/j.apm.2013.04.026
  • Arcelus, F. J., Pakkala, T. P. M., & Srinivasan, G. (2002). A myopic policy for the gradual obsolescence problem with price-dependent demand. Computers & Operations Research, 29(9), 1115–1127. doi: 10.1016/S0305-0548(00)00093-9
  • Benkherouf, L., Skouri, K., & Konstantaras, I. (2017). Inventory decisions for a finite horizon problem with product substitution options and time varying demand. Applied Mathematical Modelling, 51, 669–685. doi: 10.1016/j.apm.2017.05.043
  • Brown, G. W., Lu, J. Y., & Wolfson, R. J. (1964). Dynamic modeling of inventories subject to obsolescence. Management Science, 11(1), 51–63. doi: 10.1287/mnsc.11.1.51
  • Chowdhury, R. R., Ghosh, S. K., & Chaudhuri, K. S. (2014). An order-level inventory model for a deteriorating item with time-quadratic demand and time-dependent partial backlogging with shortages in All cycles. American Journal of Mathematical and Management Sciences, 33(2), 75–97. doi: 10.1080/01966324.2014.881173
  • Chuang, C. H., Wang, C. X., & Zhao, Y. (2014). Closed-loop supply chain models for a high-tech product under alternative reverse channel and collection cost structures. International Journal of Production Economics, 156, 108–123. doi: 10.1016/j.ijpe.2014.05.008
  • Echegaray, F. (2016). Consumers' reactions to product obsolescence in emerging markets: The case of Brazil. Journal of Cleaner Production, 134, 191–203. doi: 10.1016/j.jclepro.2015.08.119
  • Glock, C. H. (2011). Batch sizing with controllable production rates in a multi-stage production system. International Journal of Production Research, 49(20), 6017–6039. doi: 10.1080/00207543.2010.528058
  • Glock, C. H., & Jaber, M. Y. (2013). A multi-stage production-inventory model with learning and forgetting effects, rework and scrap. Computers & Industrial Engineering, 64(2), 708–720. doi: 10.1016/j.cie.2012.08.018
  • Glock, C. H., & Ries, J. M. (2013). Reducing lead time risk through multiple sourcing: The case of stochastic demand and variable lead time. International Journal of Production Research, 51(1), 43–56. doi: 10.1080/00207543.2011.644817
  • Harris, F. W. (1913). How many parts to make at once. Factory, the Magazine of Management, 10(2), 135–136.
  • Hill, R. M. (1996). Batching policies for a product life cycle. International Journal of Production Economics, 45(1-3), 421–427. doi: 10.1016/0925-5273(95)00131-X
  • Hsu, C. I., & Li, H. C. (2009). An integrated plant capacity and production planning model for high-tech manufacturing firms with economies of scale. International Journal of Production Economics, 118(2), 486–500. doi: 10.1016/j.ijpe.2008.09.015
  • Jia, Y. B. (2017). Roots of Polynomials (Vol. 477). New York: Com S.
  • Kou, T. C., & Lee, B. C. (2015). The influence of supply chain architecture on new product launch and performance in the high-tech industry. Journal of Business & Industrial Marketing, 30(5), 677–687. doi: 10.1108/JBIM-08-2013-0176
  • Lee, A. H., Kang, H. Y., Hsu, C. F., & Hung, H. C. (2009). A green supplier selection model for high-tech industry. Expert Systems with Applications, 36(4), 7917–7927. doi: 10.1016/j.eswa.2008.11.052
  • Lee, S. D., Yang, C. M., & Lan, S. C. (2016). Economic lot sizing in a production system with random demand. International Journal of Systems Science, 47(5), 1142–1154. doi: 10.1080/00207721.2014.915354
  • Martín-de Castro, G. (2015). Knowledge management and innovation in knowledge-based and high-tech industrial markets: The role of openness and absorptive capacity. Industrial Marketing Management, 47, 143–146. doi: 10.1016/j.indmarman.2015.02.032
  • Mishra, U. (2015). An EOQ model with time dependent Weibull deterioration, quadratic demand and partial backlogging. International Journal of Applied and Computational Mathematics, 1(19), 545–563.
  • Mukhopadhyay, A., & Goswami, A. (2016). An EOQ model with shortages and selling price dependent time varying demand. International Journal of Supply Chain and Inventory Management, 1(2), 133–153. doi: 10.1504/IJSCIM.2016.076411
  • Nickalls, R. W. D. (1993). A new approach to solving the cubic: Cardan’s solution revealed. The Mathematical Gazette, 77(480), 354–359. doi: 10.2307/3619777
  • Pal, S., Mahapatra, G. S., & Samanta, G. P. (2015). A production inventory model for deteriorating item with ramp type demand allowing inflation and shortages under fuzziness. Economic Modelling, 46, 334–345. doi: 10.1016/j.econmod.2014.12.031
  • Pervin, M., Roy, S. K., & Weber, G. W. (2016). Analysis of inventory control model with shortage under time-dependent demand and time-varying holding cost including stochastic deterioration. Annals of Operations Research, 260, 1–24.
  • Pinçe, Ç, & Dekker, R. (2011). An inventory model for slow moving items subject to obsolescence. European Journal of Operational Research, 213(1), 83–95. doi: 10.1016/j.ejor.2011.02.013
  • Presutti, M., Boari, C., Majocchi, A., & Molina-Morales, X. (2019). Distance to customers, absorptive capacity, and innovation in high-tech firms: The dark face of geographical proximity. Journal of Small Business Management, 57(2), 343–361. doi: 10.1111/jsbm.12323
  • Rau, H., & OuYang, B. C. (2011). Modelling of the inventory replenishment problem with a two-segment piecewise linear demand. International Journal of Systems Science, 42(10), 1613–1624. doi: 10.1080/00207721.2011.603185
  • Robinson, P., Narayanan, A., & Sahin, F. (2009). Coordinated deterministic dynamic demand lot-sizing problem: A review of models and algorithms. Omega, 37(1), 3–15. doi: 10.1016/j.omega.2006.11.004
  • Sarkar, B., Sett, B. K., Goswami, A., & Sarkar, S. (2015). Mitigation of high-tech products with probabilistic deterioration and inflations. American Journal of Industrial and Business Management, 5(03), 73–73. doi: 10.4236/ajibm.2015.53009
  • Singh, T., & Pattnayak, H. (2013). An EOQ inventory model for deteriorating items with varying trapezoidal type demand rate and Weibull distribution deterioration. Journal of Information and Optimization Sciences, 34(6), 341–360. doi: 10.1080/02522667.2013.838445
  • Srivastava, H. M. (2017). An inventory model for ameliorating/deteriorating items with trapezoidal demand and complete backlogging under inflation and time discounting. Mathematical Methods in the Applied Sciences, 40(8), 2980–2993. doi: 10.1002/mma.4214
  • Tripathi, R. P., & Mishra, S. M. (2016). EOQ model with linear time dependent demand and different holding cost functions. International Journal of Mathematics in Operational Research, 9(4), 452–466. doi: 10.1504/IJMOR.2016.079804
  • Tripathi, R. P., Pareek, S., & Kaur, M. (2016). Inventory model with exponential time-dependent demand rate, variable deterioration, shortages and production cost. International Journal of Applied and Computational Mathematics, 2(3), 1407–1419.
  • Winands, E. M., Adan, I. J., & van Houtum, G. J. (2011). The stochastic economic lot scheduling problem: A survey. European Journal of Operational Research, 210(1), 1–9. doi: 10.1016/j.ejor.2010.06.011
  • Wu, J., Skouri, K., Teng, J. T., & Hu, Y. (2016). Two inventory systems with trapezoidal-type demand rate and time-dependent deterioration and backlogging. Expert Systems with Applications, 46, 367–379. doi: 10.1016/j.eswa.2015.10.048
  • Yang, M., & Gabrielsson, P. (2017). Entrepreneurial marketing of international high-tech business-to-business new ventures: A decision-making process perspective. Industrial Marketing Management, 64, 147–160. doi: 10.1016/j.indmarman.2017.01.007

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.