References
- Cao J., & Cheng K. (2006). Introduction to reliability mathematical. Higher Education Press.
- Cao J., & Wu Y. (1988). Reliability analysis of a multistate system with a replaceable repair facility. Acta Mathematicae Applicatae Sinica, 4(2), 113–121. https://doi.org/https://doi.org/10.1007/BF02006059
- Chakravarthy S. R., Krishnamoorthy A., & Ushakumari P. (2001). A k-out-of-n reliability system with an unreliable server and phase type repairs and services: The (N,T) policy. Journal of Applied Mathematics and Stochastic Analysis, 14(4), 361–380. https://doi.org/https://doi.org/10.1155/S1048953301000326
- Chen L., Ye Z.-S., & Xie M. (2013). Joint maintenance and spare component provisioning policy for k-out-of-n systems. Asia-Pacific Journal of Operational Research, 30(6), 1–21. https://doi.org/https://doi.org/10.1142/S0217595913500231
- Chien Y.-H. (2010). Optimal number of minimal repairs before ordering spare for preventive replacement. Applied Mathematical Modelling, 34(11), 3439–3450. https://doi.org/https://doi.org/10.1016/j.apm.2010.02.033
- Cui L., Gao H., & Mo Y. (2018). Reliability for k-out-of-n: F balanced systems with m sectors. IISE Transactions, 50(5), 381–393. https://doi.org/https://doi.org/10.1080/24725854.2017.1397856
- Eryilmaz S., & Tuncel A. (2015). Computing the signature of a generalized k-out-of-n system. IEEE Transactions On Reliability, 64(2), 766–771. https://doi.org/https://doi.org/10.1109/TR.2015.2405594
- Gao Q., & Ge Y. (2015). Maintenance interval decision models for a system with failure interaction. Journal of Manufacturing System, 36(3), 109–114. https://doi.org/https://doi.org/10.1016/j.jmsy.2015.04.012
- Khatab A., Nahas N., & Mustapha N. E. F. (2009). Availability of k-out-of-n: G systems with non-identical components subject to repair priorities. Reliability Engineering & System Safety, 94(2), 142–151. https://doi.org/https://doi.org/10.1016/j.ress.2008.02.017
- Kuo W., & Zuo M. (2003). Optimal reliability modeling: Principles and applications. John Wiley & Sons.
- Liu B., Wu J., & Xie M. (2015). Cost analysis for multi-component system with failure interaction under renewing free-replacement warranty. European Journal of Operational Research, 243(3), 874–882. https://doi.org/https://doi.org/10.1016/j.ejor.2015.01.030
- Moghaddass R., Zuo M., & Qu J. (2011). Reliability and availability analysis of a repairable k-out-of-n: G system with R repairmen subject to shut-off rules. IEEE Transactions on Reliability, 60(3), 658–666. https://doi.org/https://doi.org/10.1109/TR.2011.2161703
- Mohammadi F. (2018). Efficient multicut enumeration of k-out-of-n: F and consecutive k-out-of-n: F systems. Pattern Recognition Letters, 102(15), 82–88. https://doi.org/https://doi.org/10.1016/j.patrec.2017.12.021
- Neuts M. F. (1981). Matrix-Geometric solution in stochastic models: An algorithmic approach. Johns Hopkins University Press.
- Pérez-Ocón R., Montoro-Cazorla D., & Ruiz-Castro J. E. (2006). Transient analysis of a multi-component system modeled by a general Markov process. Asia-Pacific Journal of Operational Research, 23(3), 311–327. https://doi.org/https://doi.org/10.1142/S0217595906000954
- Ruiz-Castro J. E., & Li Q. (2011). Algorithm for a general discrete k-out-of-n: G system subject to several types of failure with an indefinite number of repairpersons. European Journal of Operational Research, 211(1), 97–111. https://doi.org/https://doi.org/10.1016/j.ejor.2010.10.024
- Tang Y. (2010). Revisiting the model of servicing machines with repairable service facility–a new analyzing idea and some new results. Acta Mathematicae Applicatae Sinica, 26(4), 557–566. https://doi.org/https://doi.org/10.1007/s10255-008-8029-6
- Wu W. Q., & Tang Y. H. (2015). Transient analysis of a k-out-of-n: G system with N-policy, repairmen's multiple vacations, and redundant dependency. Discrete Dynamics in Nature and Society, 2015(2015), 1–13. https://doi.org/https://doi.org/10.1155/2015/209653
- Wu W. Q., Tang Y. H., Yu M. M., Jiang Y., & Liu H. (2018). Reliability analysis of a k-out-of-n: G system with general repair times and replaceable repair equipment. Quality Technology & Quantitative Management, 15(2), 274–300. https://doi.org/https://doi.org/10.1080/16843703.2016.1226712
- Wu W. Q., Tang Y. H., Yu M. M., & Jiang Y. (2014). Reliability analysis of a k-out-of-n: G repairable system with single vacation. Applied Mathematical Modelling, 38(24), 6075–6097. https://doi.org/https://doi.org/10.1016/j.apm.2014.05.020
- Wu W. Q., Tang Y. H., Yu M. M., & Jiang Y. (2015). Computation and profit analysis of a k-out-of-n: G repairable system under N-policy with multiple vacations and one replaceable repair facility. RAIRO-Operations Research, 49(4), 717–734. https://doi.org/https://doi.org/10.1051/ro/2015001
- Yu H., Chu C., & Châtelet E. (2014). Availability optimization of a redundant system through dependency modelling. Applied Mathematical Modelling, 38(19–20), 4574–4585. https://doi.org/https://doi.org/10.1016/j.apm.2014.03.006
- Yu H., Chu C., Châtelet E., & Yalaoui F. (2007). Reliability optimization of a redundant system with failure dependencies. Reliability Engineering & System Safety, 92(12), 1627–1634. https://doi.org/https://doi.org/10.1016/j.ress.2006.09.015
- Yu M. M., Tang Y. H., & Fu Y. H. (2013). A geometric process model for M/PH(M/PH)1/K queue with new service machine procurement lead time. International Journal of Systems Science, 44(6), 1061–1075. https://doi.org/https://doi.org/10.1080/00207721.2011.652228
- Yu M. M., Tang Y. H., Fu Y. H., Pan L. M., & Tang X. W. (2012). A deteriorating repairable system with stochastic lead time and replaceable repair facility. Computers Industrial Engineering, 62(2), 609–615. https://doi.org/https://doi.org/10.1016/j.cie.2011.11.023
- Yu M. M., Tang Y. H., Liu L. P., & Cheng J. (2013). A phase-type geometric process repair model with spare device procurement and repairman's multiple vacations. European Journal of Operational Research, 225(2), 310–323. https://doi.org/https://doi.org/10.1016/j.ejor.2012.09.029
- Yu M. M., Tang Y. H., Wu W. Q., & Zhou J. (2014). Optimal order-replacement policy for a phase-type geometric process model with extreme shocks. Applied Mathematical Modelling, 38(17–18), 4323–4332. https://doi.org/https://doi.org/10.1016/j.apm.2014.02.010
- Yuan L. (2012). Reliability analysis for a k-out-of-n: G system with redundant dependency and repairmen having multiple vacations. Appled Mathematics and Computation, 218(24), 11959–11969. https://doi.org/https://doi.org/10.1016/j.amc.2012.06.006
- Zhang Y. L., & Wu S. M. (2009). Reliability analysis for a k/n(F) system with repairable repair-equipment. Applied Mathematical Modelling, 33(7), 3052–3067. https://doi.org/https://doi.org/10.1016/j.apm.2008.10.022
- Zhang T., Zhang Y., & Du X. (2018). Reliability analysis for k-out-of-nsystems with shared load and dependent components. Structual and Multidisciplinary Optimization, 57(3), 913–923. https://doi.org/https://doi.org/10.1007/s00158-017-1893-z