938
Views
2
CrossRef citations to date
0
Altmetric
Research Article

Fuzzy bi-criteria scheduling on parallel machines involving weighted flow time and maximum tardiness

, & | (Reviewing Editor)

References

  • Baker, K. R. (1974). Introduction to sequencing and scheduling. New York, NY: Wiley.
  • Chand, S., & Schneeberger, H. (1986). A note on the single-machine scheduling problem with minimum weighted completion time and maximum allowable tardiness. Naval Research Logistics Quarterly, 33, 551–557.10.1002/(ISSN)1931-9193
  • Gupta, D., Sharma, S., & Aggarwal, S. (2012). Bi-objective scheduling on parallel machines with uncertain processing time. Advances in Applied Science Research, 3, 1020–1026.
  • Gupta, J. N. D., Hariri, A. M. A., & Potts, C. N. (1999). Single-machine scheduling to minimize maximum tardiness with minimum number of tardy jobs. Annals of Operations Research, 92, 107–123.10.1023/A:1018974428912
  • Gupta, J. N. D., Ruiz-torres, A. J., & Webster, S. (2003). Minimizing maximum tardiness and number of tardy jobs on parallel machines subject to minimum flow-time. Journal of the Operational Research Society, 54, 1263–1274.10.1057/palgrave.jors.2601638
  • Jha, P. C., Indumati, N. A., Singh, O., & Gupta, D. (2011). Bi-criterion release time problem for a discrete SRGM under fuzzy environment. International Journal of Mathematics in Operational Research, 3, 680–696.10.1504/IJMOR.2011.043016
  • Mokotoff, E. (2001). Parallel machine scheduling problems: A survey. Asia-Pacific Journal of Operational Research, 18, 193–242.
  • Parkash, D. (1997). Bi-criteria scheduling problems on parallel machines ( PhD thesis). University of Birekshurg, Virginia, VA.
  • Sarin, S. C., & Hariharan, R. (2000). A two machine bicriteria scheduling problem. International Journal of Production Economics, 65, 125–139.10.1016/S0925-5273(99)00050-X
  • Sharma, S., Gupta, D., & Seema., S. (2012). Bi-objective scheduling on parallel machines in fuzzy environment. Proceedings of the Second International Conference on Soft Computing for Problem Solving (SocProS 2012), 1, 365–372.
  • Sharma, S., Gupta, D., & Seema, S. (2013). Bicriteria scheduling on parallel machines: Total tardiness and weighted flowtime in fuzzy environment. International Journal of Mathematics in Operational Research, 5, 492–507.10.1504/IJMOR.2013.054733
  • Smith, W. E. (1956). Various optimizers for single stage production. Naval Research Logistics Quarterly, 3, 59–66.10.1002/(ISSN)1931-9193
  • Su, L.-H., Chen, P.-S., & Chen, S.-Y. (2012). Scheduling on parallel machines to minimize maximum tardiness for the customer order problem. International Journal of System Sciences, 44, 926–936. doi:10.1080/00207721.2011.649366
  • Sunita, & Singh, T. P. (2010a). Bi-objective in fuzzy scheduling on parallel machines. Arya Bhatta Journal of Mathematics and Informatics, 2, 149–152.
  • Sunita, & Singh, T. P. (2010b). Single criteria scheduling with fuzzy processing time on parallel machines. In Proceedings of International Conference in IISN 2010, ISTK (pp. 444–446). Yamuna Nagar, Haryana.
  • Yager, R. R. (1981). A procedure for ordering fuzzy subsets of the unit interval. Information Sciences, 24, 143–161.10.1016/0020-0255(81)90017-7
  • Zadeh, L. A. (1965). Fuzzy sets. Information and Control, 8, 338–353.10.1016/S0019-9958(65)90241-X