1,151
Views
13
CrossRef citations to date
0
Altmetric
Research Article

A fuzzy periodic review integrated inventory model involving stochastic demand, imperfect production process and inspection errors

ORCID Icon, ORCID Icon, & | (Reviewing Editor)
Article: 1308653 | Received 10 Nov 2016, Accepted 13 Mar 2017, Published online: 04 Apr 2017

References

  • Alkhedher, M. J., Darwish, M. A., & Alenezi, A. R. (2013). Stochastic inventory model for imperfect production processes. International Journal of Logistics Systems and Management, 15, 32–46.10.1504/IJLSM.2013.053237
  • Bag, S., Chakraborty, D., & Roy, A. (2009). A production-inventory model with fuzzy random demand and with flexibility and reliability considerations. Computers & Industrial Engineering, 56, 411–416.10.1016/j.cie.2008.07.001
  • Banerjee, A. (1986). A joint economic-lot-size model for purchaser and vendor. Decision Sciences, 17, 292–311.10.1111/deci.1986.17.issue-3
  • Ben-Daya, M., & Hariga, M. (2004). Integrated single vendor single buyer model with stochastic demand and variable lead time. International Journal of Production Economics, 92, 75–80.doi: 10.1016/j.ijpe.2003.09.012
  • Bera, U. K., Mahapatra, N. K., & Maiti, M. (2009). An imperfect fuzzy production-inventory model over a finite time horizon under the effect of learning. International Journal of Mathematics in Operational Research, 1, 351–371.10.1504/IJMOR.2009.024290
  • Chakraborty, D., Jana, D. K., & Roy, T. K. (2015). Multi-item integrated supply chain model for deteriorating items with stock dependent demand under fuzzy random and bifuzzy environments. Computers & Industrial Engineering, 88, 166–180.10.1016/j.cie.2015.06.022
  • Chang, H. C., Yao, J. S., & Ouyang, L. Y. (2006). Fuzzy mixture inventory model involving fuzzy random variable lead time demand and fuzzy total demand. European Journal of Operational Research, 169, 65–80.10.1016/j.ejor.2004.04.044
  • Chen, S. P., & Ho, Y. H. (2011). Analysis of the newsboy problem with fuzzy demands and incremental discounts. International Journal of Production Economics, 129, 169–177.10.1016/j.ijpe.2010.09.014
  • Dey, O., & Giri, B. C. (2014). Optimal vendor investment for reducing defect rate in a vendor–buyer integrated system with imperfect production process. International Journal of Production Economics, 155, 222–228.10.1016/j.ijpe.2014.02.004
  • Fergany, H. A., Ezzat, M. M., & Gawdt, O. A. (2011). Continuous review inventory model with crashing cost under service level constraint and probabilistic fuzzy numbers. Advanced Modeling and Optimization, 13, 6–11.
  • Gallego, G., & Moon, I. (1993). The distribution free newsboy problem: Review and extensions. Journal of the Operational Research Society, 44, 825–834.10.1057/jors.1993.141
  • Garg, H. (2014, December 1–12). Inventory model involving variable lead time, back-order discounts and lost sales using PSO. 18th Online World conference on Soft Computing in Industrial Application (WSC18), World Wide Web.
  • Garg, H. (2015). Fuzzy inventory models for deteriorating items under different types of lead-time distributions. Intelligent Techniques in Engineering Management, Chapter, 11, 247–274.
  • Glock, C. H. (2009). A comment: Integrated single vendor-single buyer model with stochasticdemand and variable lead time. International Journal of Production Economics, 122, 790–792.10.1016/j.ijpe.2009.06.032
  • Glock, C. H. (2012). The joint economic lot size problem: A review. International Journal of Production Economics, 135, 671–686.10.1016/j.ijpe.2011.10.026
  • Goyal, S. K. (1976). An integrated inventory model for a single supplier-single customer problem. International Journal of Production Research, 15, 107–111.
  • Goyal, S. K. (1988). A joint economic-lot-size model for purchaser and vendor: A comment. Decision Sciences, 19, 236–241.10.1111/deci.1988.19.issue-1
  • Gupta, V., & Singh, S. R. (2013). An integrated inventory model with fuzzy variables, three parameter Weibull deterioration and variable holding cost under inflation. International Journal of Operational Research, 18, 452–466.
  • Hsiao, Y. C. (2008). A note on integrated single vendor single buyer with stochastic demand and variable lead time. International Journal of Production Economics, 114, 294–297.
  • Hsu, J. T., & Hsu, L. F. (2012). An integrated single-vendor single-buyer production-inventory model for items with imperfect quality and inspection errors. International Journal of Industrial Engineering Computations, 3, 703–720.10.5267/j.ijiec
  • Hu, J. S., Zheng, H., Xu, R. Q., Ji, Y. P., & Guo, C. Y. (2010). Supply chain coordination for fuzzy random newsboy problem with imperfect quality. International Journal of Approximate Reasoning, 51, 771–784.10.1016/j.ijar.2010.04.002
  • Huang, C. K. (2004). An optimal policy for a single-vendor single-buyer integrated production inventory problem with process unreliability consideration. International Journal of Production Economics, 91, 91–98.10.1016/S0925-5273(03)00220-2
  • Jaber, M. Y., Bonney, M., & Guiffrida, A. L. (2010). Coordinating a three-level supply chain with learning-based continuous improvement. International Journal of Production Economics, 127, 27–38.10.1016/j.ijpe.2010.04.010
  • Jana, D. K., Maity, K., Das, B., & Roy, T. K. (2013). A fuzzy simulation via contractive mapping genetic algorithm approach to an imprecise production inventory model under volume flexibility. Journal of Simulation, 7, 90–100.10.1057/jos.2012.23
  • Jauhari, W. A. (2016). Integrated vendor-buyer model with defective items, inspection error and stochastic demand. International Journal of Mathematics in Operational Research, 8, 342–359.
  • Jauhari, W. A., Fitriyani, A., & Aisyati, A. (2016). An integrated inventory model for single-vendor single-buyer system with freight rate discount and stochastic demand. International Journal of Operational Research, 25, 327–350.10.1504/IJOR.2016.074757
  • Jauhari, W. A., & Pujawan, I. N. (2014). Joint economic lot size (JELS) model for single-vendor single-buyer with variable production rate and partial backorder. International Journal of Operational Research, 10, 442–457.
  • Jauhari, W. A., Sejati, N., & Rosyidi, C. N. (2016). A collaborative supply chain inventory model with defective items, adjusted production rate and variable lead time. International Journal of Procurement Management, 9, 733–750.10.1504/IJPM.2016.079983
  • Kao, C., & Hsu, W. K. (2002). A single period inventory model with fuzzy demand. Computers & Mathematics with Applications, 43, 841–848.10.1016/S0898-1221(01)00325-X
  • Khan, M., & Jaber, M. Y. (2011). Optimal inventory cycle in a two-stage supply chain incorporating imperfect items from suppliers. International Journal of Operational Research, 20, 91–108.
  • Khan, M., Jaber, M. Y., & Ahmad, A. R. (2014). An integrated supply chain model with errors in quality inspection and learning in production. Omega, 42, 16–24.10.1016/j.omega.2013.02.002
  • Khouja, M., & Mehrez, A. (1994). Economic production lot size model with variable production rate and imperfect quality. Journal of the Operational Research Society, 45, 1405–1417.10.1057/jors.1994.217
  • Kumar, R. S., & Goswami, A. (2015). A continuous review production–inventory system in fuzzy random environment: Minmax distribution free procedure. Computers & Industrial Engineering, 79, 65–75.10.1016/j.cie.2014.10.022
  • Kumar, R. S., Tiwari, M., & Goswami, A. (2016). Two-echelon fuzzy stochastic supply chain for manufacturer-buyer integrated production-inventory system. Journal of Intelligent Manufacturing, 27, 875–888.10.1007/s10845-014-0921-8
  • Kurdhi, N. A., Lestari, S. M. P., & Susanti, Y. (2015). A fuzzy collaborative supply chain inventory model with controllable setup cost and service level constraint for imperfect items. International Journal of Applied Management Science, 7, 93–122.10.1504/IJAMS.2015.069265
  • Leung, K. N. F. (2010). An integrated production-inventory system in a multi-stage multi-firm supply chain. Transportation Research Part E: Logistics and Transportation Review, 46, 32–48.10.1016/j.tre.2009.06.003
  • Lin, H. J. (2013). An integrated supply chain inventory model with imperfect-quality items, controllable lead time and distribution-free demand. Yugoslav Journal of Operations Research, 23, 87–109.10.2298/YJOR110506019L
  • Lin, Y. J. (2008). A periodic review inventory model involving fuzzy expected demand short and fuzzy backorder rate. Computers & Industrial Engineering, 54, 666–676.10.1016/j.cie.2007.10.002
  • Lin, Y. J. (2010). A stochastic periodic review integrated inventory model involving defective items, backorder price discount, and variable lead time. 4OR, 8, 281–297.10.1007/s10288-010-0124-x
  • Lin, Y. J., & Lin, H. J. (2016). Optimal ordering and recovery policy in a periodic review integrated inventory model. International Journal of Systems Sciences, 3, 200–210.
  • Liu, S. T. (2012). Solution of fuzzy integrated production and marketing planning based on extension principle. Computers & Industrial Engineering, 63, 1201–1208.10.1016/j.cie.2012.07.010
  • Lo, C. (2013). A collaborative business model for imperfect process with setup cost and lead time reductions. Open Journal of Social Sciences, 1, 6–11.10.4236/jss.2013.17002
  • Mahapatra, G., Mandal, T., & Samanta, G. (2011). A production inventory model with fuzzy coefficients using parametric geometric programming approach. International Journal of Machine Learning and Cybernetics, 2, 99–105.10.1007/s13042-011-0018-z
  • Mahata, G. C. (2015). An integrated production-inventory model with backorder and lot for lot policy in fuzzy sense. International Journal of Mathematics in Operational Research, 7, 69–102.10.1504/IJMOR.2015.065958
  • Mahata, G. C., & Goswami, A. (2013). Fuzzy inventory models for items with imperfect quality and shortage backordering under crisp and fuzzy decision variables. Computers & Industrial Engineering, 64, 190–199.10.1016/j.cie.2012.09.003
  • Maity, A. K. (2011). One machine multiple-product problem with production-inventory system under fuzzy inequality constraint. Applied Soft Computing, 11, 1549–1555.10.1016/j.asoc.2009.12.029
  • Mandal, S., Maity, K., Mondal, S., & Maiti, M. (2010). Optimal production inventory policy for defective items with fuzzy time period. Applied Mathematical Modelling, 34, 810–822.10.1016/j.apm.2009.06.031
  • Ouyang, L. Y., Wu, K. S., & Ho, C. H. (2006). Analysis of optimal vendor–buyer integrated inventory policy involving defective items. The International Journal of Advanced Manufacturing Technology, 29, 1232–1245.10.1007/s00170-005-0008-y
  • Paknejad, M. J., Nasri, F., & Afflsco, J. F. (1995). Defective units in a continuous review (s, Q) system. International Journal of Production Research, 33, 2767–2777.10.1080/00207549508904844
  • Pal, S., Mahapatra, G., & Samanta, G. (2014). An EPQ model of ramp type demand with Weibull deterioration under inflation and finite horizon in crisp and fuzzy environment. International Journal of Production Economics, 156, 159–166.10.1016/j.ijpe.2014.05.007
  • Pal, S., Mahapatra, G., & Samanta, G. (2015). A production inventory model for deteriorating item with ramp type demand allowing inflation and shortages under fuzziness. Economic Modelling, 46, 334–345.10.1016/j.econmod.2014.12.031
  • Paul, S. K., Azeem, A., Sarker, R., & Essam, D. (2014). Development of a production inventory model with uncertainty and reliability considerations. Optimization and Engineering, 15, 697–720.10.1007/s11081-013-9218-6
  • Paul, S., Wahab, M. I. M., & Ongkunaruk, P. (2014). Joint replenishment with imperfect items and price discount. Computers and Industrial Engineering, 74, 179–185.10.1016/j.cie.2014.05.015
  • Petrović, D., Petrović, R., & Vujošević, M. (1996). Fuzzy models for the newsboy problem. International Journal of Production Economics, 45, 435–441.10.1016/0925-5273(96)00014-X
  • Porteus, E. L. (1986). Optimal lot sizing, process quality improvement and setup cost reduction. Operations Research, 34, 137–144.10.1287/opre.34.1.137
  • Priyan, S., & Uthayakumar, R. (2014). Optimal inventory management strategies for pharmaceutical company and hospital supply chain in a fuzzy-stochastic environment. Operations Research for Health Care, 3, 177–190.10.1016/j.orhc.2014.08.001
  • Priyan, S., & Uthayakumar, R. (2016). Economic design of multi-echelon inventory system with variable lead time and service level constraint in a fuzzy cost environment. Fuzzy Information and Engineering, 8, 465–511.10.1016/j.fiae.2017.01.006
  • Rong, M., & Maiti, M. (2015). On an EOQ model with service level constraint under fuzzy-stochastic demand and variable lead-time. Applied Mathematical Modelling, 39, 5230–5240.10.1016/j.apm.2015.03.035
  • Sadeghi, J., & Niaki, S. T. A. (2015). Two parameter tuned multi-objective evolutionary algorithms for a bi-objective vendor managed inventory model with trapezoidal fuzzy demand. Applied Soft Computing, 30, 567–576.
  • Sadeghi, J., Sadeghi, S., & Niaki, S. T. A. (2014). Optimizing a hybrid vendor-managed inventory and transportation problem with fuzzy demand: an improved particle swarm optimization algorithm. Information Sciences, 272, 126–144.
  • Salameh, M. K., & Jaber, M. Y. (2000). Economic production quantity model for items with imperfect quality. International Journal of Production Economics, 64, 59–64.10.1016/S0925-5273(99)00044-4
  • Samadi, F., Mirzazadeh, A., & Pedram, M. M. (2013). Fuzzy pricing, marketing and service planning in a fuzzy inventory model: A geometric programming approach. Applied Mathematical Modelling, 37, 6683–6694.10.1016/j.apm.2012.12.020
  • Sana, S. S. (2011). A production-inventory model of imperfect quality products in a three-layer supply chain. Decision Support Systems, 50, 539–547.10.1016/j.dss.2010.11.012
  • Seliaman, M. E., & Ahmad, A. R. (2008). Optimizing inventory decisions in a multi-stage supply chain under stochastic demands. Applied Mathematics and Computation, 206, 538–542.10.1016/j.amc.2008.05.057
  • Soni, H. N., & Joshi, M. (2015). A periodic review inventory model with controllable lead time and backorder rate in fuzzy-stochastic environment. Fuzzy Information and Engineering, 7, 101–114.10.1016/j.fiae.2015.03.007
  • Soni, H. N., & Patel, K. A. (2014). Optimal policies for integrated inventory system under fuzzy random framework. The International Journal of Advanced Manufacturing Technology, 78, 947–959.
  • Tahami, H., Mirzazadeh, A., Arshadi-Khamseh, A., & Gholakami-Qadikolaei, A. (2016). A periodic review integrated inventory model for buyer’s unidentified protection interval demand distribution. Cogent Engineering, 3, 1206689.
  • Taleizadeh, A. A., Niaki, S. T. A., & Wee, H. M. (2013). Joint single vendor-single buyer supply chain problem with stochastic demand and fuzzy lead-time. Knowledge-Based Systems, 48, 1–9.10.1016/j.knosys.2013.03.011
  • Vijayan, T., & Kumaran, M. (2008). Inventory models with a mixture of backorders and lost sales under fuzzy cost. European Journal of Operational Research, 189, 105–119.10.1016/j.ejor.2007.05.049
  • Wee, H. M., Yu, J., & Chen, M. J. (2007). Optimal inventory model for items with imperfect quality and shortage backordering. The International Journal of Management Science, 35, 7–11.
  • Wong, W. K., Qi, J., & Leung, S. Y. S. (2009). Coordinating supply chains with sales rebate contracts and vendor-managed inventory. International Journal of Production Economics, 120, 151–161.10.1016/j.ijpe.2008.07.025
  • Yao, J.-S., & Lee, H.-M. (1999). Fuzzy inventory with or without backorder for fuzzy order quantity with trapezoid fuzzy number. Fuzzy Sets and Systems, 105, 311–337.
  • Yao, J.-S., & Chiang, J. (2003). Inventory without backorder with fuzzy total cost and fuzzy storing cost defuzzified by centroid and signed distance. European Journal of Operational Research, 148, 401–409.
  • Zadeh, L. A. (1978). Fuzzy sets as a basis for a theory of possibility. Fuzzy Sets and Systems, 1, 3–28.10.1016/0165-0114(78)90029-5
  • Zhang, T., Liang, L., Yu, Y., & Yu, Y. (2007). An integrated vendor-managed inventory model for a two-echelon system with order cost reduction. International Journal of Production Economics, 109, 241–253.10.1016/j.ijpe.2006.12.051
  • Zhou, Y.-W., & Wang, S. D. (2007). Optimal production and shipment models for a single-vendor single-buyer integrated system. European Journal of Operational Research, 180, 309–328.10.1016/j.ejor.2006.04.013