References
- Choudhary, R. P. (2015). Optimization of load – Haul – Dump mining system by Oee and match factor for surface mining. International Journal of Applied Engineering and Technology, 5(2), 96–102.
- Croft, C. (2016). Process improvement fundamentals. Retrieved from Lynda.com: http://www.chriscroft.co.uk/?v=0f177369a3b7
- Fuentes, O. B. (1999). Mining machineries and installation. Moa: ISMM.
- Kennedy, E. B. B. A. (2009). Surface mining. Littleton, CO: Society for Mining, Metallurgy, and Exploration, Inc. (SME). Retrieved from www.smenet.org
- Liu, J., & Bongaerts, J. C. (2014). Mine planning and equipment selection. Mine Planning and Equipment Selection. doi:10.1007/978-3-319-02678-7
- Patel, B., & Prajapati, J. (2012). Evaluation of bucket capacity, digging force calculations and static force analysis of mini hydraulic backhoe excavator. Machine Design, 4(1), 59–66 http://standards.globalspec.com/std/1856598/sae-j296
- Polanco, A.R. (2014) Notes of surface mining. Moa. Retrieved from http://docplayer.net/22851170-Improving-productivity-of-mining-machinery-through-total-productive-maintenance.html