14,076
Views
9
CrossRef citations to date
0
Altmetric
Research Article

Methodology for a dump design optimization in large-scale open pit mines

ORCID Icon | (Reviewing Editor)
Article: 1387955 | Received 10 May 2017, Accepted 30 Sep 2017, Published online: 13 Oct 2017

References

  • CPLEX. (2016). V12.7: User’s manual for CPLEX. New York, NY: International Business Machines Corporation.
  • Dorey, R., Van Zyl, D., & Kiel, J. (1988). Overview of heap leaching technology. In D. van Zyl, I. A. Hutchison, & J. E. Kiel (Eds.), Introduction to evaluation, design and operation of precious metal heap leaching projects (pp. 61–67). Littleton, CO: SME.
  • Fourer, R., Gay, D. M., & Kernighan, B. W. (2003). AMPL: A modeling language for mathematical programming (2nd ed.). Duxbury Press Brooks Cole Publishing.
  • Hekmat, A., Osanloo, M., & Shirazi, A. M. (2008). New approach for selection of waste dump sites in open pit mines. Mining Technology, 117(1), 24–31.10.1179/174328608X343768
  • Hustrulid, W., Kuchta, M., & Martin, R. (2013). Open pit mine planning & design (Vol. 1, 3rd ed.). CRC Press/Balkema.
  • Kappes, D. W. (2002). Precious metal heap leach design and practice. In A. L. Mular, D. N. Halbe, & D. J. Barratt, eds., Mineral processing plant design, practice, and control (vol. 1, pp. 1606–1630). Littleton, Colo.: Society for Mining, Metallurgy, and Exploration,
  • Li, Y., Topal, E., & Williams, D. (2013). Waste rock dumping optimisation using mixed integer programming (MIP). International Journal of Mining, Reclamation and Environment, 27(6), 425–436.10.1080/17480930.2013.794513
  • Newman, A., Rubio, E., Caro, R., Weintraub, A., Kelly, K. (2010). A review of operations research in mine planning. Interfaces, 40(3), 222–245. doi:10.1287/inte.1090.0492
  • Peng, C., Ji, D., Zhao, L., & Ren, F. (2013). Study on limit height and its stability of open-pit dump bases on basement bearing mechanism. Applied Mechanics and Materials, 405–408(2013), 177–181.10.4028/www.scientific.net/AMM.405-408
  • Piteau Associates Engineering Ltd. (1991). Mined rock and overburden piles. Investigation and design manual. Interim guidelines. Prepared for the British Columbia Mine Dump Committee.
  • Rosengren, K., Simmons, J., Maconochie, A. P., & Sullivan, T. (2010). Geotechnical investigations for open pit mines – 250 m and beyond. In Bowen Basin Symposium (pp. 169–179).
  • Russell, M. (2008). So you want to have the best possible waste rock dump, rock dumps 2008. In Proceeding of the first international seminar on the Management of Rock dumps, stockpiles and Heal leach pads (pp. 117–127).
  • Smith, M. E. (2002, May 10). Technological advances in low grade leaching. Santiago: ExpoMin.
  • Sommerville, K., & Heyes, J. (2009). Be open to closure – It can save you money. In Seventh International Mining, Geology Conference, Perth, WA (pp. 317–322).
  • Upadhyay, O. P., Sharma, D. K., & Singh, D. P. (1990). Factors affecting stability of waste dumps in mines. International Journal of Surface Mining, Reclamation and Environment, 4(3), 95–99.10.1080/09208119008944174
  • Ureel, S. D. (2014). Concepts used to analyze and determine rock slope stability for mining & civil engineering applications (PhD Dissertation). The University of Arizona.
  • Wright, E. A. (1996). Planning with linear programming. Baltimore, MD: Johns Hopkins University Press.
  • Zanbak, C. (2012). Heap Leaching techniques in Mining, within the context of best available techniques (BAT). Euromines – The European association of mining industries, metal ores & industrial minerals.
  • Zástěrová, P., Marschalko, M., Niemiec, D., Durďák, J., Bulko, R., & Vlček, J. (2015). Analysis of possibilities of reclamation waste dumps after coal mining. Procedia Earth and Planetary Science, 15, 656–662.
  • Zhang, D., Inoue, N., Sasaoka, T., Shimada, H., Hamanaka, A., & Matsui, K. (2014). Study on Formation Mechanism of Dumping Piles on Dumping Area Stability. Open Journal of Geology, 4(4), 161–175.10.4236/ojg.2014.44012