Investigation of significant industrial project delay factors and development of conceptual framework

& | (Reviewing editor)
Article: 1938936 | Received 02 Sep 2020, Accepted 13 Apr 2021, Published online: 15 Jun 2021

References

  • Aibinu, A. A., & Jagboro, G. O. (2002). The effects of construction delays on project delivery in Nigerian construction industry. International Journal Of Project Management, , 593–12. https://doi.org/10.1016/S0263-7863(02)00028-5
  • Alsharif, S., & Karatas, A. (2016). A framework for identifying causal factors of delay in nuclear power plant projects. International Conference On Sustainable Design, Engineering And Construction (pp. 1486–1492). Elsevier.
  • Amir Hossein, G., & Aurum, A. (2012). The impact of project capabilities on project performance: Case of open source software projects. International Journal Of Project Management, 30(4) 407–417. https://doi.org/10.1016/j.ijproman.2011.10.002
  • Aziz, F. (2013). Factors causing cost variation for constructing wastewater projects in Egypt. Alexandria Engineering Journal: Elsevier, 52(1), 51–66. https://doi.org/10.1016/j.aej.2012.11.004
  • Aziz, R. F. (2013). Ranking of delays in construction projects after Egyptian revolution. Alexandria Engineering Journal, 52(3), 387–406. https://doi.org/10.1016/j.aej.2013.03.002
  • Carvalho, Bárbara L. Pinto, Eduardo C., Guardia, Marangon Lima. (2019). Economic impact of anticipations or delays in the completion of power generation project in the Brazilian energy market. Elsevier: Renewable Energy, 147(1),1312–1320. https://doi.org/10.1016/j.renene.2019.09.074
  • Cook, M., & Mo, J. P. T. (2018). A systems approach to life cycle risk prediction for complex engineering projects. Cogent Engineering: Mechanical Engineering, 5(1)1–13. https://doi.org/10.1080/23311916.2018.1451289
  • Doloi, H., Sawhney, A., Iyer, K. C., & Rentala, S. (2012). Analysing factors affecting delays in Indian construction projects. International Journal Of Project Management: Elsevier, 30(4), 479–489. https://doi.org/10.1016/j.ijproman.2011.10.004
  • Durdyev, S., Maksat Omarov, Syuhaida Ismail and Mengheng Lim. (2017). Significant contributors to cost overruns in construction projects of Cambodia. Cogent Engineering: Civil & Environmental Engineering, 4(1), 1–10. https://doi.org/10.1080/23311916.2017.1383638
  • Gebrehiwet, T., & Luo., H. (2017). Analysis of delay impact on construction project based on Rii And. Procedia Engineering:Sciencedirect, 196, 366–374. https://doi.org/10.1016/j.proeng.2017.07.212
  • Hamzaha, N. A. Khoiry, I. Arshad, M. Tawil and I. Che Ani. (2011). Cause Of Construction Delay - Theoretical Framework. The 2nd International Building Control Conference 2011 (pp. 490–495). Elsevier.
  • Hosein, G., & Ray, I. (2020). Priority analysis of pre-investment risks. Cogent Engineering: Civil & Environmental Engineering, 7(1), 1–20. https://doi.org/10.1080/23311916.2020.1757183
  • José Roberto, D.-R. J. L.-A.-L.-S.-M.-F.. (2018). Impact of infrastructure and production processes on Rioja Wine supply chain performance. Mdpi Sustianability, 7(1), 1–14. https://doi.org/10.3390/su10010103
  • Khair, K., Hamzaha, Z. Mohamed, R. Mohammad, H. Farouk & M. Ahmed. (2018). A management framework to reduce delays in road construction projects in Sudan. Research Article - Civil Engineering: Springer, 1925–1940. https://link.springer.com/article/ 10.1007/s13369-017-2806-6
  • Khodeir, L. M., & Nabawy, E. M. (2020). Responsive human resource framework for design and building of Mega housing development projects in Egypt. Ain Shams Engineering Journal: Elsevier, 12(2), 1–13. https://doi.org/10.1016/j.asej.2020.09.025
  • Kothari, R. (2004). Research methodology. New Age Internaional (P) Publisher.
  • Nasir, N. A. (2016). Issue of delay in construction industry: Local project participants perspective. Revista De La Facultad De Ingeniería U.C.V, 11–15. https://www.semanticscholar.org/paper/Issue-of-Delay-in-Construction-Industry%3A-Local-Nasir/8fda0afd62a60e7750aaefd985030bdd73c05dfe
  • Ojoko, O. Tanko, M. Jibrin, and L. Enegbuma. (2016). Project Delay Causes And Effects In The Construction Industry. Universiti Teknologi Malaysia, Johor Bahru, Malaysia Igcesh 2016, 221–223.
  • Shebob, N. Dawood, R.K. Shah and Q. Xu et al (2012). Comparative study of delay factors in libyan and the Uk construction industry. Engineering, Construction And Architectural Management Emerald Article, 688–712. https://www.emerald.com/insight/content/doi/ 10.1108/09699981211277577/full/html
  • Stojcetovic, Ž. Šarkoćević, D. Lazarević and D. Marjanović. (2015). The application of pareto nalaysis in project management. 9th International Quality Conference, University of Kragujevac (pp. 655–658).
  • Sunjka, P. (2013). Significant causes and effects of project delays in the Niger Delta region, Nigeria. Saiie25 Proceedings, (pp. 641–655). South Africa.
  • Toor, R., & Ogunlana, S. (2008). Problems causing delays in major construction projects in Thailand. Construction Management And Economics, 26(4), 395–408. https://doi.org/10.1080/01446190801905406
  • Upadhyay, A., V. Gupta, Dr. Mukesh Pandey. (2016). A case study on schedule delay analysis in construction. International Research Journal Of Engineering And Technology (Irjet), 3(5), 1312–1315. https://www.irjet.net/archives/V3/i5/IRJET-V3I5269.pdf
  • Zarei, B., Et, A., & Chaghouee, Y. (2018). Delay causes analysis in complex construction projects: A semantic network analysis approach. Production Planning & Control, The Management Of Operation, 29(1), 29–40. https://doi.org/10.1080/09537287.2017.1376257