3,505
Views
3
CrossRef citations to date
0
Altmetric
PRODUCTION & MANUFACTURING

Improving the Supply Chain Performance of an Electronic Product-Manufacturing Organisation Using DMAIC Approach

, , , & | (Reviewing editor)
Article: 2025196 | Received 30 Jul 2021, Accepted 30 Dec 2021, Published online: 01 Feb 2022

References

  • Abhilash, C. R., & Thakkar, J. J. (2019). “Application of Six Sigma DMAIC methodology to reduce the defects in a telecommunication cabinet door manufacturing process: A case study. International Journal of Quality & Reliability Management, 36(9), 1540–29. https://doi.org/10.1108/IJQRM-12-2018-0344
  • Anand, G., & Kodali, R. (2008). A conceptual framework for lean supply chain and its implementation. International Journal of Value Chain Management, 2(3), 313–357. https://doi.org/10.1504/IJVCM.2008.019517
  • Arafeh, M., Barghash, M. A., Haddad, N., Musharbash, N., Nashawati, D., Al-Bashir, A., & Assaf, F. (2018). Using Six Sigma DMAIC methodology and discrete event simulation to reduce patient discharge time in King Hussein Cancer Center. Journal of Healthcare Engineering, 3(1), 1–17. https://doi.org/10.1155/2018/3832151
  • Batalova, J., Fix, M., & Bachmeier, J. D. (2016). Untapped talent: the costs of brain waste among highly skilled immigrants in the United States. World Education Services, 5(1), 102–114. https://www.migrationpolicy.org/sites/default/files/publications/BrainWaste-FULLREPORT-FINAL.pdf
  • Cheng, J. L. (2017). Improving inventory performance through lean six sigma approaches. International Journal of Operations Management, 16(3), 24–35. https://web.p.ebscohost.com/ehost/pdfviewer/pdfviewer?vid=0&sid=0f61b50f-61e7-4d17-896d-4cd5c42d5be3%40redis
  • Čiarnienė, R., & Vienažindienė, M. (2015). An empirical study of lean concept manifestation. Procedia-Social and Behavioral Sciences, 207(1), 225–233. https://doi.org/10.1016/j.sbspro.2015.10.091
  • Cuatrecasas-Arbós, L., Fortuny-Santos, J., Ruiz-de-arbulo-lópez, P., & Vintró-Sanchez, C. (2015). Monitoring processes through inventory and manufacturing lead time. Industrial Management & Data System, 115(5), 951–970. https://doi.org/10.1108/IMDS-12-2014-0375
  • Cudney, E., & Elrod, C. A. (2011). Comparative analysis of integrating lean concepts into supply chain management in manufacturing and service industries. International Journal of Lean Six Sigma, 2(1), 5–22. https://doi.org/10.1108/20401461111119422
  • Fekete, M., & Hulvej, J. (2013). Humanizing takt time and productivity in the labour intensive manufacturing systems. In: Management knowledge and learning international conference, 191–199. Zadar, Croatia: ToKnowPress.
  • Formento, H. R., Chiodi, F. J., Cusolito, F. J., Altube, L. A., & Gatti, S. P. (2013). Key factors for a continuous improvement process. Independent Journal of Management & Production, 4(2), 391–415. https://doi.org/10.14807/ijmp.v4i2.76
  • Gupta, N. (2013). An application of DMAIC methodology for increasing the yarn quality in textile industry. IOSR Journal of Mechanical and Civil Engineering, 6(1), 50–65. https://doi.org/10.9790/1684-0615065
  • Haddud, A., & Khare, A. (2018). The impact of digitizing supply chains on lean operations (Anshuman Khare, Dagmar Kessler, and Jan Wirsam, Ed.). In Marktorientiertes Produkt-und Produktionsmanagement in digitalen Umwelten (pp. 27–46). Springer.
  • Hoellthaler, G., Braunreuther, S., & Reinhart, G. (2018). Digital Lean Production: An Approach to identify potentials for the migration to a digitalized production system in SMEs from a Lean perspective. Procedia CIRP, 67(1), 522–527. https://doi.org/10.1016/j.procir.2017.12.255
  • Hossain, M. M., & Uddin, M. K. (2015). An approach to improve the process cycle efficiency and reduce the lead time of a Mango juice processing line by using lean tools: A case study. International Journal of Scientific and Engineering Research, 6(1), 1442–1452. https://www.ijser.org/researchpaper/An-Approach-to-Improve-the-Process-Cycle-Efficiency-and-Reduce-the-Lead-Time.pdf
  • Ibidunni, O. S., Falola, H. O., Ibidunni, A. S., & Olokundun, A. M. (2014). Effects of human resource waste on productivity in nigeria. International Journal of Human Resource Management and Research (IJHRMR), 4(3), 47–56. http://eprints.covenantuniversity.edu.ng/3312/1/EFFECT%20OF%20HUMAN%20RESOURCE%20WASTE%20-%20Ibidunni%2C%20Olanrewaju%20Samson%20-%20Nigeria.pdf
  • Jayanth, B. V., Prathap, P., Sivaraman, P., Yogesh, S., & Madhu, S. (2020). Implementation of lean manufacturing in electronics industry. Materials Today: Proceedings, 33(1), 23–28. http://dx.doi.org/10.1016/j.matpr.2020.02.718
  • Jirasukprasert, P., Garza-Reyes, J. A., Kumar, V., & Lim, M. K. (2014). A Six Sigma and DMAIC application for the reduction of defects in a rubber gloves manufacturing process. International Journal of Lean Six Sigma, 5(1), 1–21. https://doi.org/10.1108/IJLSS-03-2013-0020
  • Junior, M. L., & Godinho Filho, M. (2010). Variations of the Kanban system: Literature review and classification. International Journal of Production Economics, 125(1), 13–21. https://doi.org/10.1016/j.ijpe.2010.01.009
  • Kariuki, B. M., & Mburu, D. K. (2013). Role of Lean manufacturing on organization competitiveness. Industrial Engineering Letters, 3(10), 81–82. https://www.iiste.org/Journals/index.php/IEL/article/view/8012/8313
  • Khan, S. A., Badar, M. A., & Alzaabi, M. (2020). Productivity improvement using DMAIC in a Caravan Manufacturing company. International Journal of Productivity and Quality Management, 30(2), 234–251. https://doi.org/10.1504/IJPQM.2020.107825
  • Lee, M. C., & Chang, T. (2010). Developing a lean design for Six Sigma through supply chain methodology. International Journal of Productivity and Quality Management, 6(4), 407–434. https://doi.org/10.1504/IJPQM.2010.035891
  • Myerson, P. (2012). Lean supply chain and logistics management. McGraw-Hill Education.
  • Raman, R., & Basavaraj, Y. (2019). Defect reduction in a capacitor manufacturing process through Six Sigma concept: A case study. Management Science Letters, 9(2), 253–260. https://doi.org/10.5267/j.msl.2018.11.014
  • Sajjad, M. H., Naeem, K., Zubair, M., Usman Jan, Q. M., Khattak, S. B., Omair, M., & Nawaz, R. (2021). Waste reduction of polypropylene bag manufacturing process using Six Sigma DMAIC approach: A case study. Cogent Engineering, 8(1), 1–22. https://doi.org/10.1080/23311916.2021.1896419
  • Senthilkumar, T., Karthi, S., Devadasan, S. R., Sivaram, N. M., Sreenivasa, C. G., & Murugesh, R. (2012). Implementation of DMAIC methodology in supply chains to reduce customer end-rejections: A case study in an Indian SME. International Journal of Productivity and Quality Management, 10(3), 388–409. https://doi.org/10.1504/IJPQM.2012.048755
  • Simboli, A., Taddeo, R., & Morgante, A. (2014). Value and wastes in manufacturing. An overview and a new perspective based on eco-efficiency. Administrative Sciences, 4(3), 173–191. https://doi.org/10.3390/admsci4030173
  • Tortorella, G. L., Miorando, R., & Tlapa, D. (2017). Implementation of lean supply chain: An empirical research on the effect of context. The TQM Journal, 29(4), 610–623. https://doi.org/10.1108/TQM-11-2016-0102
  • Vinodh, S., & Kumar Chintha, S. (2011). Application of fuzzy QFD for enabling leanness in a manufacturing organisation. International Journal of Production Research, 49(6), 1627–1644. https://doi.org/10.1080/00207540903568729