570
Views
2
CrossRef citations to date
0
Altmetric
Research Article

Form-based postponement in the solid hardwood supply network

ORCID Icon, & ORCID Icon | (Reviewing editor)
Article: 1701887 | Received 29 May 2019, Accepted 04 Dec 2019, Published online: 29 Dec 2019

References

  • Abasian, F., Rönnqvist, M., & Ouhimmou, M. (2017). Forest fibre network design with multiple assortments: A case study in Newfoundland. Canadian Journal of Forest Research, 47. doi:10.1139/cjfr-2016-0504
  • Alayet, C., Lehoux, N., & Lebel, L. (2018). Logistics approaches assessment to better coordinate a forest products supply chain. Journal of Forest Economics, 30, 13–19. doi:10.1016/j.jfe.2017.11.001
  • Al-Salim, A., & Choobineh, F. (2009). Redesign of production flow lines to postpone product differentiation. International Journal of Production Research, 47(20), 5563–5590. doi:10.1080/00207540802154837
  • Audy,Québec, J. F., Moreira, M., Westlund, K., D’Amours, S., Lebel, L., & Rönnqvist, M. (2012). Alternative logistics concepts fitting different wood supply situations and markets. In CIRRELT research report.
  • Bagchi, S. S., & Gaur, J. (2018). Optimization of postponement process for a two stage modular manufacturer. In Journal of Global Operations and Strategic Sourcing, 11(1), 39–54. doi:10.1108/JGOSS-03-2017-0009
  • Breinig, L., Brüchert, F., Haas, A., & Sauter, U. (2015). Evaluation of European beech (Fagus sylvatica L.) roundwood for improved production of strength-graded lamellas. In Conference: 5th International Scientific Conference on Hardwood Processing. Quebec City.
  • Brun, A., & Zorzini, M. (2009). Evaluation of product customization strategies through modularization and postponement. International Journal of Production Economics, 120(1), 205–220. doi:10.1016/j.ijpe.2008.07.020
  • Buehlmann, U., Edward Thomas, R., & Zuo, X. (2011). Cost minimization through optimized raw material quality composition. In Robotics and computer-integrated manufacturing - ROBOT COMPUT-INTEGR MANUF. Vol. 27. doi: 10.1016/j.rcim.2010.12.013
  • Drucker, P. F. (1995). The information executives truly need. Harvard Business Review(pp. 9). January–February 1995..
  • Espinoza, O., Buehlmann, U., Bumgardner, M., & Smith, R. (2014). Intermediaries in the U.S. hardwood lumber market: Comparing and contrasting sawmills and distributors. BioResources, 9, 6527–6539. doi:10.15376/biores.9.4.6527-6539
  • Forza, C., Salvador, F., & Trentin, A. (2008). Form postponement effects on operational performance: A typological theory. International Journal of Operations & Production Management, 28(11), 1067–1094. doi:10.1108/01443570810910197
  • Gronalt, M., & Rauch, P. (2008). Vendor managed inventory in wood processing industries - A case study. Silva Fennica, 42, 101–114. doi:10.14214/sf.267
  • Harrison, A., & Skipworth, H. (2008). Implications of form postponement to manufacturing: A cross case comparison. International Journal of Production Research, 46(1), 173–195. doi:10.1080/00207540600844076
  • Hauslmayer, H., & Gronalt, M. (2008). Mass customisation in the woodworking industry – A simulation study for the parquet flooring industry. International Journal of Mass Customisation, 2, 179. doi:10.1504/IJMASSC.2008.017139
  • Hoek, R. (2001). The rediscovery of postponement a literature review and directions for research. Journal of Operations Management, 19, 161–184. doi:10.1016/S0272-6963(00)00057-7
  • Hönnebeck, J. (2008). Untersuchungen zur Herstellung kostengünstiger Brettlamellenaus Buchenholz für Brettschichtholz [Investigations into the production of low-cost lamellas made of beech wood for glued laminated timber]. Diploma, Munich, Technische Universität München, Holzforschung München.
  • Iacocca, K., & Liberatore, M. (2018). An empirical study of service postponement. Locating the push–Pull boundary. International Journal of Production Research, 56(12), 4100–4114. doi:10.1080/00207543.2018.1436786
  • Kühle, S., Teischinger, A., & Gronalt, M. (2019). Optimal location of laminated beech production plants within the solid hardwood supply network in Austria. Silva Fennica, 53, 3. doi:10.14214/sf.10074
  • Lihra, T., Buehlmann, U., & Beauregard, R. (2008). Mass customisation of wood furniture as a competitive strategy. IJMASSC, 2(3/4), 200. doi:10.1504/IJMASSC.2008.017140
  • Liu, W., Mo, Y., Yang, Y., & Ye, Z. (2014). Decision model of customer order decoupling point on multiple customer demands in logistics service supply chain. Production Planning & Control, 26(3), 178–202. doi:10.1080/09537287.2013.879747
  • Luppold, W., & Bumgardner, M. S. (2015). Examination of worldwide hardwood lumber production, trade, and apparent consumption: 1995-2013. Wood and Fiber Science: Journal of the Society of Wood Science and Technology, 47, 283–294.
  • Nicholls, D., & Bumgardner, M. (2018). Challenges and opportunities for North American hardwood manufacturers to adopt customization strategies in an era of increased competition. Forests, 9(4), 186. doi:10.3390/f9040186
  • Ressel, J. (2002). Hochwertiges Brettschichtholz aus Buche [High-quality glued laminated beech wood] Vol. 107. Holz- Zentralblatt (pp. 1269). DRW-Verlag.
  • Saghiri, S. (2011). A structural approach to assessing postponement strategies. Construct development and validation. International Journal of Production Research, 49(21), 6427–6450. doi:10.1080/00207543.2010.531774
  • Servare Junior, M. W. J., Cardoso, P. A., Cruz, M. D. A., & Paiva, M. H. M. (2018). Mathematical model for supply chain design with time postponement. TRANSPORTES, 26(4), 1–15. doi:10.14295/transportes.v26i4.1324
  • Torno, S., Knorz, M., & van de Kuilen, J.-W. (2013). Supply of beech lamellas for the production of glued laminated timber. ISCHP 2013: International Scientific Conference on Hardwood Processing (pp. 210–217), Florence (Italy).
  • Trentin, A., Salvador, F., Forza, C., & Rungtusanatham, M. J. (2011). Operationalising form postponement from a decision-making perspective. International Journal of Production Research, 49(7), 1977–1999. doi:10.1080/00207541003657388
  • Van Kampen, T., & Van Donk, D. P. (2014). Coping with product variety in the food processing industry: The effect of form postponement. International Journal of Production Research, 52(2), 353–367. doi:10.1080/00207543.2013.825741
  • Waller, M., Dabholkar, P. A., & Gentry, J. J. (2000). Postponement, product customization, and market-oriented supply chain management. Journal of Business Logistics, 21, 133–159.
  • Wilson, S. (2018). Mix flexibility optimisation in hybrid make-to-stock/make-to-order environments in process industries. Cogent Engineering, 5, 1. doi:10.1080/23311916.2018.1501866