513
Views
18
CrossRef citations to date
0
Altmetric
Original Articles

Performance evaluation of a production line operated under an echelon buffer policy

ORCID Icon
Pages 161-177 | Received 17 Jun 2016, Accepted 02 Oct 2017, Published online: 15 Jan 2018

References

  • Agrawal, G.K. and Heragu, S.S. (2006) A survey of automated material handling systems in 300-mm semiconductor fabs. IEEE Transactions on Semiconductor Manufacturing, 19(1), 112–120.
  • Altiok, T. (1997) Performance Analysis of Manufacturing Systems, Springer Series in Operations Research, Springer, New York, NY.
  • Askin, R.G. and Fowler, J.W. (2013) Research: Executive summaries. Industrial Engineer, 45(4), 52–54.
  • Askin, R.G. and Standridge, C.R. (1993) Modeling and Analysis of Manufacturing Systems, Wiley, New York, NY.
  • Axsäter, S. and Rosling, K. (1993) Installation vs. echelon stock policies for multilevel inventory control. Management Science, 39(10), 1274–1280.
  • Baynat, B., Dallery, Y., Di Mascolo, M. and Frein, Y. (2001) A multi-class approximation technique for the analysis of kanban-like control systems. International Journal of Production Research, 39(2), 307–328.
  • Bertrand, J.W.M. and van Ooijen, H.P.G. (2002) Workload based order release and productivity: A missing link. Production Planning & Control, 13(7), 665–678.
  • Biller, S., Li, J. and Meerkov, S.M. (2009) Bottlenecks in Bernoulli serial lines with rework. IEEE Transactions on Automation Science and Engineering, 7(2), 208–217.
  • Bruell, S.C. and Balbo, G. (1980) Computational Algorithms for Closed Queueing Networks, North Holland, New York, NY.
  • Buzacott, J.A. (1967) Automatic transfer lines with buffer stocks. International Journal of Production Research, 5(3), 183–200.
  • Buzacott, J.A. (1971) The role of inventory in flow line production systems. International Journal of Production Research, 9(4), 425–436.
  • Buzacott, J.A. and Shanthikumar, J.G. (1993) Stochastic Models of Manufacturing Systems, Prentice Hall, Englewood Cliffs, NJ.
  • Clark, A.J. (1958) A dynamic, single-item, multi-echelon inventory model, Report RM-2297, ASTIA Doc. No. AD 209538, The RAND Corporation, Santa Monica, CA.
  • Colledani, M. and Gershwin, S.B. (2013) A decomposition method for approximate evaluation of continuous flow multi-stage lines with general Markovian machines. Annals of Operations Research, 209(1), 5–40.
  • Dallery, Y., David, R. and Xie, X.-L. (1988) An efficient algorithm for analysis of transfer lines with unreliable machines and finite buffers. IIE Transactions, 20(3), 280–283.
  • Dallery, Y. and Gershwin, S.B. (1992) Manufacturing flow line systems: A review of models and analytical results. Queueing Systems Theory and Applications, 12(1), 3–94.
  • Di Mascolo, M., Frein, Y. and Dallery, Y. (1996) An analytical method for the performance evaluation of kanban controlled production systems. Operations Research, 44(1), 50–64.
  • Drira, A., Pierreval, H. and Hajri-Gabouj, S. (2007) Facility layout problems: A survey. Annual Reviews in Control, 31(2), 255–267.
  • Furmans, K., Schönung, F. and Gue, K.R. (2010) Plug-and-work material handling systems, in Progress in Material Handling Research: 2010—11th International Material Handling Research Colloquium, Material Handling Institute, Milwaukee, WI, pp. 132–142.
  • Gershwin, S.B. (1987) An efficient decomposition method for the approximate evaluation of tandem queues with finite storage space and blocking. Operations Research, 35(2), 291–305.
  • Gershwin, S.B. (1994) Manufacturing Systems Engineering, Prentice-Hall, Englewood Cliffs, NJ.
  • Gershwin, S.B. and Berman, O. (1981) Analysis of transfer lines consisting of two unreliable machines with random processing times and finite storage buffers. AIIE Transactions, 13(1), 2–11.
  • Hassan, M.M.D. (1994) Machine layout problem in modern manufacturing facilities. International Journal of Production Research, 32(11), 2559–2584.
  • Koukoumialos, S. and Liberopoulos, G. (2005) An analytical method for the performance evaluation of echelon kanban control systems. OR Spectrum, 27(2), 339–368.
  • Lagershausen, S., Manitz, M. and Tempelmeier, H. (2013) Performance analysis of closed-loop assembly lines with general processing times and finite buffer spaces. IIE Transactions, 45(5), 502–515.
  • Le-Anh, T. and De Koster, M.B.M. (2006) A review of design and control of automated guided vehicle systems. European Journal of Operations Research, 171(1), 1–23.
  • Levantesi, R., Matta, A. and Tolio, T. (2003) Performance evaluation of continuous production lines with machines having different processing times and multiple failure modes. Performance Evaluation, 51(2-4), 247–268.
  • Li, J., Blumenfeld, D.E., Huang, N. and Alden, J.M. (2009) Throughput analysis of production systems: Recent advances and future topics. International Journal of Production Research, 47(14), 3823–3851.
  • Li, J. and Meerkov, S.M. (2000) Production variability in manufacturing systems: Bernoulli reliability case. Annals of Operations Research, 93(1), 299–324.
  • Li, J. and Meerkov, S.M. (2009) Production Systems Engineering, Springer, New York, NY.
  • Matta, A., Runchina, M. and Tolio, T. (2005) Automated flow lines with shared buffer. OR Spectrum, 27(2), 265–286.
  • Meerkov, S.M. and Zhang, L. (2008) Transient behavior of serial production lines with Bernoulli machines. IIE Transactions, 40(3), 297–312.
  • Meerkov, S.M. and Zhang, L. (2011) Bernoulli production lines with quality–quantity coupling machines: Monotonicity properties and bottlenecks. Annals of Operations Research, 182(1), 119–131.
  • Mitra, D. and Mitrani, I. (1989) Control and coordination policies for systems with buffers. Performance Evaluation Review, 17(1), 156–164.
  • Montoya-Torres, J.R. (2006) A literature survey on the design approaches and operational issues of automated wafer-transport systems for wafer fabs. Production Planning and Control, 17(7), 648–663.
  • Papadopoulos, H.T. and Heavey, C. (1996) Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines. European Journal of Operational Research, 92(1), 1–27.
  • Papadopoulos, H.T., Heavey, C. and Browne, J. (1993) Queueing Theory in Manufacturing Systems Analysis and Design, Chapman & Hall, London, UK.
  • Satyam, K. and Krishnamurthy, A. (2008) Performance evaluation of a multi-product system under CONWIP control. IIE Transactions, 40(3), 252–264.
  • Schuler, F. and Darabi, H. (2016) Buffer clustering for sequential production lines with deterministic processing times. International Journal of Industrial Engineering Computations, 7(4), 555–572.
  • Spearman, M.L., Woodruff, D.L. and Hopp, W.J. (1990) CONWIP: A pull alternative to kanban. International Journal of Production Research, 28(5), 879–894.
  • Shi, C. (2012) Efficient Buffer Design Algorithms for Production Line Profit Maximization. PhD Dissertation, Department of Mechanical Engineering, Massachusetts Institute of Technology, Cambridge, MA.
  • Tan, B. and Gershwin, S.B. (2009) Analysis of a general Markovian two-stage continuous-flow production system with a finite buffer. International Journal of Production Economics, 120(2), 327–339.
  • Tempelmeier, H. and Kuhn, H. (1993) Flexible Manufacturing Systems: Decision Support for Design and Operation, Wiley, New York, NY.
  • Tempelmeier, H., Kuhn, H. and Tetzlaff, U. (1989) Performance evaluation of flexible manufacturing systems with blocking. International Journal of Production Research, 27(11), 1963–1979.
  • Vis, I.F.A. (2006) Survey of research in the design and control of automated guided vehicle systems. European Journal of Operational Research, 170(3), 677–709.
  • Zhou, W. and Lian, Z. (2011) A tandem network with a sharing buffer. Applied Mathematical Modeling, 35(9), 4507–4515.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.