1,165
Views
3
CrossRef citations to date
0
Altmetric
Design & Manufacturing

Transients in flexible manufacturing systems with setups and batch operations: Modeling, analysis, and design

, &
Pages 523-540 | Received 12 Sep 2019, Accepted 30 Apr 2020, Published online: 22 Jun 2020

References

  • Allahverdi, A., Ng, C.T., Cheng, T.C.E. and Kovalyov, M.Y. (2008) A survey of scheduling problems with setup times or costs. European Journal of Operational Research, 187(3), 985–1032.
  • Allahverdi, A. and Soroush, H.M. (2008) The significance of reducing setup times/setup costs. European Journal of Operational Research, 187(3), 978–984.
  • Arinez, J., Biller, S., Meerkov, S.M. and Zhang, L. (2010) Quality/quantity improvement in an automotive paint shop: A case study. IEEE Transactions on Automation Science and Engineering, 7(4), 755–761.
  • Beach, R., Muhlemann, A.P., Price, D.H.R., Paterson, A. and Sharp, J.A. (2000) A review of manufacturing flexibility. European Journal of Operational Research, 122(1), 41–57.
  • Bouslah, B., Gharbi, A., Pellerin, R. and Hajji, A. (2013) Optimal production control policy in unreliable batch processing manufacturing systems with transportation delay. International Journal of Production Research, 51(1), 264–280.
  • Buzacott, J.A. and Shantikumar, J.G. (1993) Stochastic Models of Manufacturing Systems. Prentice Hall, Englewood Cliffs, NJ.
  • Buzacott, J.A. and Yao, D.D. (1986) Flexible manufacturing systems: A review of analytical models. Management Science, 32(7), 890–905.
  • Cárdenas-Barrón, L.E. (2008) Optimal manufacturing batch size with rework in a single-stage production system–a simple derivation. Computers & Industrial Engineering, 55(4), 758–765.
  • Chen, G., Wang, C., Zhang, L., Arinez, J. and Xiao, G. (2015) Transient performance analysis of serial production lines with geometric machines. IEEE Transactions on Automatic Control, 61(4), 877–891.
  • Chiang, S.-Y., Kuo, C.-T., Lim, J.-T. and Meerkov, S.M. (2000) Improvability of assembly systems II: Improvability indicators and case study. Mathematical Problems in Engineering, 6(4), 359–393.
  • Chiu, Y. and Shih, C.-J. (2012) Rescheduling strategies for integrating rush orders with preventive maintenance in a two-machine flow shop. International Journal of Production Research, 50(20), 5783–5794.
  • Colledani, M., Gandola, F., Matta, A. and Tolio, T. (2008) Performance evaluation of linear and non-linear multi-product multi-stage lines with unreliable machines and finite homogeneous buffers. IIE Transactions, 40(6), 612–626.
  • Colledani, M., Matta, A. and Tolio, T. (2005) Performance evaluation of production lines with finite buffer capacity producing two different products. OR Spectrum, 27(2-3), 243–263.
  • Feng, W., Zheng, L. and Li, J. (2012a) Scheduling policies in multi-product manufacturing systems with sequence-dependent setup times and finite buffers. International Journal Production Research, 50(24), 7479–7492.
  • Feng, W., Zheng, L. and Li, J. (2012b) The robustness of scheduling policies in multi-product manufacturing systems with sequence-dependent setup times and finite buffers. Computer & Industrial Engineering, 63(4), 1145–1153.
  • Feng, Y., Zhong, X., Li, J. and Fan, W. (2018) Analysis of closed loop production lines with Bernoulli reliability machines: theory and application. IISE Transactions, 50(2), 143–160.
  • Gershwin, S.B. (1994) Manufacturing Systems Engineering, Prentice Hall, Englewood Cliffs, NJ.
  • He, X., Dong, S. and Zhao, N. (2020) Research on rush order insertion rescheduling problem under hybrid flow shop based on NSGA-III. International Journal of Production Research, 58(4), 1161–1177.
  • Jamal, A.M.M., Sarker, B.R. and Mondal, S. (2004) Optimal manufacturing batch size with rework process at a single-stage production system. Computers & Industrial Engineering, 47(1), 77–89.
  • Jang, Y.J. (2007) Mathematical modeling and analysis of flexible production lines, PhD dissertation, Massachusetts Institute of Technology, Cambridge, MA.
  • Jia, Z. and Zhang, L. (2017) Transient performance analysis of closed production lines with Bernoulli machines, finite buffers, and carriers. IEEE Robotics and Automation Letters, 2(4), 1893–1900.
  • Jia, Z., Zhang, L., Arinez, J. and Xiao, G. (2016) Performance analysis of assembly systems with Bernoulli machines and finite buffers during transients. IEEE Transactions on Automation Science and Engineering, 13(2), 1018–1032.
  • Ju, F., Li, J. and Horst, J.A. (2016) Transient analysis of serial production lines with perishable products: Bernoulli reliability model. IEEE Transactions on Automatic Control, 62(2), 694–707.
  • Koo, P.-H., Robert, B. and Koh, S.-G. (2007) Determination of batch size at a bottleneck machine in manufacturing systems. International Journal of Production Research, 45(5), 1215–1231.
  • Krieg, G.N. and Kuhn, H. (2002) A decomposition method for multi-product kanban systems with setup times and lost sales. IIE Transactions, 34(7), 613–625.
  • Krieg, G.N. and Kuhn, H. (2004) Analysis of multi-product kanban systems with state-dependent setups and lost sales. Annnals of Operations Research, 125(1-4), 141–166.
  • Kuo, C.-T., Lim, J.-T. and Meerkov, S.M. (1996) Bottlenecks in serial production lines: A system-theoretic approach. Mathematical Problems in Engineering, 2(3), 233–276.
  • Li, J., Blumenfeld, D.E., Huang, N. and Alden, J.A. (2009) Throughput analysis of production systems: Recent advances and future topics. International Journal of Production Research, 47(14), 3823–3851.
  • Li, J. and Meerkov, S.M. (2001) Customer demand satisfaction in production systems: A due-time performance approach. IEEE Transactions on Robotics and Automation, 17(4), 472–482.
  • Li, J. and Meerkov, S.M. (2009) Production Systems Engineering, Springer, New York, NY.
  • Lim, J.-T. and Meerkov, S.M. (1993) On asymptotically reliable closed serial production lines. Control Engineering Practice, 1(1), 147–152.
  • Lim, J.-T., Meerkov, S.M. and Top, F. (1990) Homogeneous, asymptotically reliable serial production lines: Theory and a case study. IEEE Transactions on Automatic Control, 35(5), 524–534.
  • Meerkov, S.M. and Zhang, L. (2008) Transient behavior of serial production lines with Bernoulli machines. IIE Transactions, 40(3), 297–312.
  • Meng, G. and Heragu, S.S. (2004) Batch size modeling in a multi-item, discrete manufacturing system via an open queuing network. IIE Transactions, 36(8), 743–753.
  • Papadopoulos, C.T., Li, J. and Kelly, M.E.J. (2019) A classification and review of timed Markov models of manufacturing systems. Computers & Industrial Engineering, 128(2), 219–244.
  • Papadopoulos, H.T. and Heavey, C. (1996). Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines. European Journal of Operational Research, 92(1), 1–27.
  • Park, K., Li, J. and Feng, S.C. (2018) Scheduling policies in flexible Bernoulli lines with dedicated finite buffers. Journal of Manufacturing Systems, 48(A), 33–48.
  • Quadt, D. and Kuhn, H. (2007) Batch scheduling of jobs with identical process times on flexible flow lines. International Journal of Production Economics, 105(2), 385–401.
  • Sethi, A.K. and Sethi, S.P. (1990) Flexibility in manufacturing: A survey. International Journal of Flexible Manufacturing Systems, 2(4), 289–328.
  • Shi, D. and Daniels, R.L. (2003) A survey of manufacturing flexibility: Implications for e-business flexibility. IBM Systems Journal, 42, 414–427.
  • Tempelmeier, H. and Kuhn, H. (1993) Flexible Manufacturing Systems: Decision Support for Design and Operation. John Wiley & Sons, New York, NY.
  • Teo, C.-C., Bhatnagar, R. and Graves, S.C. (2011) Setting planned lead times for a make-to-order production system with master schedule smoothing. IIE Transactions, 43(6), 399–414.
  • Viswanadham, N. and Narahari, Y. (1992) Performance Modeling of Automated Manufacturing Systems. Prentice Hall, Englewood Cliffs, NJ.
  • Wang, C. and Li, J. (2010) Approximate analysis of reentrant lines with Bernoulli reliability model. IEEE Transactions on Automation Science and Engineering, 7(3), 708–715.
  • Wang, F., Ju, F. and Kang, N. (2019) Transient analysis and real-time control of geometric serial lines with residence time constraints. IISE Transactions, 51(7), 709–728.
  • Wang, J., Hu, Y. and Li, J. (2010a) Transient analysis to design buffer capacity in dairy filling and packing production lines. Journal of Food Engineering, 98(1), 1–12.
  • Wang, J., Li, J., Arinez, J. and Biller, S. (2010b) Product sequencing with respect to quality in flexible manufacturing systems with batch operations. IEEE Transactions on Automation Science and Engineering, 7(4), 776–790.
  • Wang, M., Huang, H. and Li, J. (2020) Transient analysis of multi-product Bernoulli serial lines with setups. IEEE Transactions on Automation Science and Engineering. doi:10.1109/TASE.2019.2963145.
  • Williams, P. and Naumann, E. (2011) Customer satisfaction and business performance: A firm-level analysis. Journal of Services Marketing, 25(1), 20–32.
  • Zhang, L., Wang, C., Arinez, J. and Biller, S. (2013) Transient analysis of Bernoulli serial lines: Performance evaluation and system-theoretic properties. IIE Transactions, 45(5), 528–543.
  • Zhao, C., Kang, N., Li, J. and Horst, J.A. (2018) Production control to reduce starvation in a partially flexible production-inventory system. IEEE Transactions on Automatic Control, 63(2), 477–491.
  • Zhao, C. and Li, J. (2014a) Analysis of multi-product manufacturing systems with homogeneous exponential machines. IEEE Transactions on Automation Science and Engineering, 11(3), 828–838.
  • Zhao, C. and Li, J. (2014b) Analysis and improvement of multi-product assembly systems: An application study at a furniture manufacturing plant. International Journal of Production Research, 52(21), 6399–6413.
  • Zhao, C. and Li, J. (2015) Analysis and improvement of multiproduct Bernoulli serial lines: Theory and application. IEEE Transactions on Systems, Man, and Cybernetics: Systems, 45, 1218–1230.
  • Zhao, C., Li, J. and Huang, N. (2016) Efficient algorithms for analysis and improvement of flexible manufacturing systems. IEEE Transactions on Automation Science and Engineering, 13(1), 105–121.
  • Zhao, C., Li, J., Huang, N. and DeCroix, G. (2017) Optimal planning of plant flexibility: Problem formulation and performance analysis. IEEE Transactions on Automation Science and Engineering, 14(2), 718–731.
  • Zhao, C., Li, J., Huang, N. and Horst, J.A. (2017) Flexible lines with setups: analysis, improvement, and application. IEEE Robotics and Automation Letters, 2(1), 120–127.
  • Zhou, M. and Venkatesh, K. (1999). Modeling, Simulation and Control of Flexible Manufacturing Systems: A Petri Net Approach. World Scientific Publishing, Singapore.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.