Flexibility and real options analysis in power system generation expansion planning under uncertainty

ORCID Icon, ORCID Icon &
Pages 832-844 | Received 27 May 2020, Accepted 28 Jul 2021, Published online: 17 Sep 2021

References

  • Aghaei, J., Amjady, N., Baharvandi, A. and Akbari, M.-A. (2014) Generation and transmission expansion planning: MILP–based probabilistic model. IEEE Transactions on Power Systems, 29(4), 1592–1601.
  • Akbari, T., Rahimikian, A. and Kazemi, A. (2011) A multi-stage stochastic transmission expansion planning method. Energy Conversion and Management, 52(8-9), 2844–2853.
  • Alizadeh, B. and Jadid, S. (2011) Reliability constrained coordination of generation and transmission expansion planning in power systems using mixed integer programming. IET Generation, Transmission & Distribution, 5(9), 948–960.
  • Antunes, C.H., Martins, A.G. and Brito, I.S. (2004) A multiple objective mixed integer linear programming model for power generation expansion planning. Energy, 29(4), 613–627.
  • Bertsimas, D. and Caramanis, C. (2010) Finite adaptability in multistage linear optimization. IEEE Transactions on Automatic Control, 55(12), 2751–2766.
  • Bienstock, D. and Mattia, S. (2007) Using mixed-integer programming to solve power grid blackout problems. Discrete Optimization, 4(1), 115–141.
  • Birge, J.R. (1982) The value of the stochastic solution in stochastic linear programs with fixed recourse. Mathematical Programming, 24(1), 314–325.
  • Cardin, M.-A. (2014) Enabling flexibility in engineering systems: A taxonomy of procedures and a design framework. Journal of Mechanical Design, 136(1), 011005.
  • Cardin, M.-A., de Neufville, R. and Geltner, D.M. (2015) Design catalogs: A systematic approach to design and value flexibility in engineering systems. Systems Engineering, 18(5), 453–471.
  • Cardin, M.-A. and Hu, J. (2016) Analyzing the tradeoffs between economies of scale, time-value of money, and flexibility in design under uncertainty: Study of centralized versus decentralized waste-to-energy systems. Journal of Mechanical Design, 138(1), 011401.
  • Cardin, M.-A., Xie, Q., Ng, T.S., Wang, S. and Hu, J. (2017) An approach for analyzing and managing flexibility in engineering systems design based on decision rules and multistage stochastic programming. IISE Transactions, 49(1), 1–12.
  • Cardin, M.-A., Zhang, S. and Nuttall, W.J. (2017) Strategic real option and flexibility analysis for nuclear power plants considering uncertainty in electricity demand and public acceptance. Energy Economics, 64, 226–237.
  • Caunhye, A.M. and Cardin, M.-A. (2017) An approach based on robust optimization and decision rules for analyzing real options in engineering systems design. IISE Transactions, 49(8), 753–767.
  • Caunhye, A.M. and Cardin, M.-A. (2018) Towards more resilient integrated power grid capacity expansion: A robust optimization approach with operational flexibility. Energy Economics, 72, 20–34.
  • Chen, W. and Yuan, C. (1999) A probabilistic-based design model for achieving flexibility in design. Journal of Mechanical Design, 121(1), 77–83.
  • Choi, J., Mount, T.D. and Thomas, R.J. (2007) Transmission expansion planning using contingency criteria. IEEE Transactions on Power Systems, 22(4), 2249–2261.
  • Chuang, A.S., Wu, F. and Varaiya, P. (2001) A game-theoretic model for generation expansion planning: Problem formulation and numerical comparisons. IEEE Transactions on Power Systems, 16(4), 885–891.
  • de Neufville, R. and Scholtes, S. (2011) Flexibility in Engineering Design. MIT Press, Cambridge, MA.
  • Dixit, A.K. and Pindyck, R. (1994) Investment under Uncertainty. NJ. Princeton University Press, Princeton, NJ.
  • Ela, E. and Kirby, B. (2008) Ercot event on February 26, 2008: Lessons learned. Technical report, National Renewable Energy Lab.(NREL), Golden, CO.
  • Falugi, P., Konstantelos, I. and Strbac, G. (2017) Planning with multiple transmission and storage investment options under uncertainty: A nested decomposition approach. IEEE Transactions on Power Systems, 33(4), 3559–3572.
  • Frank, S. and Rebennack, S. (2016) An introduction to optimal power flow: Theory, formulation, and examples. IIE Transactions, 48(12), 1172–1197.
  • Garstka, S.J. and Wets, R.J.-B. (1974) On decision rules in stochastic programming. Mathematical Programming, 7(1), 117–143.
  • Giannelos, S., Konstantelos, I. and Strbac, G. (2018) Option value of dynamic line rating and storage, in 2018 IEEE International Energy Conference, IEEE Press, Piscataway, NJ, pp. 1–6.
  • Global Wind Energy Council (2016) Global wind report 2016 – annual market update. Global Wind Energy Council, Brussels, Belgium.
  • Guma, A., Pearson, J., Wittels, K., de Neufville, R. and Geltner, D. (2009) Vertical phasing as a corporate real estate strategy and development option. Journal of Corporate Real Estate, 11(3), 144–157.
  • Harper, S.R. and Thurston, D.L. (2008) Incorporating environmental impacts in strategic redesign of an engineered system. Journal of Mechanical Design, 130(3), 031101.
  • Hemmati, R., Hooshmand, R.-A. and Khodabakhshian, A. (2013) Reliability constrained generation expansion planning with consideration of wind farms uncertainties in deregulated electricity market. Energy Conversion and Management, 76, 517–526.
  • Jiang, R., Guan, Y. and Watson, J.-P. (2016) Risk-averse stochastic unit commitment with incomplete information. IIE Transactions, 48(9), 838–854.
  • Jin, S., Ryan, S.M., Watson, J.-P. and Woodruff, D.L. (2011) Modeling and solving a large-scale generation expansion planning problem under uncertainty. Energy Systems, 2(3-4), 209–242.
  • Jin, T., Yu, Y. and Elsayed, E. (2015) Reliability and quality control for distributed wind/solar energy integration: A multi-criteria approach. IIE Transactions, 47(10), 1122–1138.
  • Kamalinia, S. and Shahidehpour, M. (2010) Generation expansion planning in wind-thermal power systems. IET Generation, Transmission & Distribution, 4(8), 940–951.
  • Khodaei, A., Bahramirad, S. and Shahidehpour, M. (2014) Microgrid planning under uncertainty. IEEE Transactions on Power Systems, 30(5), 2417–2425.
  • López, J.A., Ponnambalam, K. and Quintana, V.H. (2007) Generation and transmission expansion under risk using stochastic programming. IEEE Transactions on Power Systems, 22(3), 1369–1378.
  • Min, D. and Chung, J. (2013) Evaluation of the long-term power generation mix: The case study of South Korea’s energy policy. Energy Policy, 62, 1544–1552.
  • Motamedi, A., Zareipour, H., Buygi, M.O. and Rosehart, W.D. (2010) A transmission planning framework considering future generation expansions in electricity markets. IEEE Transactions on Power Systems, 25(4), 1987–1995.
  • Moulin, L.S., Poss, M. and Sagastizábal, C. (2010) Transmission expansion planning with re-design. Energy Systems, 1(2), 113–139.
  • Myers, S.C. and Turnbull, S.M. (1977) Capital budgeting and the capital asset pricing model: Good news and bad news. The Journal of Finance, 32(2), 321–333.
  • Papavasiliou, A., Oren, S.S. and O’Neill, R.P. (2011) Reserve requirements for wind power integration: A scenario-based stochastic programming framework. IEEE Transactions on Power Systems, 26(4), 2197–2206.
  • Park, J.-B., Park, Y.-M., Won, J.-R. and Lee, K.Y. (2000) An improved genetic algorithm for generation expansion planning. IEEE Transactions on Power Systems, 15(3), 916–922.
  • Pereira, A.J. and Saraiva, J.T. (2011) Generation expansion planning (GEP) – A long-term approach using system dynamics and genetic algorithms (GAs). Energy, 36(8), 5180–5199.
  • Pinar, A., Meza, J., Donde, V. and Lesieutre, B. (2010) Optimization strategies for the vulnerability analysis of the electric power grid. SIAM Journal on Optimization, 20(4), 1786–1810.
  • Pozo, D., Sauma, E.E. and Contreras, J. (2012) A three-level static MILP model for generation and transmission expansion planning. IEEE Transactions on Power Systems, 28(1), 202–210.
  • Quelhas, A., Gil, E., McCalley, J.D. and Ryan, S.M. (2007) A multiperiod generalized network flow model of the US integrated energy system: Part i–model description. IEEE Transactions on Power Systems, 22(2), 829–836.
  • Rebennack, S. (2014) Generation expansion planning under uncertainty with emissions quotas. Electric Power Systems Research, 114, 78–85.
  • Roh, J.H., Shahidehpour, M. and Fu, Y. (2007) Market-based coordination of transmission and generation capacity planning. IEEE Transactions on Power Systems, 22(4), 1406–1419.
  • Roh, J.H., Shahidehpour, M. and Wu, L. (2009) Market-based generation and transmission planning with uncertainties. IEEE Transactions on Power Systems, 24(3), 1587–1598.
  • Ruiz, C. and Conejo, A.J. (2015) Robust transmission expansion planning. European Journal of Operational Research, 242(2), 390–401.
  • Samarakoon, H., Shrestha, R. and Fujiwara, O. (2001) A mixed integer linear programming model for transmission expansion planning with generation location selection. International Journal of Electrical Power & Energy Systems, 23(4), 285–293.
  • Shapiro, A., Dentcheva, D. and Ruszczyński, A. (2009) Lectures on Stochastic Programming: Modeling and Theory. SIAM, Philadelphia, PA.
  • Sharan, I. and Balasubramanian, R. (2012) Integrated generation and transmission expansion planning including power and fuel transportation constraints. Energy Policy, 43, 275–284.
  • Slochanal, S.M.R., Kannan, S. and Rengaraj, R. (2004) Generation expansion planning in the competitive environment, in 2004 International Conference on Power System Technology, 2004. PowerCon 2004, Volume 2, IEEE Press, Piscataway, NJ, pp. 1546–1549.
  • Smith, J.E. and Winkler, R.L. (2006) The optimizer’s curse: Skepticism and postdecision surprise in decision analysis. Management Science, 52(3), 311–322.
  • Su, W., Wang, J. and Roh, J. (2013) Stochastic energy scheduling in microgrids with intermittent renewable energy resources. IEEE Transactions on Smart Grid, 5(4), 1876–1883.
  • Sweeney, J.L. (2013) California Electricity Crisis. Hoover Press, CA.
  • Tekiner, H., Coit, D.W. and Felder, F.A. (2010) Multi-period multi-objective electricity generation expansion planning problem with Monte-Carlo simulation. Electric Power Systems Research, 80(12), 1394–1405.
  • The PV Market alliance (2016) Global PV market report. http://www.pvmarketalliance.com/pv-market-alliance-announces-the-2016-pv-installations-at-75-gw-and-a-stable-market-in-2017/ (accessed 3 September 2021).
  • Trigeorgis, L. (1996) Real Options: Managerial Flexibility and Strategy in Resource Allocation. MIT Press, Cambridge, MA.
  • Van der Weijde, A.H. and Hobbs, B.F. (2012) The economics of planning electricity transmission to accommodate renewables: Using two-stage optimisation to evaluate flexibility and the cost of disregarding uncertainty. Energy Economics, 34(6), 2089–2101.
  • Vithayasrichareon, P., Riesz, J. and MacGill, I.F. (2015) Using renewables to hedge against future electricity industry uncertainties–an Australian case study. Energy Policy, 76, 43–56.