504
Views
1
CrossRef citations to date
0
Altmetric
Operations Engineering & Analytics

Robust optimization for integrating preventative maintenance with coal production under demand uncertainty

, &
Pages 242-258 | Received 09 Aug 2021, Accepted 05 Jul 2022, Published online: 24 Aug 2022

References

  • Adida, E. and Perakis, G. (2006) A robust optimization approach to dynamic pricing and inventory control with no backorders. Mathematical Programming, 107(1), 97–129.
  • Ang, M. and Lim, Y.F. (2019) How to optimize storage classes in a unit-load warehouse. European Journal of Operational Research, 278(1),186–201.
  • Ang, M., Lim, Y.F. and Sim, M. (2012) Robust storage allocation in unit-load warehouses. Management Science, 58(11), 2114–2130.
  • Ben-Tal, A., Golany, B., Nemirovski, A. and Vial, J.P. (2005) Retailer-supplier flexible commitments contracts: A robust optimization approach. Manufacturing and Service Operations Management, 7(3), 248–271.
  • Bertsimas, D., Brown, D.B. and Caramanis, C. (2011) Theory and applications of robust optimization. SIAM Review, 53(3), 464–501.
  • Bertsimas, D. and Dunning, I. (2016) Multistage robust mixed-integer optimization with adaptive partitions. Operations Research, 64(4), 980–998.
  • Bertsimas, D. and Georghiou, A. (2018) Binary decision rules for multistage adaptive mixed-integer optimization. Mathematical. Programming, 167(2), 395–433.
  • Bertsimas, D. and Goyal, V. (2010) On the power of robust solutions in two-stage stochastic and adaptive optimization problems. Mathematics of Operations Research, 35(2), 284–305.
  • Bertsimas, D., Goyal, V. and Lu, B.Y. (2015) A tight characterization of the performance of static solutions in two-stage adjustable robust linear optimization. Mathematical Programming, 150(2), 281–319.
  • Bertsimas, D., Iancu, D.A. and Parrilo, P.A. (2010) Optimality of affine policies in multistage robust optimization. Mathematics of Operations Research, 35(2), 363–394.
  • Bertsimas, D. and Sim, M. (2004) The price of robustness. Operations Research, 52(1), 35–53.
  • Brickey, A., Chowdu, A., Newman, A.M., Goycoolea, M. and Godard, R. (2021) Barrick’s Turquoise Ridge Gold Mine optimizes underground production scheduling operations. INFORMS Journal on Applied Analytics, 51(2), 106–118.
  • Campeau, L.P. and Gamache, M. (2020) Short-term planning optimization model for underground mines. Computers & Operations Research, 115, 104642.
  • Chansombat, S., Pongcharoen, P. and Hicks, C. (2019) A mixed-integer linear programming model for integrated production and preventive maintenance scheduling in the capital goods industry. International Journal of Production Research, 57(1), 61–82.
  • Chen, X. and Zhang, Y. (2009) Uncertain linear programs: Extended affinely adjustable robust counterparts. Operations Research, 57(6), 1469–1482.
  • Chowdu, A., Nesbitt, P., Brickey, A. and Newman A.M. (2021) Operations research in underground mine planning: A review. INFORMS Journal on Applied Analytics, 52(2), 109–132.
  • El Khoukhi, F., Boukachour, J. and Alaoui, A.E. (2017) The “Dual-Ants Colony”: A novel hybrid approach for the flexible job shop scheduling problem with preventive maintenance. Computers & Industrial Engineering, 106, 236–255.
  • Finke, G., Gara-Ali, A., Espinouse, M.L., Jost, V. and Moncel, J. (2017) Unified matrix approach to solve production-maintenance problems on a single machine. Omega, 66, 140–146.
  • Georghiou, A., Wiesemann, W. and Kuhn, D. (2014) Generalized decision rule approximations for stochastic programming via liftings. Mathematical Programming, 152(1-2), 301–338.
  • Gounaris, C.E., Wiesemann, W. and Floudas, C.A. (2013) The robust capacitated vehicle routing problem under demand uncertainty. Operations Research, 61(3), 677–693.
  • Guo, H., Zhu, K., Ding, C. and Li, L. (2010) Intelligent optimization for project scheduling of the first mining face in coal mining. Expert Systems with Applications, 37(2), 1294–1301.
  • Hajej, Z., Nidhal, R., Anis, C. and Bouzoubaa, M. (2019) An optimal integrated production and maintenance strategy for a multi-wind turbines system. International Journal of Production Research, 58(21), 6417–6440.
  • He, J., Li, Q. and Xu, D. (2016) Scheduling two parallel machines with machine-dependent availabilities. Computers & Operations Research, 55(19), 31–42.
  • IEA. (2020) Coal 2020. Available at: https://www.iea.org/reports/coal-2020 (accessed 22 July 2021).
  • Jiu, S., Zhou, Z. and Liu, J. (2013) The equipment maintenance scheduling problem in a coal production system. International Journal of Production Research, 51(17), 5309–5336.
  • Kang, K. and Subramaniam, V. (2018) Integrated control policy of production and preventive maintenance for a deteriorating manufacturing system. Computers & Industrial Engineering, 118, 266–277.
  • Kuhn, D., Wiesemann, W. and Georghiou, A. (2011) Primal and dual linear decision rules in stochastic and robust optimization. Mathematical Programming, 130(1), 177–209.
  • Lei, D.M. and Liu, M.Y. (2020) An artificial bee colony with division for distributed unrelated parallel machine scheduling with preventive maintenance. Computers & Chemical Engineering, 141, 106320.
  • Lim, Y.F. and Wang, C. (2017) Inventory management based on target-oriented robust optimization. Management Science, 63(12), 4409–4427.
  • Lim, Y.F., Jiu, S. and Ang, M. (2021) Integrating anticipative replenishment-allocation with reactive fulfillment for online retailing using robust optimization. Manufacturing & Service Operations Management, 23(6), 1616–1633.
  • Mamani, H., Nassiri, S. and Wagner, M.R. (2017) Closed-form solutions for robust inventory management. Management Science, 63(5), 1625–1643.
  • Manríquez, F., Pérez, J. and Morales, N. (2020) A simulation–optimization framework for short-term underground mine production scheduling. Optimization and Engineering, 21(3), 939–971.
  • Martinez, M.A. and Newman, A.M. (2011) A solution approach for optimizing long- and short-term production scheduling at LKAB’s Kiruna mine. European Journal of Operational Research, 211(1), 184–197.
  • Miyata, H.H., Nagano, M.S. and Gupta, J.N.D. (2019) Integrating preventive maintenance activities to the no-wait flow shop scheduling problem with dependent-sequence setup times and makespan minimization. Computers & Industrial Engineering, 135, 79–104.
  • Nesbitt, P., Blake, L.R., Lamas, P., Goycoolea, M., Pagnoncelli, B.K., Newman, A. and Brickey, A. (2021) Underground mine scheduling under uncertainty. European Journal of Operational Research, 294(1), 340–352.
  • Newman, A.M., Rubio, E., Caro, R., Weintraub, A. and Eurek, K. (2010) A review of operations research in mine planning. INFORMS Journal on Applied Analytics, 40(3), 222–245.
  • O’Sullivan, D. and Newman, A.M. (2015) Optimization-based heuristics for underground mine scheduling. European Journal of Operational Research, 241(1), 248–259.
  • Pendharkar, P.C. and Rodger, J.A. (2000) Nonlinear programming and genetic search application for production scheduling in coal mines. Annals of Operations Research, 95(1-4), 251–267.
  • Perakis, G. and Roels, G. (2010) Robust controls for network revenue management. Manufacturing and Service Operations Management, 12(1), 56–76.
  • Qiu, R., Sun, M. and Lim, Y.F. (2017) Optimizing (s, S) policies for multi-period inventory models with demand distribution uncertainty: Robust dynamic programming approaches. European Journal of Operational Research, 261(3), 880–892.
  • Reus, L., Belbz̀e, M., Feddersen, H. and Rubio, E. (2018) Extraction planning under capacity uncertainty at the Chuquicamata underground mine. INFORMS Journal on Applied Analytics, 48(6), 543–555.
  • Sarin, S.C. and West-Hansen, J. (2005) The long-term mine production scheduling problem. IIE Transactions, 37(2), 109–121.
  • See, C.T. and Sim, M. (2010) Robust approximation to multiperiod inventory management. Operations Research, 58(3), 583–594.
  • Seif, J., Yu, A.J. and Rahmanniyay, F. (2017) Modelling and optimization of a bi-objective flow shop scheduling with diverse maintenance requirements. International Journal of Production Research, 56(9), 3204–3225.
  • Shishvan, M.S. and Benndorf, J. (2019) Simulation-based optimization approach for material dispatching in continuous mining systems. European Journal of Operational Research, 275(3), 1108–1125.
  • SME. (2021) Coal’s importance to the world. Available at: https://www.smenet.org/What-We-Do/Technical-Briefings/Coal-s-Importance-in-the-US-and-Global-Energy-Supp (accessed 22 July 2021).
  • Terblanche, S. and Bley, A. (2015) An improved formulation of the underground mine scheduling optimisation problem when considering selective mining. ORiON, 31(1), 1–16.
  • Wang, S. and Yu, J. (2010) An effective heuristic for flexible job-shop scheduling problem with maintenance activities. Computers & Industrial Engineering, 59, 436–447.
  • Zhao, F., Wang, W. and Peng, P. (2015) Delay-time-based preventive maintenance modelling for a production plant: A case study in a steel mill. Journal of the Operational Research Society, 66(12), 2015–2024.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.