858
Views
1
CrossRef citations to date
0
Altmetric
Original Articles

Mathematical modelling for a fabrication–inventory problem with scrap, an acceptable stock-out level, stochastic failures and a multi-shipment policy

, , ORCID Icon &
Pages 58-71 | Received 18 Apr 2018, Accepted 26 Nov 2018, Published online: 12 Feb 2019

References

  • Abboud, N. E. (2001). Discrete-time Markov production–inventory model with machine breakdowns. Computers and Industrial Engineering, 39(1-2), 95–107. doi: 10.1016/S0360-8352(00)00070-X
  • Abilash, N., & Sivapragash, M. (2016). Optimizing the delamination failure in bamboo fiber reinforced polyester composite. Journal of King Saud University - Engineering Sciences, 28(1), 92–102. doi: 10.1016/j.jksues.2013.09.004
  • Abubakar, M., Basheer, U., & Ahmad, N. (2017). Mesoporosity, thermochemical and probabilistic failure analysis of fired locally sourced kaolinitic clay. Journal of the Association of Arab Universities for Basic and Applied Sciences, 24(1), 81–88. doi: 10.1016/j.jaubas.2017.04.002
  • Afshar-Nadjafi, B., & Afshar-Nadjafi, A. (2017). A constructive heuristic for time-dependent multi-depot vehicle routing problem with time-windows and heterogeneous fleet. Journal of King Saud University - Engineering Sciences, 29(1), 29–34. doi: 10.1016/j.jksues.2014.04.007
  • Archetti, C., Doerner, K. F., & Tricoire, F. (2013). A heuristic algorithm for the free newspaper delivery problem. European Journal of Operational Research, 230(2), 245–257. doi: 10.1016/j.ejor.2013.04.039
  • Balaji, M., Velmurugan, V., Prapa, M., & Mythily, V. (2016). A fuzzy approach for modeling and design of agile supply chains using interpretive structural modeling. Jordan Journal of Mechanical and Industrial Engineering, 10(1), 67–74.
  • Banerjee, A. (1986). A joint economic-lot-size model for purchaser and vendor. Decision Sciences, 17(3), 292–311. doi: 10.1111/j.1540-5915.1986.tb00228.x
  • Bashyam, S., & Fu, M. C. (1998). Optimization of (s, S) inventory systems with random lead times and a service level constraint. Management Science, 44(12-part-2), S243–S256. doi: 10.1287/mnsc.44.12.S243
  • Buscher, U., & Lindner, G. (2005). Optimizing a production system with rework and equal sized batch shipments. Computers & Operations Research, 32, 515–535. doi: 10.1016/j.cor.2005.03.011
  • Caiazza, R., Volpe, T., & Stanton, J. L. (2016). Global supply chain: The consolidators' role. Operations Research Perspectives, 3, 1–4. doi: 10.1016/j.orp.2015.10.001
  • Cardós, M., Babiloni, E., Palmer, M. E., & Guijarro, E. (2013). A heuristic to minimize the inventory value of repairable parts with service constraints: Application to an airline company. Journal of Industrial Engineering and Management, 6(3 SPL.ISS), 771–778.
  • Chakraborty, T., Giri, B. C., & Chaudhuri, K. S. (2008). Production lot sizing with process deterioration and machine breakdown. European Journal of Operational Research, 185(2), 606–618. doi: 10.1016/j.ejor.2007.01.011
  • Chiu, Y.-S. P. (2006). The effect of service level constraint on EPQ model with random defective rate. Mathematical Problems in Engineering, 2006 art. ID 98502, 1–13. doi: 10.1155/MPE/2006/98502
  • Chiu, Y.-S. P., Ting, C.-K., Cheng, C.-B., & Lin, F.-Y. (2007). Alternative approach for realistic lot-size problem with random scrap rate and backlogging. WSEAS Transactions on Mathematics, 6(6), 736–740.
  • Chiu, Y.-S. P., Hsieh, Y.-T., Kuo, J.-S., & Chiu, S. W. (2016). A delayed differentiation multi-product FPR model with scrap and a multi-delivery policy – I: Using single-machine production scheme. International Journal for Engineering Modelling, 29(1-4), 37–52.
  • Chiu, S. W., Liu, C.-J., Li, Y.-Y., & Chou, C.-L. (2017). Manufacturing lot size and product distribution problem with rework, outsourcing and discontinuous inventory distribution policy. International Journal for Engineering Modelling, 30(1-4), 49–61.
  • de Kok, A. G. (1985). Approximation for a lost-sales production/inventory control model with service level constraints. Management Science, 31(6), 729–737. doi: 10.1287/mnsc.31.6.729
  • Florea Ionescu, A. I., Corboş, R.-A., Popescu, R. I., & Zamfir, A. (2016). From the factory floor to the shop floor – improved supply chain for sustainable competitive advantage with item-level RFID in retail. Economic Computation and Economic Cybernetics Studies and Research, 50(4), 119–134.
  • Gopinath, S. C. B., Lakshmipriya, T., Md Arshad, M. K., Voon, C. H., Adam, T., Hashim, U., … Chinni, S. V. (2017). Shortening full-length aptamer by crawling base deletion – Assisted by Mfold web server application. Journal of the Association of Arab Universities for Basic and Applied Sciences, 23(1), 37–42. doi: 10.1016/j.jaubas.2016.07.001
  • Groenevelt, H., Pintelon, L., & Seidmann, A. (1992). Production lot sizing with machine breakdowns. Management Sciences, 38(1), 104–123. doi: 10.1287/mnsc.38.1.104
  • Hall, R. W. (1996). On the integration of production and distribution: economic order and production quantity implications. Transportation Research Part B: Methodological, 30(5), 387–403. doi: 10.1016/0191-2615(96)00002-1
  • Jaber, M. Y. (2006). Lot sizing for an imperfect production process with quality corrective interruptions and improvements, and reduction in setups. Computers & Industrial Engineering, 51(4), 781–790. doi: 10.1016/j.cie.2006.09.001
  • Jaggi, C. K., Khanna, A. & Nidhi, (2016). Effects of inflation and time value of money on an inventory system with deteriorating items and partially backlogged shortages. International Journal of Industrial Engineering Computations, 7(2), 267–282. doi: 10.5267/j.ijiec.2015.10.003
  • Jawla, P., & Singh, S. R. (2016). Multi-item economic production quantity model for imperfect items with multiple production setups and rework under the effect of preservation technology and learning environment. International Journal of Industrial Engineering Computations, 7(4), 703–716. doi: 10.5267/j.ijiec.2016.2.003
  • Jindal, P., & Solanki, A. (2016). Integrated supply chain inventory model with quality improvement involving controllable lead time and backorder price discount. International Journal of Industrial Engineering Computations, 7(3), 463–480. doi: 10.5267/j.ijiec.2015.12.003
  • Khalili, A., Ismail, M. Y., Karim, A. N. M., & Che Daud, M. R. (2017). Critical success factors for soft AQM and lean manufacturing linkage. Jordan Journal of Mechanical and Industrial Engineering, 11(2), 129–140.
  • Khan, M., Jaber, M. Y., & Ahmad, A.-R. (2014). An integrated supply chain model with errors in quality inspection and learning in production. Omega, 42(1), 16–24. doi: 10.1016/j.omega.2013.02.002
  • Kim, C. H., & Hong, Y. (1997). An extended EMQ model for a failure prone machine with general lifetime distribution. International Journal of Production Economics, 49(3), 215–223. doi: 10.1016/S0925-5273(97)00013-3
  • Lee, H., & Rosenblatt, M. (1987). Simultaneous determination of production cycle and inspection schedules in a production system. Management Science, 33(9), 1125–1136. doi: 10.1287/mnsc.33.9.1125
  • Liu, L., Liu, X., Wang, X., Wang, Y., & Li, C. (2017). Reliability analysis and evaluation of a brake system based on competing risks. Journal of Engineering Research, 5(3), 150–161.
  • Mičieta, B., Herčko, J., Botka, M., & Zrnić, N. (2016). Concept of intelligent logistic for automotive industry. Istrazivanja i Projektovanja za Privredu, 14(2), 233–238. doi: 10.5937/jaes14-10907
  • MohanDas, C. D., Ayyanar, A., Susaiyappan, S., & Kalimuthu, R. (2017). Analysis of the effects of fabrication parameters on the mechanical properties of Areca fine fiber-reinforced phenol formaldehyde composite using Taguchi technique. Journal of Applied Research and Technology, 15(4), 365–370. doi: 10.1016/j.jart.2017.03.003
  • Moinzadeh, K., & Aggarwal, P. (1997). Analysis of a production/inventory system subject to random disruptions. Management Science, 43(11), 1577–1588. doi: 10.1287/mnsc.43.11.1577
  • Oblak, L., Kuzman, M. K., & Grošelj, P. (2017). A fuzzy logic-based model for analysis and evaluation of services in a Manufacturing company. Istrazivanja i Projektovanja za Privredu, 15(3), 258–271. doi: 10.5937/jaes15-13399
  • Raj, V., & Prabha, G. (2016). Synthesis, characterization and in vitro drug release of cisplatin loaded Cassava starch acetate – PEG/gelatin nanocomposites. Journal of the Association of Arab Universities for Basic and Applied Sciences, 21(1), 10–16. doi: 10.1016/j.jaubas.2015.08.001
  • Rakyta, M., Fusko, M., Herčko, J., Závodská, L., & Zrnić, N. (2016). Proactive approach to smart maintenance and logistics as a auxiliary and service processes in a company. Istrazivanja i Projektovanja za Privredu, 14(4), 433–442. doi: 10.5937/jaes14-11664
  • Razmi, J., Kazerooni, M. P., & Sangari, M. S. (2016). Designing an integrated multi-echelon, multi-product and multi-period supply chain network with seasonal raw materials. Economic Computation and Economic Cybernetics Studies and Research, 50(1), 273–290.
  • Rivera-Gómez, H., Gharbi, A., & Kenné, J. P. (2013). Production and quality control policies for deteriorating manufacturing system. International Journal of Production Research, 51(11), 3443–3462. doi: 10.1080/00207543.2013.774494
  • Salemi, H. (2016). A hybrid algorithm for stochastic single-source capacitated facility location problem with service level requirements. International Journal of Industrial Engineering Computations, 7(2), 295–308. doi: 10.5267/j.ijiec.2015.10.001
  • Schwarz, L. B. (1973). A simple continuous review deterministic one-warehouse N-retailer inventory problem. Management Science, 19(5), 555–566. doi: 10.1287/mnsc.19.5.555
  • Selçuk, B., & Ağralı, S. (2013). Joint spare parts inventory and reliability decisions under a service constraint. Journal of the Operational Research Society, 64(3), 446–458. doi: 10.1057/jors.2012.38
  • Settanni, E., Harrington, T. S., & Srai, J. S. (2017). Pharmaceutical supply chain models: A synthesis from a systems view of operations research. Operations Research Perspectives, 4, 74–95. doi: 10.1016/j.orp.2017.05.002
  • Taft, E. W. (1918). The most economical production lot. Iron Age, 101, 1410–1412.
  • Tempelmeier, H. (2007). On the stochastic uncapacitated dynamic single-item lotsizing problem with service level constraints. European Journal of Operational Research, 181(1), 184–194. doi: 10.1016/j.ejor.2006.06.009
  • Ting, C.-K., Chiu, Y.-S. P., & Chan, C.-C. H. (2011). Optimal lot sizing with scrap and random breakdown occurring in backorder replenishing period. Mathematical and Computational Applications, 16(2), 329–339. doi: 10.3390/mca16020329
  • Zahedi, Z., Ari Samadhi, T. M. A., Suprayogi, S., & Halim, A. H. (2016). Integrated batch production and maintenance scheduling for multiple items processed on a deteriorating machine to minimize total production and maintenance costs with due date constraint. International Journal of Industrial Engineering Computations, 7(2), 229–244. doi: 10.5267/j.ijiec.2015.10.006