The Economics of Reprocessing versus Direct Disposal of Spent Nuclear Fuel

, , &
Pages 209-230 | Published online: 10 Apr 2017

References

  • J.-M. CHARPIN, B. DESSUS, and R. PELLAT, “Economic Forecast Study of the Nuclear Power Option,” Office of the Prime Minister, Paris, France (July 2000).
  • The Economics of the Nuclear Fuel Cycle, Organization for Economic Cooperation and Development, Nuclear Energy Agency, Paris, France (1994).
  • I. HENSING and W. SCHULZ, An Economic Comparison of Different Disposal Methods Used by Nuclear Power Plants: A Cost Simulation of Alternative Strategies from the German Point of View, Oldenbourg-Verlag, Munich, Germany (1995).
  • J. LAKE, “Outdated Thinking is Holding Us Back,” Washington Post, May 12, 2001.
  • “FY 2004 Detailed Budget Justifications—Office of Nuclear Energy, Science, and Technology,” U.S. Department of Energy (Feb. 2003).
  • M. BUNN, S. FETTER, J. HOLDREN, and B. VAN DER ZWAAN, “The Economics of Reprocessing vs. Direct Disposal of Spent Nuclear Fuel,” Harvard University Managing the Atom Project, Cambridge, Massachusetts (2003).
  • S. FETTER, University of Maryland School of Public Policy; available on the Internet at ⟨http://www.puaf.umd.edu/fetter⟩.
  • “The Economic and Commercial Justification for THORP,” British Nuclear Fuels Limited (1993).
  • A. MACLACHLAN, “BNFL, Overseas Customers Agree on New Reprocessing Contract Terms,” Nucl. Fuel (Oct. 15, 2001).
  • Nuclear Wastes: Technologies for Separations and Transmutation, U.S. National Research Council, Committee on Separations Technology and Transmutation Systems, National Academy Press, Washington, D.C. (1996).
  • “Nuke Fuel Reprocessing to Cost 15 Trillion Yen,” Japan Economic Newswire (May 15, 2003).
  • M. HIBBS, “More Downward Pressure Expected by Germans on Reprocessing Price,” Nucl. Fuel (Feb. 9, 1998).
  • G. VARLEY and D. COLLIER, “Fuel Cycle Cost Data,” Nuclear Assurance Corporation (Oct. 1999).
  • C. BATAILLE and R. GALLEY, The Back End of the Fuel Cycle: Part I: General Study, Office Parlementaire d’Evaluation des Choix Scientifiques et Technologiques, Paris, France (June 1998).
  • “Accelerator-Driven Systems (ADS) and Fast Reactors (FR) in Advanced Nuclear Fuel Cycles: A Comparative Study,” OECD/NEA 03109, Organization for Economic Cooperation and Development, Nuclear Energy Agency (2002).
  • Generation IV Roadmap: Report of the Fuel Cycle Crosscut Group, U.S. Department of Energy, Office of Nuclear Energy, Washington, D.C. (Mar. 2001).
  • The Cost of High-Level Waste Disposal in Geologic Repositories, Organization for Economic Cooperation and Development, Nuclear Energy Agency, Paris, France (1993).
  • “Analysis of the Total System Life Cycle Cost of the Civilian Radioactive Waste Management Program,” DOE/RW-0533, U.S. Department of Energy, Office of Civilian Radioactive Waste Management (May 2001).
  • “Nuclear Waste Fund Fee Adequacy: An Assessment,” DOE/RW-0534, U.S. Department of Energy, Office of Civilian Radioactive Waste Management (May 2001).
  • S. MATSUURA, “Analysis of the History of Cost Evaluation of High-Level Radioactive Waste Disposal,” Harvard University Managing the Atom Project, Cambridge, Massachusetts (unpublished) (2003).
  • “Scoping Assessment of Implications of Reprocessing Scenarios for Disposal Options: Paper to RWMAC,” NIREX Doc. 334004, Nirex Limited (May 2000).
  • NIREX, “Response to Questions Raised Based on Reference 334004,” Letter to MIKE SADNICKI (Nov. 22, 2000).
  • J. KANG, Princeton University, Personal Communication (May 2003).
  • B. G. CHOW and G. S. JONES, “Managing Wastes With and Without Plutonium Separation,” Report P-8035, RAND Corporation (1999).
  • Radioactive Substances Act 1993: Document Containing the Agency’s Proposed Decision on the Justification for the Plutonium Commissioning and Full Operation of the Mixed Oxide Fuel Plant, United Kingdom Environment Agency, London, United Kingdom (Oct. 1998).
  • M. HIBBS, “Utilities End Hanau MOX Support; Bonn Now Angling for Russian Pu,” Nucl. Fuel (July 6, 1995).
  • Management and Disposition of Excess Weapons Plutonium: Reactor Related Options, National Academy of Sciences, Panel on Reactor-Related Options, National Academy Press, Washington, D.C. (1995).
  • “Report to Congress: Disposition of Surplus Defense Plutonium at Savannah River Site,” National Nuclear Security Administration, Office of Fissile Materials Disposition (Feb. 15, 2002).
  • M. SADNICKI, F. BARKER, and G. MacKERRON, “Re-Examination of the Economic Case for the Sellafield MOX Plant,” Science Policy Research Unit, Sussex University, Brighton, United Kingdom (May 2000).
  • N. MOTE, “The Commercial Use of Mixed-Oxide Fuel in Light-Water Reactors,” presented at U.S. Department of Energy-RF Ministry of Atomic Energy Experts Workshop: Costing Methodologies for Economic Evaluation of Utilization Options of Weapons Plutonium from Defense Programs in the Course of Nuclear Disarmament, Obninsk, Russia, May 12–14 1999.
  • A. MacLACHLAN, “EDF Makes Case for Economic Advantage of Reprocessing over Interim Storage,” Nucl. Fuel (Oct. 7, 1996).
  • M. HIBBS, “Court Says Hesse Must Pay Siemens for Costs of Shutting MOX Plant,” Nucl. Fuel (Apr. 26, 1993).
  • “Report to Congress on the Projected Life-Cycle Costs of the U.S. and Russian Fissile Materials Disposition Programs,” U.S. National Nuclear Security Administration, Office of Fissile Materials Disposition (Mar. 30, 2001).
  • “CRWMS Modular Design Construction and Operation Options Report,” DOE/OCRWM, U.S. Department of Energy, Office of Civilian Radioactive Waste Management (Dec. 1998).
  • E. M. SUPKO, “Minimizing Risks Associated with Post-Shutdown Spent Fuel Storage and LLW Disposal,” presented at the Infocast Nuclear Power in the Competitive Era postconference workshop, Developing Risk Strategies for Successful Decommissioning, Washington, D.C., Jan. 30, 1998.
  • “Toward Implementation of Interim Storage for Recycled Fuel Resources,” Interim Report of the Nuclear Energy Working Group, Advisory Committee for Energy, Agency of Natural Resources and Energy, Ministry of Trade and Industry, Tokyo, Japan (June 11, 1998).
  • T. L. NEFF, “Decision Time for the HEU Deal,” Arms Control Today, 31, 5 (June 2001).
  • UX CONSULTING, available on the Internet at ⟨http://www.uxc.com⟩.
  • M. KNAPIK, “LES Hires Advisers to Prime Renewed Push to Site Tennessee Plant; PACE Slams USEC,” Nucl. Fuel (May 26, 2003).
  • “Trends in the Nuclear Fuel Cycle: Economic, Environmental, and Social Aspects,” OECD/NEA 03030, Organization for Economic Cooperation and Development, Nuclear Energy Agency (2002).
  • C. K. ANDERSON, “Developments in the U.S. and European LWR Fabrication Markets: A 1998 Update,” Proc. Uranium Institute: 23rd Annual Symp., London, United Kingdom, September 10–11 1998.
  • W. HENI, “Evaluation of Direct Disposal from the Point of View of One Utility and Perspectives for Waste Management,” Nucl. Technol., 121, 120 (1998).
  • “A Technology Roadmap for Generation IV Nuclear Energy Systems,” U.S. Department of Energy, Nuclear Energy Research Advisory Committee, and Generation IV International Forum (Dec. 2002).
  • J. G. DELENE, J. SHEFFIELD, K. A. WILLIAMS, R. L. REID, and S. HADLEY, “An Assessment of the Economics of Future Electric Power Generation Options and the Implications for Fusion,” ORNL TM-1999-243, Oak Ridge National Laboratory (1999).
  • J. P. CRETTE, “Review of the Western European Breeder Programs,” Energy, 23, 7–8, 581 (1998).
  • J. G. DELENE, L. C. FULLER, and C. R. HUDSON, “ALMR Deployment Economic Analysis,” ORNL TM-12344, Oak Ridge National Laboratory (1993).
  • Y. I. CHANG and C. E. TILL, “Economic Prospects of the Integral Fast Reactor (IFR) Fuel Cycle” (unpublished) (1991).
  • J. C. LEFEVRE, “European Fast Reactor 98: Outcome of Design Studies,” EFR Associates (1998).
  • S. SAVENKOV, “Minister Rumiantsev: Minatom Will Not be Privatized,” (Interview), Apr. 4, 2003 (translated by the U.S. Department of Energy).
  • C. E. BOARDMAN, M. HUI, G. CARROLL, and A. E. DUBBERLEY, “Economic Assessment of S-PRISM Including Development and Generating Costs,” General Electric Nuclear Energy.
  • H. NODA and T. INAGAKI, “Feasibility Study on Commercialized FR Cycle Systems in Japan—The Results in the First Phase and Future Plans of the Study,” presented at Global 2001: The Back End of the Fuel Cycle—From Research to Solutions, Paris, France, September 9–13 2001.
  • K. AIZAWA, Japan Nuclear Cycle Development Institute, “Feasibility Studies on Commercialized FR Cycle System,” presented at Aomori, Japan, July 22, 2000.
  • J. M. DEUTCH and E. J. MONIZ, “The Future of Nuclear Power: An Interdisciplinary MIT Study,” Massachusetts Institute of Technology (July 2003).
  • “Assumptions to the Annual Energy Outlook 2004,” DOE/EIA-0554, U.S. Department of Energy, Energy Information Administration (Feb. 2004).
  • “Technical Assessment Guide: Volume 3, Revision 8: Fundamentals and Methods—Electricity Supply,” TR-100281-V3R8, Electric Power Research Institute (1999).
  • “Uranium Industry Annual 2002,” DOE/EIA-0478, U.S. Department of Energy, Energy Information Administration (May 2003).
  • “Annual Report 2002,” Euratom Supply Agency (2003).
  • M. A. ADELMAN, “My Education in Mineral (Especially Oil) Economics,” Annu. Rev. Energy Environ., 22 (1997).
  • K. E. PORTER and D. L. EDELSTEIN, “Copper Statistics,” Open-File Report 01-006, U.S. Geological Survey (Aug. 28, 2002).
  • O. GROENVELD, “The Technology Environment for the 21st Century—The Mining Industry,” presented at Technology—Australia’s Future: New Technology for Traditional Industries, Melbourne, Australia, Nov. 1998.
  • Uranium 2001: Resources, Production, and Demand, Organization for Economic Cooperation and Development, Nuclear Energy Agency, Paris, France (2002).
  • R. PRICE and J. R. BLAISE, “Nuclear Fuel Resources: Enough to Last?” NEA News, 20.2 (2002).
  • “International Symposium Concluded that Uranium Supply for Nuclear Power is Secure,” press release 2000/26, International Atomic Energy Agency (Oct. 6, 2000).
  • T. C. POOL, “Uranium Resources for Long-Term, Large-Scale Nuclear Power Requirements,” Nonrenewable Resour., 3, 4 (1994).
  • “Cameco Increases McArthur River Uranium Reserves,” press release, Cameco (Jan. 25, 2001).
  • I. HORE-LACY, Nuclear Electricity, 7th ed., Uranium Information Centre, Ltd., Melbourne, Australia (2003).
  • K. S. DEFFEYES and I. D. MacGREGOR, “World Uranium Resources,” Sci. Am. (Jan. 1980).
  • T. KATO, K. OKUGAWA, Y. SUGIHARA, and T. MATSUMURA, “Conceptual Design of Uranium Recovery Plant from Seawater,” J. Therm. Nucl. Power Eng. Soc., 50 (1999) (in Japanese).
  • Global Energy Perspectives, N. NAKICENOVIC, A. GRÜBLER, and A. McDONALD, Eds., Cambridge University Press, Cambridge, United Kingdom (1998).
  • “Report to Congress on Advanced Fuel Cycle Initiative: The Future Path for Advanced Spent Fuel Treatment and Transmutation Research,” U.S. Department of Energy, Office of Nuclear Energy, Science, and Technology (Jan. 2003).

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.