60
Views
0
CrossRef citations to date
0
Altmetric
Technical Paper

NRC’s Significance Determination Process: Current Status and Future Trends in Assessing Risks Attributed to External Events

Pages 139-144 | Published online: 20 Mar 2017

REFERENCES

  • SECY-99-007, “Recommendations for Reactor Oversight Process Improvements,” and SECY-99-007A, “Recommendations for Reactor Oversight Process Improvements (Follow-up to SECY-99-007),” U.S. Nuclear Regulatory Commission (1999).
  • “Significance Determination Process,” Inspection Manual Chapter 0609, U.S. Nuclear Regulatory Commission (June 2, 2011).
  • “Reactor Oversight Process (ROP) Basis Document,” Inspection Manual Chapter 0308, U.S. Nuclear Regulatory Commission (Nov. 8, 2007).
  • “Risk Assessment Standardization Project (RASP) Tool Box,” Vol. 2, “External Events,” Rev. 1.01, U.S. Nuclear Regulatory Commission.
  • “Individual Plant Examination of External Events (IPEEE) for Severe Accident Vulnerabilities,” Generic Letter No. 88-20, U.S. Nuclear Regulatory Commission (1991).
  • GAO-12-465, “Nuclear Regulatory Commission: Natural Hazard Assessments Could Be More Risk-Informed,” U.S. Government Accountability Office (Apr. 26, 2012).
  • NRC Information Notice 2010-18, “Implications of Updated Probabilistic Seismic Hazard Estimates in Central and Eastern United States on Existing Plants,” U.S. Nuclear Regulatory Commission (2010).
  • B. SHERON, Memorandum to E. Leeds, ADAMS Accession Number ML120261155, “Transfer of Generic Issue 204 for Regulatory Office Implementation,” U.S. Nuclear Regulatory Commission (Mar. 6, 2012).
  • SECY-11-0093, “Near-Term Report and Recommendations for Agency Actions Following the Events in Japan,” U.S. Nuclear Regulatory Commission (July 12, 2011).
  • SECY-11-0124, “Recommended Actions to be Taken Without Delay from the Near-Term Task Force Report,” U.S. Nuclear Regulatory Commission (Oct. 18, 2011).
  • “Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Daiichi Accident,” ADAMS Accession Number ML12056A046, U.S. Nuclear Regulatory Commission (Mar. 12, 2012).
  • JLD-ISG-12-04, “Interim Staff Guidance on Performing a Seismic Margin Assessment in Response to the March 2012 Request for Information Letter,” ADAMS Accession Number ML12286A029, U.S. Nuclear Regulatory Commission (Nov. 16, 2012).
  • JLD-ISG-12-05, “Interim Staff Guidance on Performance of an Integrated Assessment for Flooding,” ADAMS Accession Number ML12311A214, U.S. Nuclear Regulatory Commission (Nov. 30, 2012).
  • “Inspection of Near-Term Task Force Recommendation 2.3 Flooding Walkdowns,” Temporary Instruction 2515/187, U.S. Nuclear Regulatory Commission (June 27, 2012).
  • “Inspection of Near-Term Task Force Recommendation 2.3 Seismic Walkdowns,” Temporary Instruction 2515/188, U.S. Nuclear Regulatory Commission (July 6, 2012).
  • Code of Federal Regulations, Title 10, “Energy,” Part 50, “Domestic Licensing of Production and Utilization Facilities,” Sec. 50.48, “Fire Protection,” (c), “National Fire Protection Association NFPA 805—(1) Approval of Incorporation by Reference,” U.S. Nuclear Regulatory Commission (June 2004).
  • “Fire Probabilistic Risk Assessment Methods Enhancements,” NUREG/CR-6850, Supplement 1, EPRI 1019259, U.S. Nuclear Regulatory Commission/Electric Power Research Institute (Dec. 2009).
  • “EPRI/NRC-RES Fire Human Reliability Analysis Guidelines,” NUREG 1921, U.S. Nuclear Regulatory Commission (July 2012).
  • “EPRI/NRC-RES Fire PRA Methodology for Nuclear Power Facilities,” NUREG/CR-6850 (EPRI 1011989), U.S. Nuclear Regulatory Commission/Electric Power Research Institute (Sep. 2006).
  • Proc. Workshop Probabilistic Flood Hazard Assessment (PFHA), Rockville, Maryland, January 29–31, 2013, U.S. Nuclear Regulatory Commission; http://www.nrc.gov/public-involve/public-meetings/meeting-archives/research-wkshps.html (current as of May 27, 2013).
  • NRC Information Notice 2012-02, “Potentially Nonconservative Screening Value for Dam Failure Frequency in Probabilistic Risk Assessments,” U.S. Nuclear Regulatory Commission (Mar. 2012).
  • F. FERRANTE, M. BENSI, and J. MITMAN, “Uncertainty Analysis for Large Dam Frequencies Based on Historical Data,” presented at 11th Int. Conf. Probabilistic Safety Assessment and Management and Annual European Safety and Reliability Conf. 2012 (PSAM11 and ESREL 2012), Helsinki, Finland, June 25–29, 2012.
  • E. COLLINS, Memorandum to D. Bannister, ADAMS Accession Number ML112490164, “Confirmatory Action Letter—Fort Calhoun Station,” U.S. Nuclear Regulatory Commission (Sep. 2, 2011).
  • “Hurricane Sandy,” Federal Emergency Management Agency; http://www.fema.gov/hurricane-sandy (current as of May 27, 2013).
  • “Hurricane Katrina,” National Oceanic and Atmospheric Administration; http://www.ncdc.noaa.gov/special-reports/katrina.html (current as of> May 27, 2013).
  • R. P. CROTEAU, Letter to J. Shea, ADAMS Accession Number ML13071A289, “Watts Bar Nuclear Plant—NRC Inspection Report 05000390/2012009; Preliminary YELLOW Findings, Preliminary WHITE Finding and Apparent Violations,” U.S. Nuclear Regulatory Commission (Mar. 12, 2013).
  • R. P. CROTEAU, Letter to J. Shea, ADAMS Accession Number ML13071A253, “Sequoyah Nuclear Plant—NRC Inspection Report 05000327/2013009, 050000328/2013009; Preliminary YELLOW FINDING and Apparent Violation,” U.S. Nuclear Regulatory Commission (Mar. 12, 2013).
  • “Use of Probabilistic Risk Assessment Methods in Nuclear Regulatory Activities; Final Policy Statement,” Federal Register, Vol. 60, No. 158 (1995).
  • “NRC Strategic Plan: Fiscal Years 2008–2013 (Updated),” NUREG-1614, Vol. 5, U.S. Nuclear Regulatory Commission (Feb. 2012).
  • “A Proposed Risk Management Regulatory Framework,” NUREG-2150, U.S. Nuclear Regulatory Commission (Apr. 2012).

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.