Insight from Fukushima Daiichi Unit 3 Investigations Using MELCOR

, &
Pages 145-160 | Published online: 20 Mar 2017

REFERENCES

  • L. J. OTT, “Advanced Severe Accident Response Models for BWR Application,” Nucl. Eng. Des., 115, 289 (1989); http://dx.doi.org/10.1016/0029-5493(89)90054-X.
  • I. K. MADNI, “MELCOR Simulation of Long-Term Station Blackout at Peach Bottom,” presented at Water Reactor Safety Research Information Mtg, Gaithersburg, Maryland, October 22–24, 1990.
  • J. J. CARBAJO, “Severe Accident Source Term Characteristics for Selected Peach Bottom Sequences Predicted by the MELCOR Code,” NUREG/CR-5942, Oak Ridge National Laboratory (July 1993).
  • M. W. FRANCIS, “Long-Term Station Blackout Sequence and Mitigation MELCOR Model,” MS Thesis, University of Tennessee, Knoxville (May 2006).
  • D. H. COOK et al., “Station Blackout at Browns Ferry Unit One—Accident Sequence Analysis,” NUREG/CR-2182, Vol. I, ORNL/NUREG/TM-455/VI, Oak Ridge National Laboratory (Nov. 1981).
  • L. J. OTT, C. F. WEBER, and C. R. HYMAN, “Station Blackout Calculations for Browns Ferry,” presented at Water Reactor Safety Research Information Mtg, Gaithersburg, Maryland, October 22, 1985.
  • S. A. HODGE and L. J. OTT, “BWRSAR Calculations of Reactor Vessel Debris Pours for Peach Bottom Short-Term Station Blackout,” Nucl. Eng. Des., 121, 327 (1990); http://dx.doi.org/10.1016/0029-5493(90)90015-P.
  • I. K. MADNI, “Analysis of Long-Term Station Blackout Without Automatic Depressurization at Peach Bottom Using MELCOR (Version 1.8),” NUREG/CR-5850, BNL-NUREG-52319, Brookhaven National Laboratory (May 1994).
  • S. BURNS to L. J. OTT, Personal Communication (Apr. 9, 2011).
  • L. J. OTT to J. L. BINDER, Personal Communication (Apr. 5, 2011).
  • R. O. GAUNTT et al., “Fukushima Daiichi Accident Study (Status as of April 2012),” SAND2012-6173, Sandia National Laboratories (July 2012).
  • “Report of Japanese Government to the IAEA Ministerial Conference on Nuclear Safety—The Accident at TEPCO’s Fukushima Nuclear Power Stations,” Nuclear Emergency Response Headquarters, Government of Japan (June 2011).
  • “Additional Report of Japanese Government to the IAEA—The Accident at TEPCO’s Fukushima Nuclear Power Stations (Second Report),” Nuclear Emergency Response Headquarters, Government of Japan (Sep. 2011).
  • “Results of Our Investigation of the Accidents and Subsequent Development at Fukushima Daiichi Nuclear Power Station,” Tokyo Electric Power Company Press Release (Dec. 22, 2011) (submitted to Japan Nuclear Energy Safety Organization).
  • “IAEA International Fact Finding Expert Mission of the Fukushima Dai-ichi NPP Accident Following the Great East Japan Earthquake and Tsunami,” International Atomic Energy Agency, Division of Nuclear Installation Safety (May 24–June 2, 2011).
  • “Review of Accident at Tokyo Electric Power Company Incorporated’s Fukushima Daiichi Nuclear Power Station and Proposed Countermeasures (Draft),” Japan Nuclear Technology Institute (Oct. 2011).
  • “Special Report on the Nuclear Accident at the Fukushima Daiichi Nuclear Power Station,” Rev. 0, INPO 11-005, Institute of Nuclear Power Operators (Nov. 2011).
  • “Fukushima Daiichi: ANS Committee Report,” American Nuclear Society Special Committee on Fukushima (Mar. 2012).
  • “Technical Knowledge of the Accident at Fukushima Dai-ichi Nuclear Power Station of Tokyo Electric Power Co., Inc. (Provisional Translation),” Nuclear and Industrial Safety Agency (Mar. 2012).
  • “The Official Report of the Fukushima Nuclear Accident Independent Investigation Commission, Executive Summary,” The Fukushima Nuclear Accident Independent Investigation Commission, The National Diet of Japan (July 2012).
  • R. O. GAUNTT et al., “MELCOR Computer Code Manuals—Reference Manuals Version 1.8.5,” NUREG/CR-6619, Rev. 2, SAND2000-2417/1, Sandia National Laboratories (Dec. 2000).
  • “Measures Taken at Fukushima Daiichi Nuclear Power Station and Fukushima Daini Nuclear Power Station (December 2011 Edition) List of Documents,” Tokyo Electric Power Company Press Release (Dec. 22, 2011).
  • “Unit 3, 4 Shift Supervisor Task Handover Journal,” English translation; http://www.tepco.co.jp/en/nu/fukushima-np/plant-data/f1_4_Nisshi3_4.pdf (accessed Dec. 1, 2011).
  • “State-of-the-Art Reactor Consequence Analyses Project, Volume 1: Peach Bottom Integrated Analysis,” NUREG/CR-7110, Vol. 1, Sandia National Laboratories (Jan. 2012).
  • “Fukushima Daiichi Nuclear Power Station Unit 3 Parameters of Water Level and Pressure,” Tokyo Electric Power Company (Dec. 1, 2011).
  • “Fukushima Daiichi Nuclear Power Station Unit 3 Parameters of Temperature,” Tokyo Electric Power Company (Dec. 1, 2011).
  • “Preliminary Survey in Torus Room of Units 2 and 3, Fukushima Daiichi NPS,” Photo and Videos Library, Tokyo Electric Power Company (Mar. 14, 2012).
  • “Fukushima Daiichi Nuclear Power Station Unit 3 Reactor Building First Floor TIP Room Environment Investigation Result (May 23, 2012),” Photo and Videos Library, Tokyo Electric Power Company (May 23, 2012).
  • “Result of Water Level Measurement at Unit 2-3 Torus Room of Fukushima Daiichi Nuclear Power Station,” Photo and Videos Library, Tokyo Electric Power Company (June 7, 2012).
  • D. H. COOK, “Pressure Suppression Pool Thermal Mixing,” NUREG/CR–3471, ORNL/TM-8906, Oak Ridge National Laboratory (Oct. 1984).
  • “Volume of Water Injected into the Reactor of Unit 1 to Unit 3 of Fukushima Nuclear Power Station,” Tokyo Electric Power Company (May 31, 2011).
  • ANSI/ANS 5.1-1979, “Decay Heat Power in Light Water Reactors,” American Nuclear Society, La Grange Park, Illinois (Aug. 1979).
  • A. G. CROFF, “ORIGEN2—A Revised and Updated Version of the Oak Ridge Isotope Generation and Depletion Code,” ORNL-5621, Oak Ridge National Laboratory (July 1980).
  • S. R. GREENE, “Role of BWR Secondary Containments in Severe Accident Mitigation: Issues and Insights from Recent Analyses,” presented at Workshop on Containment Integrity, Arlington, Virginia, June 14, 1988.
  • “Radiation Dose Measured in the Fukushima Daiichi Nuclear Power Station,” Tokyo Electric Power Company; http://www.tepco.co.jp/en/nu/fukushima-np/f1/data/2011/index-e.html (accessed April 10, 2012).
  • J. REMPE et al., “Revisiting Insights from Three Mile Island Unit 2 Postaccident Examinations and Evaluations in View of the Fukushima Daiichi Accident,” Nucl. Sci. Eng., 172, 223 (2012).

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.