References
- R. A. MATZIE et al., “Uranium Resource Utilization Improvements in the Once-Through PWR Fuel Cycle,” CEND 380/COO-2426-199, Combustion Engineering, Inc., (Apr. 1980).
- H. Y. WATT and E. E. PILAT, “Optimal Coastdown Duration for Yankee Rowe,” Trans. Am. Nucl. Soc., 22, 321 (1975).
- W. STEVENS, W. FLOURNOY, and D. PILMER, “Reduced Enrichment Requirements Through Optimal Cycle Coastdown, San Onofre Unit 1,” Trans. Am. Nucl. Soc., 24, 214 (1976).
- T. HOSHINO, “Optimum Fuel Loading and Coastdown Operation for LWR Power Stations,” Trans. Am. Nucl. Soc., 27, 466 (1977).
- D. E. KUSNER, M. A. MANN, and P. J. TURINSKY, “Planned Cycle Stretchout in PWRs,” Trans. Am. Nucl. Soc., 27, 467 (1977).
- “Nuclear Proliferation and Civilian Nuclear Power, Vol. 9: Reactor and Fuel Cycle Description,” DOE/NE-0001/9, U.S. Department of Energy (June 1980).
- R. A. SCHMIDT, “Fuel Cycle Flexibility,” Nucl. Eng. Int. (Oct. 1971).
- “Turbine Capability with Feedwater Heaters Out of Service,” GEK-37896-A, General Electric Company Operating Instructions (1975).
- Personal Communication Between Combustion Engineering, Inc. Personnel and the Engineering Staff at the Duke Power Company (July 1979).
- Combustion Engineering Standard Final Safety Analysis Report (CESSAR), Docket Number STN-50-470 (1980).
- Federal Register, 45, 14, 3913 (Jan. 21, 1980).