1
Views
0
CrossRef citations to date
0
Altmetric
Original Articles

Analysis of the Location of Coal-Fired Power Plants in the Eastern United States

Pages 243-250 | Published online: 09 Jun 2016

Literature Cited

  • Asman, A. “Belt-Haulage Economics,” Coal Age, 65 (October, 1960), pp. 112–14.
  • “Conveyors May Fit the Long Haul or Steep Slope Problem,” Engineering and Mining Journal, 166 (September, 1965), pp. 107–8.
  • Deasy, G. and P. Griess. “Factors Influencing Distribution of Steam-Electric Generating Plant,” The Professional Geographer, 12 (May, 1960), pp. 1–4.
  • Eckhardt, E. F. “Economics of Large Versus Small Haulage Units,” Mining Congress Journal, 47 (May, 1961), pp. 56–58.
  • Henderson, J. M. and A. J. Wood. “An Economic Study of High-Voltage Transmission,” Transactions of the American Institute of Electrical Engineers, 75 (August, 1956), pp. 695–704.
  • Hoover, E. The Location of Economic Activity. New York: McGraw-Hill Book Company, 1948.
  • Isard, W. Methods of Regional Analysis. Cambridge: MIT Press, 1960.
  • Landsberg, H. and S. Schurr. Energy in the United States: Sources, Uses, and Policy Issues. New York: Random House, 1968.
  • Manners, G. The Geography of Energy. Chicago: Aldine, 1964.
  • Phillips, C. N. “Economics and Developments to Expect in Transporting Energy,” Edison Electric Institute Bulletin, 21 (July, 1953), pp. 271–76.
  • “Symposium of Coffeen Station—A Mine-Mouth Plant on a Man-Made Lake,” American Power Conference, 27, pp. 540–90.
  • “The Breed Plant Story,” Electrical World, 155 (January 16, 1961), pp. 47–49.
  • U.S. Congress. Joint Committee on Atomic Energy. Nuclear Power Economics—1962 through 1967. 90th Cong., 2nd Sess., 1968.
  • U.S. Department of Commerce. Construction Review, 15 (January, 1969).
  • U.S. Federal Power Commission. Hydroelectric Power Evaluation. Washington, D.C.: Goverment Printing Office, 1968.
  • U.S. Federal Power Commission. National Power Survey, Part II. Washington, D.C.: Government Printing Office, 1964.
  • U.S. Federal Power Commission. Problems in Disposal of Waste Heat from Steam-Electric Plants: A Staff Study Supporting the Commission's 1970 National Power Survey. Washington, D.C.: Government Printing Office, 1969.
  • U.S. Federal Power Commission. Steam-Electric Plant Construction Costs and Annual Production Expenses. Washington, D.C.: Government Printing Office, various years.
  • Warner, L. “Locational Developments in the Electric Utility Industry,” Quarterly Review of Economics and Business, 4 (Spring, 1964), pp. 33–42.
  • Webb, G. “Factors Affecting the Location of Coal-Burning Steam-Electric Generating Plants,” The Professional Geographer, 19 (July, 1967), pp. 171–74.
  • Weber, A. Theory of the Location of Industries. Translated by C. Friedrich. Chicago: University of Chicago Press, 1968.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.