285
Views
17
CrossRef citations to date
0
Altmetric
Original Articles

The effect of current public procurement law on duration and cost of construction projects in Turkey

Pages 121-135 | Received 30 May 2011, Accepted 19 Mar 2012, Published online: 16 Jan 2013

References

  • Abacıoğlu , M. 1999 . Devlet ihale kanunu ve ilgili mevzuat 2 [State procurement law and related legislation 2] . Baskı, Ankara : Seçkin Yayınevi . 509 p.
  • Abu Hammad , A. A. , Ali , S. M. A. , Sweis , G. J. and Bashir , A. 2008 . Prediction model for construction cost and duration in Jordan . Jordan Journal of Civil Engineering , 2 ( 3 ) : 250 – 266 .
  • Akintoye , A. 2000 . Analysis of factors influencing project cost estimating practice , Construction Management and Economics 18 1 : 77 – 89 . http://dx.doi.org/10.1080/014461900370979
  • Akintoye , A. ; Fitzgerald , E. 2000 . A survey of current cost estimating practices in the UK , Construction Management and Economics 18 2 : 161 – 172 . http://dx.doi.org/10.1080/014461900370799
  • Aibinu , A. A. ; Odeyinka , A. 2006 . Construction delays and their causative factors in Nigeria , Journal of Construction Engineering and Management ASCE 132 7 : 667 – 677 . http://dx.doi.org/10.1061/(ASCE)0733-9364(2006)132:7(667)
  • Akpınar , H. 2000 . Veri tabanlarında bilgi keşfi ve veri madenciliği [Knowledge Discovery in Databases and Data Mining] . İstanbul Üniversitesi İşletme Fakültesi Dergisi [Journal of Istanbul University, Faculty of Business Administration] , 29 ( 1 ) : 1 – 22 .
  • Arrowsmith , S. ; Kunzlik , P. 2009 . Social and Environmental Policies in EC Procurement Law . Cambridge : Cambridge University Press . 106 p. http://dx.doi.org/10.1017/CBO9780511576041
  • Arslan , A. 2002 . 2886 sayılı kanun ile 4734 sayılı kamu ihale kanununun karşılaştırılmasI [Comparison of public procurement law by Law No. 2886 and No. 4734] . Mali KIlavuz Dergisi [Journal of Financial Guidance] , 19 : 41 – 66 .
  • Bhokha , S. and Ogunlana , S. O. 1999 . Application of artificial neural network to forecast construction duration of buildings at the pre-design stage . Engineering, Construction and Architectural Management , 6 ( 2 ) : 133 – 144 .
  • Bromilow , F. J. 1969 . Contract time performance expectations and the reality . Building Forum , 1 ( 3 ) : 70 – 80 .
  • Chan , D. W. M. ; Kumaraswamy , M. M. 1999 . Modelling and predicting construction durations in Hong Kong public housing , Construction Management and Economics 17 3 : 351 – 362 . http://dx.doi.org/10.1080/014461999371556
  • Chan , S. L. ; Park , M. 2005 . Project cost estimation using principal component regression , Construction Management and Economics 23 3 : 295 – 304 . http://dx.doi.org/10.1080/01446190500039812
  • Chang , A. S.-T. 2002 . Reasons for cost and schedule increase for engineering design projects , Journal of Management in Engineering ASCE 18 1 : 29 – 36 . http://dx.doi.org/10.1061/(ASCE)0742-597X(2002)18:1(29)
  • Cheng , M.-Y. ; Peng , H.-S. ; Wu , Y.-W. ; Chen , T.-L. 2010 . Estimate at completion for construction projects using evolutionary support vector machine inference model , Automation in Construction 19 5 : 619 – 629 . http://dx.doi.org/10.1016/j.autcon.2010.02.008
  • Dissanayaka , S. M. and Kumaraswamy , M. M. 1999 . Evaluation of factors affecting time and cost performance in Hong Kong building projects . Engineering, Construction and Architectural Management , 6 ( 3 ) : 287 – 298 .
  • Doloi , H. ; Sawhney , A. ; Iyer , K. C. ; Rentala , S. 2012 . Analysing factors affecting delays in Indian construction projects , International Journal of Project Management 30 4 : 479 – 489 . http://dx.doi.org/10.1016/j.ijproman.2011.10.004
  • Dursun , O. ; Stoy , C. 2011 . Time-cost relationship of building projects: statistical adequacy of categorization with respect to project location , Construction Management and Economics 29 1 : 97 – 106 . http://dx.doi.org/10.1080/01446193.2010.528437
  • Elhag , T. M. S. ; Boussabaine , A. H. ; Ballal , T. M. A. 2005 . Critical determinants of construction tendering costs: quantity surveyors’ standpoint , International Journal of Project Management 23 7 : 538 – 545 . http://dx.doi.org/10.1016/j.ijproman.2005.04.002
  • Emek , U. 2001 . Kamu alımlarında etkin ihale tasarımı , Türk sanayicileri ve íş adamları derneği (TUSIAD) raporu [Design of effective public procurement tender, the Turkish Industrialists and Businessmen's Association (TUSIAD) report] , Lebib Yalkın Yayımları ve Basım Isleri A.S , İstanbul , , Türkiye .
  • Ertaş , R. C. 2010 . Kamu kaynaklarının etkin kullanımı açısından kamu ihale kanununda öngörülen ihale usullerinin incelenmesi ve değerlendirilmesi [Effective use of public resources provided for the public procurement law, investigation and evaluation of procurement procedures] . Master thesis . Gazi Üniversitesi, Sosyal Bilimler Enstitüsü . 168 p.
  • European Union Delegation of the European Commission to Turkey . 2000 . AB’ de Kamu İhaleleri [In the EU Public Procurement] . Ankara , , Türkey .
  • Gencer , H. 2003 . Kamu bina yapım ihalelerinde 2886 sayılı devlet ihale kanunu ile 4734 sayılı kamu ihale kanunu'nun karşılaştırılması [Public building construction tenders and public procurement law No. 2886, Comparison of Public Procurement Law No. 4734] . TİM-SE Dergisi [Journal of TEA-SE] 207 : 14 – 19 .
  • Gorecki , P. N. 2006 . Kamu alimlarinin ekonomik ve sosyal politika araci olarak kullanimi, II [Using public procurement as a tool for economic and social policy, II] , in Uluslararası Kamu Alımları Sempozyumu, Kamu İhale Kurumu Yayınları [International Symposium on Public Procurement, Public Procurement Agency Publications] . 16 p.
  • Göçerler , A. 2002 . Kamu ihale kanunu'nun getirdiği yenilikler [The innovations of the Public Procurement Law] [online]. [Cited 15 January 2011]. Available from Internet: http://www.icisleri.gov.tr/%20Icisleri/WPX/%20kamu%20ihale%20kanunu.htm
  • Gök , Y. 2003 . Sorular ve cevaplarla açIklamalI kamu ihale kanunu, 1 [Questions and answers to explain the public procurement law, 1] . baskı, Ankara : İlksan Matbaası . 656 p.
  • Gönen , D. ; Işık , H. 1997 . Açiklamali devlet ihale kanunu ve yapim sözleşmelerinin uygulanmasi [Explaining the implementation of the public procurement law in construction contracts] . Ankara : TSOF Plaka Matbaacılık Tic. ve San. A.S. 10.baskı . 1292 p.
  • Gören , S. G. 1998 . Kamu inşaat projelerinin gerçekleştirilmesinde süre uzama nedenlerinin analizi [Analysis of public construction projects’ prolonged period of time] . PhD thesis. İTÜ Fen Bilimleri Enstitüsü .
  • Güreş , T. 1998 . Kamuya ait inşaat işlerinde süre uzatımı ve ödenek aktarımı ihtilafları [Extension of time and funds transfer of state-owned construction work conflicts] . Master Thesis. ODTÜ, Fen Bilimleri Enstitüsü .
  • Holt , G. D. 1998 . Which contractor selection methodology? , International Journal of Project Management 16 3 : 153 – 164 . http://dx.doi.org/10.1016/S0263-7863(97)00035-5
  • Inşaat Sektörü [Construction Sector] , [online]. 2011. [Cited 15 January 2011]. Available from Internet: http://www.mutluturk.com.tr/
  • Kamu İhale Kurumu [The Public Procurement Authority] . 2011 . 2010 Yılı 12 Aylık Kamu Alımları Istatistikleri [Public procurement statistics of 12 months, year 2010] [online]. [Cited 15 May 2011]. Available from Internet: http://www.ihale.gov.tr/Istatistikler_Raporlar/ihale_istatistikleri.htm
  • Kanoğlu , A. 2003 . An integrated system for duration estimation in design/build projects and organizations , Engineering, Construction and Architectural Management 10 4 : 272 – 282 . http://dx.doi.org/10.1108/09699980310489988
  • Karslı , E. D. 1998 . Inşaat süresini etkileyen faktörler ve inşaat süresi tahmin modelleri [Factors affecting the duration of the construction period and construction prediction models] . Master Thesis. İTÜ Fen Bilimleri Enstitüsü .
  • Kim , B. S. 2011 . The approximate cost estimating model for railway bridge project in the planning phase using CBR method , KSCE Journal of Civil Engineering 15 7 : 1149 – 1159 . http://dx.doi.org/10.1007/s12205-011-1342-2
  • Kim , G.-H. ; An , S.-H. ; Kang , K.-I. 2004 . Comparison of construction cost estimating models based on regression analysis, neural networks, and case-based reasoning , Building and Environment 39 10 : 1235 – 1242 . http://dx.doi.org/10.1016/j.buildenv.2004.02.013
  • Koushki , P. A. ; Al-Rashid , K. ; Kartam , N. 2005 . Delays and cost increases in the construction of private residential projects in Kuwait , Construction Management and Economics 23 : 285 – 294 . http://dx.doi.org/10.1080/0144619042000326710
  • Liao , T. S. ; Wang , M. T. ; Tserng , H. P. 2002 . A framework of electronic tendering for government procurement: a lesson learned in Taiwan , Automation in Construction 11 6 : 731 – 742 . http://dx.doi.org/10.1016/S0926-5805(02)00013-4
  • Lo , T. Y. ; Fung , I. W. ; Tung , K. C. 2006 . Construction delays in Hong Kong civil engineering projects , Journal of Construction Engineering and Management ASCE 132 6 : 636 – 649 . http://dx.doi.org/10.1061/(ASCE)0733-9364(2006)132:6(636)
  • Luu , D. T. ; Ng , S. T. ; Chen , S. E. 2003 . A case-based procurement advisory system for construction , Advances in Engineering Software 34 7 : 429 – 438 . http://dx.doi.org/10.1016/S0965-9978(03)00043-7
  • Öcal , M. E. ; Paydak , O. ; Oral , E. L. 2006 . Public procurement law in Turkey , Journal of Professional Issues in Engineering Education and Practice ASCE 132 2 : 153 – 155 . http://dx.doi.org/10.1061/(ASCE)1052-3928(2006)132:2(153)
  • Özmen , S. 2001 . İş hayati veri madenciliği ile istatistik uygulamalarini yeniden keşfediyor [Data mining and statistical applications in business life rediscovers] , [cited 15 May 2011]. Available from Internet: http//www.idari.cu.edu.tr/sempozyum/bil38.htm
  • Paydak , O. 2002 . Avrupa Birliği ve ülkemizde uygulanmakta olan ihale mevzuatının irdelenmesi [Analysis of the European Union and procurement legislation which was implemented] . Master Thesis. Çukurova Üniversitesi Fen Bilimleri Enstitüsü .
  • 2886 Sayılı Devlet Ihale Kanunu [Public Procurement Law No. 2886] , Resmi Gazete-18161 sayılı [Official Gazette No. 18161] , 1983 . Ankara, Turkey .
  • 4734 Sayılı Devlet Ihale Kanunu [Public Procurement Law No. 4734] , Resmi Gazete-24648 sayılı [Official Gazette No. 24648] , 2002 . Ankara, Turkey .
  • Sarıtaş , O. 2006 . Türk inşaat sektörü [Turkish construction sector] , [cited 15 January 2006]. Available from Internet: http://web.itu.edu.tr/%20~saritas/Turk%20Insaat%20Sektoru.pdf
  • Skitmore , R. M. and Ng , S. T. 2003 . Forecast models for actual construction time and cost . Building and Environment , 38 ( 8 ) : 1075 – 1083 .
  • Strain , J. D. ; Preece , D. A. 1999 . Project management and the integration of human factors in military system procurement , International Journal of Project Management 17 5 : 283 – 292 . http://dx.doi.org/10.1016/S0263-7863(98)00044-1
  • Tserng , H. P. ; Lin , P. H. 2002 . An accelerated subcontracting and procuring model for construction projects , Automation in Construction 11 1 : 105 – 125 . http://dx.doi.org/10.1016/S0926-5805(01)00056-5
  • Turhan , N. 2006 . Kamu ihale sistemindeki değişikliğin inşaat yatırımlarının süre ve maliyetine yansımaları [Investments in the public procurement system, change of construction time and cost implications] . Master Thesis. Çukurova Üniversitesi Fen Bilimleri Enstitüsü .
  • Tzeng , W.-L. ; Li , J. C.-C. ; Chang , T.-Y. 2006 . A study on the effectiveness of the most advantageous tendering method in the public works of Taiwan , International Journal of Project Management 24 5 : 431 – 437 . http://dx.doi.org/10.1016/j.ijproman.2006.02.007
  • Wang , Y.-R. ; Yu , C.-Y. ; Chan , H.-H. 2012 . International predicting construction cost and schedule success using artificial neural networks ensemble and support vector machines classification models , International Journal of Project Management 30 4 : 470 – 478 . http://dx.doi.org/10.1016/j.ijproman.2011.09.002
  • Williams , T. P. 2002 . Predicting completed project cost using bidding data , Construction Management and Economics 20 3 : 225 – 235 . http://dx.doi.org/10.1080/01446190110112838
  • Williams , T. P. 2003 . Predicting final cost for competitively bid construction projects using regression models , International Journal of Project Management 21 8 : 593 – 599 . http://dx.doi.org/10.1016/S0263-7863(03)00004-8
  • Wright , M. G. ; Williams , T. P. 2001 . Using bidding statistics to predict completed construction cost , The Engineering Economist 46 2 : 114 – 128 . http://dx.doi.org/10.1080/00137910108967565
  • Yakut , E. ; Elmas , B. 2011 . Işletmelerin mali başarısızlığının veri madenciliği ve diskriminant analizi modelleri ile tahmin edilmesi [Financial business and discriminant analysis models with data mining prediction of failure] , in Finans Sempozyumu [Finance Symposium] , 2011 , Malatya, 15 .
  • Yalazay , S. 2010 . Eşitlik ilkesi çerçevesinde 4734 sayılı kamu ihale kanunu kapsamındaki ihalelerde tekliflerin hazırlanması, sunulması ve değerlendirilmesi usulü [4734 within the framework of the principle of equality under the law of public procurement tenders, bid preparation, submission and evaluation procedure] . Master thesis. Gazi Üniversitesi, Sosyal Bilimler Enstitüsü [Gazi University, Institute of Social Sciences] . 140 p.
  • Yoo , W. S. 2007 . An Information-based decision making framework for evaluating and forecasting a project cost and completion date . PhD thesis. The Graduate School of The Ohio State University, USA . 305 p.
  • Zhiliang , M. ; Zhenhua , W. ; Wu , S. ; Zhe , L. 2011 . Application and extension of the IFC standard in construction cost estimating for tendering in China , Automation in Construction 20 2 : 196 – 204 . http://dx.doi.org/10.1016/j.autcon.2010.09.017

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.