References
- AbouRizk , S. M. ; Halpin , D. W. ; Wilson , J. R. 1994 . Fitting beta distributions based on sample data , Journal of Construction Engineering and Management ASCE 120 2 : 288 – 305 . http://dx.doi.org/10.1061/(ASCE)0733-9364(1994)120:2(288)
- Adler , P. S. ; Mandelbaum , A. ; Nguyen , V. ; Schwerer , E. 1995 . From project to process management: an empirically-based framework for analyzing product development time , Management Science 41 3 : 458 – 484 . http://dx.doi.org/10.1287/mnsc.41.3.458
- Akinci , B. ; Fischer , M. ; Levitt , R. ; Carlson , R. 2002 . Formalization and automation of time-space conflict analysis , Journal of Computing in Civil Engineering ASCE 16 2 : 124 – 134 . http://dx.doi.org/10.1061/(ASCE)0887-3801(2002)16:2(124)
- Arditi , D. ; Albulak , M. Z. 1986 . Line-of-balance scheduling in pavement construction , Journal of Construction Engineering and Management ASCE 112 3 : 411 – 424 . http://dx.doi.org/10.1061/(ASCE)0733-9364(1986)112:3(411)
- Arditi , D. ; Tokdemir , O. B. ; Suh , K. 2001 . Effect of learning on line-of-balance scheduling , International Journal of Project Management 19 5 : 265 – 277 . http://dx.doi.org/10.1016/S0263-7863(99)00079-4
- Arditi , D. ; Tokdemir , O. B. ; Suh , K. 2002 . Challenges in line-of-balance scheduling , Journal of Construction Engineering and Management ASCE 128 6 : 545 – 556 . http://dx.doi.org/10.1061/(ASCE)0733-9364(2002)128:6(545)
- Back , W. E. ; Boles , W. W. ; Fry , G. T. 2000 . Defining triangular probability distributions from historical cost data , Journal of Construction Engineering and Management ASCE 126 1 : 29 – 37 . http://dx.doi.org/10.1061/(ASCE)0733-9364(2000)126:1(29)
- Browning , T. R. ; Eppinger , S. D. 2002 . Modeling impact of process architecture on cost and schedule risk in product development , IEEE Transactions on Engineering Management 49 4 : 428 – 442 . http://dx.doi.org/10.1109/TEM.2002.806709
- Chang , C.-K. ; Hanna , A. S. ; Lackney , J. A. ; Sullivan , K. T. 2007 . Quantifying the impact of scheduling compression on labor productivity for mechanical and sheet metal contractor , Journal of Construction Engineering and Management ASCE 133 4 : 287 – 296 . http://dx.doi.org/10.1061/(ASCE)0733-9364(2007)133:4(287)
- Cheung , M. Y. ; O'Connor , J. T. 1996 . ArcSite: enhanced GIS for construction site layout , Journal of Construction Engineering and Management ASCE 122 4 : 329 – 336 . http://dx.doi.org/10.1061/(ASCE)0733-9364(1996)122:4(329)
- Cho , S.-H. ; Eppinger , S. D. 2005 . A simulation-based process model for managing complex design projects , IEEE Transactions on Engineering Management 52 3 : 316 – 328 . http://dx.doi.org/10.1109/TEM.2005.850722
- Cho , K. ; Hong , T. ; Hyun , C. 2011 . Scheduling model for repetitive construction process of high-rise buildings , Canadian Journal of Civil Engineering 38 1 : 36 – 48 . http://dx.doi.org/10.1139/L10-108
- El-Rayes , K. ; Moselhi , O. 1998 . Resource-driven scheduling of repetitive activities on construction projects , Construction Management and Economics 16 4 : 433 – 446 . http://dx.doi.org/10.1080/014461998372213
- Guo , S.-J. 2002 . Identification and resolution of work space conflicts in building construction , Journal of Construction Engineering and Management ASCE 128 4 : 287 – 295 . http://dx.doi.org/10.1061/(ASCE)0733-9364(2002)128:4(287)
- Halpin , D. W. and Riggs , L. S. 1992 . Planning and analysis of construction operations , 400 New York : John Wiley & Sons, Inc .
- Hong , T. ; Hastak , M. 2007 . Simulation study on construction process of FRP bridge deck panels , Automation in Construction 16 5 : 620 – 631 . http://dx.doi.org/10.1016/j.autcon.2006.10.004
- Hong , T. ; Cho , K. ; Hyun , C. ; Han , S. 2011 . Simulation based Schedule control model for core wall construction of high-rise building , Journal of Construction Engineering and Management ASCE 137 6 : 393 – 402 . http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0000300
- Hyari , K. ; El-Rayes , K. 2006 . Optimal planning and scheduling for repetitive construction projects , Journal of Management in Engineering ASCE 22 1 : 11 – 19 . http://dx.doi.org/10.1061/(ASCE)0742-597X(2006)22:1(11)
- Lee , S. ; Han , S. ; Peña-Mora , F. 2009 . Integrating construction operation and context in large-scale construction using hybrid computer simulation , Journal of Computing in Civil Engineering ASCE 23 2 : 75 – 83 . http://dx.doi.org/10.1061/(ASCE)0887-3801(2009)23:2(75)
- Li , H. ; Love , P. E. D. 1998 . Site-level facilities layout using genetic algorithms , Journal of Computing in Civil Engineering ASCE 12 4 : 227 – 231 . http://dx.doi.org/10.1061/(ASCE)0887-3801(1998)12:4(227)
- Moder , J. J. , Philips , C. R. and Davis , E. W. 1983 . Project management with CPM, PERT and precedence diagramming , 3rd ed , 389 New York : Van Nostrand Reinhold Company .
- Smith , R. P. ; Morrow , J. A. 1999 . Product development process modeling , Design Studies 20 3 : 237 – 261 . http://dx.doi.org/10.1016/S0142-694X(98)00018-0
- Taylor III , B. W. ; Moore , L. J. 1980 . R&D project planning with Q-GERT network modeling , Management Science 26 1 : 44 – 59 . http://dx.doi.org/10.1287/mnsc.26.1.44
- Thabet , W. Y. ; Beliveau , Y. J. 1994 . Modeling work space to schedule repetitive floors in multistory buildings , Journal of Construction Engineering and Management ASCE 120 1 : 96 – 116 . http://dx.doi.org/10.1061/(ASCE)0733-9364(1994)120:1(96)
- Tommelein , I. D. ; Zouein , P. P. 1993 . Interactive dynamic layout planning , Journal of Construction Engineering and Management ASCE 119 2 : 266 – 287 . http://dx.doi.org/10.1061/(ASCE)0733-9364(1993)119:2(266)
- Van Slyke , R. M. 1963 . Monte Carlo methods and PERT problem , Operations Research 11 5 : 839 – 860 . http://dx.doi.org/10.1287/opre.11.5.839
- Winch , G. M. ; North , S. 2006 . Critical space analysis , Journal of Construction Engineering and Management ASCE 132 5 : 473 – 481 . http://dx.doi.org/10.1061/(ASCE)0733-9364(2006)132:5(473)
- Yeh , I.-C. 1995 . Construction-site layout using annealed neural network , Journal of Computing in Civil Engineering ASCE 9 3 : 201 – 208 . http://dx.doi.org/10.1061/(ASCE)0887-3801(1995)9:3(201)
- Zouein , P. P. ; Tommelein , I. D. 2001 . Improvement algorithm for limited space scheduling , Journal of Construction Engineering and Management ASCE 127 2 : 116 – 124 . http://dx.doi.org/10.1061/(ASCE)0733-9364(2001)127:2(116)