References
- Abbasi, G. Y.; Arabiat, Y. A. 2000. A heuristic to maximize the net present value for resource-constrained project scheduling problems, International Journal of Project Management 32(2): 17–24.
- Ahuja, H. N. 1976. Construction performance control by network. New York: Wiley.
- Brooks, G. H.; White, C. R. 1965. An algorithm for finding optimal or near optimal solutions to the production scheduling problem, Journal of Industrial Engineering 16(1): 34–40.
- Brucker, P.; Drexl, A. 1999, Resource-constrained project scheduling: notation, classification, models, and methods, European Journal of Operational Research 112(1): 3–41. http://dx.doi.org/10.1016/S0377-2217(98)00204-5
- Bruni, M. E.; Beraldi, P.; Guerriero, F.; Pinto, E. 2011. A heuristic approach for resource constrained project scheduling with uncertain activity durations, Computers & Operations Research 38(9): 1305–1318. http://dx.doi.org/10.1016/j.cor.2010.12.004
- Chassiakos, A. P.; Sakellaropoulos, S. P. 2005. Time-cost optimization of construction projects with generalized activity constraints, Journal of Construction Engineering and Management 131(10): 365–380. http://dx.doi.org/10.1061/(ASCE)0733-9364(2005)131:10(1115)
- David, E. W.; Patterson, J. H. 1975. A comparison of heuristic and optimum solutions in resource-constrained project scheduling, Management Science 21(8): 944–955. http://dx.doi.org/10.1287/mnsc.21.8.944
- Demeulemeester, E.; Herroelen, W. A. 1992. Branch and bound procedure for the multiple resource-constrained project scheduling problems, Management Science 38(12): 1790–1803. http://dx.doi.org/10.1287/mnsc.38.12.1803
- Idoro, G. I. 2012. Comparing the planning and performance of direct labour and design-bid-build construction projects in Nigeria, Journal of Civil Engineering and Management 18(2): 184–196. http://dx.doi.org/10.3846/13923730.2012.671283
- Jaśkowski, P.; Sobotka, A. 2004. Scheduling construction projects with resources accessibility limited and changeable in time, Journal of Civil Engineering and Management 10(4): 267–276. http://dx.doi.org/10.1080/13923730.2004.9636319
- Kanıt, R.; Gündüz, M.; Özkan, Ö. 2009a. Investigating the effectiveness of certain priority rules on resource scheduling of housing estate projects, Journal of Construction Engineering and Management ASCE 135(7): 609–613. http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0000021
- Kanıt, R.; Özkan, Ö.; Gündüz, M. 2009b. Effect of project size and resource constraints on project duration through priority rule-base heuristics, AI Review Journal 32(1–4): 115–123.
- Klein, R. 2000. Project scheduling with time-varying resource constraints, International Journal of Production Research 38(16): 3937–3952. http://dx.doi.org/10.1080/00207540050176094
- Kolish, R.; Hartman, S. 1998. Heuristic algorithm for solving resource constrained project scheduling problem. Technical Paper, No 469. Kiel University.
- Leu, S. S.; Chen, A. T.; Yang, C. H. 1999. Fuzzy optimal model for resource-constrained construction scheduling, Journal of Computing in Civil Engineering 13(3): 207–216. http://dx.doi.org/10.1061/(ASCE)0887-3801(1999)13:3(207)
- Makridakis, S. 1993. Accuracy measures: theoritical and practical concerns, International Journal of Forecasting 9(4): 527–529. http://dx.doi.org/10.1016/0169-2070(93)90079-3
- Moller, A. F. 1993. A scaled conjugate gradient algorithm for fast supervised learning, Neural Networks 6(4): 525–533. http://dx.doi.org/10.1016/S0893-6080(05)80056-5
- Nassar, K. M.; Hegab, M. Y. 2006. Developing a complexity measure for project schedules, Journal of Construction Engineering and Management 132(6): 551–564. http://dx.doi.org/10.1061/(ASCE)0733-9364(2006)132:6(554)
- Ozdamar, L.; Ulusoy, G. 1996a. An Iterative local constraint based analysis for solving the resource constrained project sched-uling problem, Journal of Operations Management 14(3): 193–208. http://dx.doi.org/10.1016/0272-6963(95)00015-1
- Ozdamar, L.; Ulusoy, G. 1996b. A note on an iterative forward/backward scheduling technique with reference to a procedure by Li and Willis, European Journal of Operational Research 89(2): 400–407. http://dx.doi.org/10.1016/0377-2217(94)00272-X
- Padman, R.; Smith-Daniels, D. E. 1993. Early-tardy cost tradeoffs in resource constrained projects with cash flows: an optimization-guided heuristic approach, European Journal of Operational Research 64(2): 295–311. http://dx.doi.org/10.1016/0377-2217(93)90184-O
- Rogalska, M.; Hejducki, Z. 2007. Time buffers in construction process scheduling, Journal of Civil Engineering and Management 8(2): 143–148.
- Rumelhart, D.; McClelland, J. 1986. Parallel distributed processing. Cambridge: MIT Press.
- Schirmer, A. 1999. Resource constrained project scheduling: an evaluation of adaptive control schemes for parameterized sampling heuristic, International Journal of Operations & Production Management 39(7): 1343–1365.
- Slowinski, R. 1980. Two approaches to problems of resource allocation among project activities a comparative study, Journal of the Operational Research Society 31(8): 711–723. http://dx.doi.org/10.2307/2581688
- Talbot, F. B. 1982. Resource constrained project scheduling with time-resource tradeoffs: the non-preemptive case, Management Science 28(10): 1197–1210. http://dx.doi.org/10.1287/mnsc.28.10.1197
- Ulusoy, G.; Ozdamar, L. 1989. Heuristic performance and network resource characteristics in resource constrained project scheduling, Journal of Operations Research Society 40(12): 1145–1152. http://dx.doi.org/10.2307/2582924
- Wasserman, P. D. 1989. Neural computing: theory and practice. New York: Van Nostrand Reinhold. 230 p.
- Yang, B.; Geunes, J.; O'Brien, W. 2001. Resource-constrained project scheduling: past work and new directions, Research Report 2001-6, NSF Grant, CMS-0122193.
- Yang, K. K.; Talbot, F. B.; Patterson, J. H. 1993. Scheduling a project to maximize its net present value: an integer programming approach, European Journal of Operational Research 64(2): 188–198. http://dx.doi.org/10.1016/0377-2217(93)90176-N