- Brauers, W. K. 2003. Optimization method for a stakeholder society: a revolution in economic thinking by multi-objective optimization. New York: Kluwer Academic/Springer. 352 p.
- Brauers, W. K. 2008. Group decision making with multiobjective optimization, Foundations of Computing and Decision Sciences 33(2): 167–179.
- Brauers, W. K. 2012. Project management for a country with multiple objectives, Czech Economic Review 6, 80–101.
- Ceric, A. 2003. A framework for process-driven risk management in construction projects: PhD Thesis. Research Institute for the Built & Human Environment, School of Construction and Property Management, University of Salford. 284 p.
- Ceric, A. 2012. The principal-agent theory and the role of project managers in construction: guidlines for future research, in Proceedings of Joint CIB International Symposium W055, W065, W089, W118, TG76, TG78, TG81, TG84: Research to Practice, 26–29 June 2012, Montreal, Canada.
- Chan, A. P. C.; Yung, E. H. K.; Lam, P. T. I.; Tam, C. M.; Cheung, S. O. 2001. Application of Delphi method in selection of procurement systems for construction projects, Construction Management and Economics 19(7): 699–718. http://dx.doi.org/10.1080/01446190110066128
- Chang, C. Y.; Ive, G. 2007. The hold-up problem in the management of construction projects: a case study of the channel tunnel, International Journal of Project Management 25(4): 394–404. http://dx.doi.org/10.1016/j.ijproman.2007.01.001
- Corvellec, H.; Macheridis, N. 2010. The moral responsibilities of project selectors, International Journal of Project Management 28(3): 212–219. http://dx.doi.org/10.1016/j.ijproman.2009.05.004
- Delbecq, A. L.; Van de Ven, A. H.; Gustafsson, D. H. 1975. Group techniques for program planning: a guide to nominal group and Delphi processes. Illinois: Scott-Foresman and Co. 174 p.
- Eisenhardt, M. K. 1989. Agency theory: an assessment and review, Academy of Management Review 14(1): 57–75. http://dx.doi.org/10.2307/258191
- Ericsson, S.; Henricsson, J. P. E. 2005. Deconstructing construction competitiveness – the initial results of a Delphi survey in Finland, Sweden and the UK, in Proceedings of Construction and Building Research (COBRA) Conference, 4–8 July 2005, Brisbane, Australia.
- Hendrickson, C.; Au, T. 1989. Project management for construction: fundamental concepts for owners, engineers, architects, and builders. Pittsburg: Prentice Hall. 496 p.
- Holt, G. D.; Olomolaiye, P. O.; Harris, F. C. 1995. A review of contractor selection practice in the U.K. construction industry, Building and Environment 30(4): 553–561. http://dx.doi.org/10.1016/0360-1323(95)00008-T
- Hsu, C. C.; Sandford, B. A. 2007. The Delphi technique: making sense of consensus, Practical Assessment, Research & Evaluation 12(10): 1–8.
- Huang, C. F.; Hsueh, S. L. 2010. Customer behavior and decision making in the refurbishment industry-a data mining approach, Journal of Civil Engineering and Management 16(1): 75–84. http://dx.doi.org/10.3846/jcem.2010.07
- Ive, G.; Chang, C. Y. 2007. the principle of inconsistent trinity in the selection of procurement systems, Construction Management and Economics 25(7): 677–690. http://dx.doi.org/10.1080/01446190601164089
- Jäger, C. 2008. The principal-agent theory within the context of economic sciences. Norderstedt: Books on Demand GmbH. 60 p.
- Jensen, M. C. 2000. The theory of the firm: governance, residual claims, and organizational forms. Cambridge: Harvard University Press. 323 p.
- Kendall, M. G.; Gibbons, J. D. 1990. Rank correlation methods. London: Edward Arnold. 260 p.
- Knapp, T. R. 1990. Treating ordinal scales as interval scales: an attempt to resolve the controversy, Nursing Research 39(2): 121–123. http://dx.doi.org/10.1097/00006199-199003000-00019
- Kolltveit, B. J.; Grønhaug, K. 2004. The importance of the early phase: the case of construction and building projects, International Journal of Project Management 22(7): 545–551. http://dx.doi.org/10.1016/j.ijproman.2004.03.002
- Lindeman, C. A. 1975. Delphi-Survey of Priorities in Clinical Nursing Research, Nursing Research 24(6): 434–441. http://dx.doi.org/10.1097/00006199-197511000-00006
- Linstone, H. A.; Turoff, M. 1975. The Delphi method: techniques and applications. Michigan: Addison-Wesley. 621 p.
- Müller, R.; Turner, J. R. 2005. The impact of principal-agent relationship and contract type on communication between project owner and manager, International Journal of Project Management 23(5): 398–403. http://dx.doi.org/10.1016/j.ijproman.2005.03.001
- Okoli, C.; Pawlowski, S. D. 2004. The Delphi method as a research tool: an example, design considerations and applications, Information & Management 42(1): 15–29. http://dx.doi.org/10.1016/j.im.2003.11.002
- Park, M.; Lee, H. S.; Kwon, S. 2010. Construction knowledge evaluation using expert index, Journal of Civil Engineering and Management 16(3): 401–411. http://dx.doi.org/10.3846/jcem.2010.46
- Project Management Institute. 2009. A Guide to the project management body of knowledge. 4th edition. Project Management Institute. 459 p.
- Rosenfeld, Y.; Geltner, D. 1991. Cost-plus and incentive contracting: some false benefits and inherent drawbacks, Construction Management and Economics 9(5): 481–490. http://dx.doi.org/10.1080/01446199100000036
- Schieg, M. 2008. Strategies for avoiding asymmetric information in construction project management, Journal of Business Economics and Management 9(1): 47–51. http://dx.doi.org/10.3846/1611-1699.2008.9.47-51
- Schmidt, R. C. 1997. Managing Delphi surveys using nonparametric statistical techniques, Decision Sciences 28(3): 763–774. http://dx.doi.org/10.1111/j.1540-5915.1997.tb01330.x
- Sharkey, S. B.; Sharples, A. Y. 2001. An approach to consensus building using the Delphi technique: developing a learning resource in mental health, Nurse Education Today 21(5): 398–408. http://dx.doi.org/10.1054/nedt.2001.0573
- Siegel, S.; Castellan, N. 1988. Nonparametric statistics for the behavioural sciences. Michigan: McGraw-Hill. 399 p.
- Stevens, S. S. 1946. On the theory of scales of measurement, Science 103(2684): 677–680. http://dx.doi.org/10.1126/science.103.2684.677
- Tadelis, S. 2002. Complexity, flexibility, and the make-or-buy decision, American Economic Review 92(2): 433–437. http://dx.doi.org/10.1257/000282802320191750
- Turner, R.; Müller, R. 2004. Communication and co-operation on projects between the project owner as principal and the project manager as agent, European Management Journal 22(3): 327–336. http://dx.doi.org/10.1016/j.emj.2004.04.010
- Unsal, H. I.; Taylor, J. E. 2010. Modelling inter-firm dependency: a game-theoretic simulation to examine the hold-up problem in project networks, ASCE Journal of Construction Engineering and Management 137(4): 284–293. http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0000286
- Winch, G. 2002. Managing construction projects. New Jersey: Blackwell Science. 485 p.
- Yiu, C. Y.; Lo, S. M.; Ng, S. T.; Ng, M. M. F. 2002. Contractor selection for small building works in Hong Kong, Structural Survey 20(4): 129–135. http://dx.doi.org/10.1108/02630800210445690
- Yousuf, M. I. 2007. Using experts’ opinion through Delphi technique, Practical Assessment, Research & Evaluation 12(4): 1.
- Zavadskas, E. K.; Turskis, Z.; Tamošaitiene, J. 2010. Risk assessment of construction projects, Journal of Civil Engineering and Management 16(1): 33–46. http://dx.doi.org/10.3846/jcem.2010.03
- Zavadskas, E. K.; Vilutiene, T.; Turskis, Z.; Tamosaitiene, J. 2010. Contractor selection for construction works by applying SAW-G and topsis grey techniques, Journal of Business Economics and Management 11(1): 34–55. http://dx.doi.org/10.3846/jbem.2010.03