References
- Arbulu, R.; Ballard, G.; Harper, N. 2003. Kanban in Construction, in Proc. of the 11th Conference of the International Group for Lean Construction, 22–24 July 2003, Virginia Tech, Blacksburg, VA, 350–361.
- Asplund, E.; Danielson, U. 1991. Rata ut byggsvagen, Svenskabyggbranschens utveckhngsfond (SBUF), Stockholm, Sweden.
- Ballard, G.; Kim, Y. 2007. Implementing lean on capital projects, in Proc. of the 15thAnnual Conference of the International Group for Lean Construction, 18–20 July 2007, Detroit, MI, 88–97.
- Ballard, G. 1994. The last planner, in Proc. of the Northern California Construction Institute, 22–24 April 1994, Monterey, California. 8 p.
- Ballard, G. 2000. The last planner system of production control. PhD Thesis. School of Civil Engineering, Faculty of Engineering, The University of Birmingham, UK.
- Ballard, G. 2002. Managing work flow on design projects: a case study, Engineering Construction and Architectural Management 9(3): 284–291. http://dx.doi.org/10.1108/eb021223
- Ballard, G.; Howell, G. 1998. Shielding production: an essential step in production control, Journal of Construction Engineering and Management 124(1): 11–17. http://dx.doi.org/10.1061/(ASCE)0733-9364(1998)124:1(11)
- Ballard, G.; Kim, Y.; Jang, J.; Liu, M. 2007. Lean implementation at project level. A Research Report RR-234 to the Construction Industry Institute, September. 250 p.
- Bertrand, J. W. M.; Wortmann, J. C.; Wijngaard, J. 1990. Production control: a structural and design oriented approach. Amsterdam: Elsevier. 316 p.
- Forrester, J. W.; Senge, P. M. 2001. Tests for building confidence in system dynamics models, in TIMS studies in the management sciences 14. New York: North-Holland Publishing Company, 155–164.
- Gonzalez, V.; Alarcon, L. F.; Mundaca, F. 2008. Investigating the relationship between planning reliability and project performance, Production Planning & Control 19(5): 461–474. http://dx.doi.org/10.1080/09537280802059023
- Haas, C. T.; O'Connor, J. T.; Tucker, R. T.; Eickmann, J. A.; Fagerlund, W. R. 2000. Prefabrication and preassembly trends and effects on the construction workforce. Rep. No. 14, Center for Construction Industry Studies, Austin, Tex. 35 p.
- Hopp, W.; Spearman, M. 1996. Factory physics: foundations of manufacturing management. Boston, Massachusetts: Irwin/McGraw-Hill. 720 p.
- Jang, W.; Skibniewski, M. J. 2008. A wireless network system for automated tracking of construction materials on project sites, Journal of Civil Engineering and Management 14(1): 11–19. http://dx.doi.org/10.3846/1392-3730.2008.14.11-19
- Kim, C.; Kim, H.; Ryu, J.; Kim, C. 2011. Ubiquitous sensor network for construction material monitoring, Journal Construction Engineering and Management 137(2): 158–165. http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0000257
- Kim, Y.; Ballard G.; Park, C. 2007. A case of lean implementation: shift from lean production to lean supply chain management, in Proc. of the 15thAnnual Conference of the International Group for Lean Construction, 18–20 July 2007, Detroit, MI, 129–134.
- Kim, Y.; Ballard, G. 2011. Management thinking in the earned value method system and the last planner system, Journal of Management in Engineering 26(4): 223–228. http://dx.doi.org/10.1061/(ASCE)ME.1943-5479.0000026
- Lean Construction Institute. 2011. [online], [cited 15 July 2011]. Available from Internet: http://www.leanconstruction.org
- Liu, M.; Ballard, G.; Ibbs, W. 2011. Work flow variation and labor productivity, Journal of Management in Engineering 27(4): 236–242. http://dx.doi.org/10.1061/(ASCE)ME.1943-5479.0000056
- Moon, S.; Yang, B. 2010. Effective monitoring of the concrete pouring operation in an RFID-based environment, Journal of Computing in Civil Engineering 24(1): 108–116. http://dx.doi.org/10.1061/(ASCE)CP.1943-5487.0000004
- Pan, N.; Lee, M.; Chen, S. 2011. Construction material supply chain process analysis and optimization, Journal of Civil Engineering and Management 17(3): 357–370. http://dx.doi.org/10.3846/13923730.2011.594221
- Paulson, B. 1995. Computers and construction – midcareer reflections, Journal of Construction Engineering and Management 121(2): 197–200. http://dx.doi.org/10.1061/(ASCE)0733-9364(1995)121:2(197)
- Pserng, H.; Yin, S.; Li, S. 2006. Developing a resource supply chain planning system for construction projects, Journal of Construction Engineering and Management 132(4): 393–407. http://dx.doi.org/10.1061/(ASCE)0733-9364(2006)132:4(393)
- Sacks, R.; Treckmann, M.; Rozenfeld, O. 2009. Visualization of work flow to support lean construction, Journal of Construction Engineering and Management 135(12): 1307–1315. http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0000102
- Sobotka, A.; Czarnigowska, A. 2005. Analysis of supply system models for planning construction project logistics, Journal of Civil Engineering and Management 11(1): 73–82.
- Thomas, H.; Horman, M. 2006. Fundamental principles of workforce management, Journal of Construction Engineering and Management 132(1): 97–104. http://dx.doi.org/10.1061/(ASCE)0733-9364(2006)132:1(97)
- Tommelein, I. 1998. Pull-driven scheduling for pipe spool installation, Journal of Construction Engineering and Management 124(4): 279–288. http://dx.doi.org/10.1061/(ASCE)0733-9364(1998)124:4(279)
- Wegelius-Lehtonen, T.; Pahkala, S. 1998. Developing material delivery processes in cooperation: an application example of the construction industry, International Journal of Production Economics 56–57: 689–698. http://dx.doi.org/10.1016/S0925-5273(98)00077-2