References
- Afshar, A.; Kaveh, A.; Shoghli, O. R. 2007. Multi-objective optimization of time-cost-quality using multi-colony ant algorithm, Asian Journal of Civil Engineering (Building and Housing) 8(2): 113–124.
- Apipattanavis, S.; Sabol, K.; Molenaar, K. R.; Rahagopolan, B.; Xi, Y.; Blackard, B.; Patil, S. 2012. Integrated framework for quantifying and predicting weather-related highway construction delays, Journal of Construction Engineering and Management ASCE 136(11): 1160–1168. http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0000199 doi: 10.1061/(ASCE)CO.1943-7862.0000199
- Blaszczyk, T.; Nowak, M. 2009. The time-cost trade-off analysis in construction project using computer simulation and interactive procedure, Technological and Economic Development of Economy 15(4): 523–539. http://dx.doi.org/10.3846/1392-8619.2009.15.523-539 doi: 10.3846/1392-8619.2009.15.523-539
- Deb, K. 2001. Multi-objective optimization using evolutionary algorithm. New York: John Wiley & Sons, LTD. 497 p.
- Deb, K.; Agrawal, S.; Pratap, A.; Meyarivan, T. 2001. A fast elitist non-dominated sorting genetic algorithm for multi-objective optimization. KANGAL Report 200001. Genetic Algorithm Laboratory, Indian Institute of Technology, Kanpur, India.
- Deb, K.; Pratap, A.; Agrawal, S.; Meyarivan, T. 2002. A fast elitist multi-objective NSGA-II, IEEE Transactions on Evolutionary Computation 6(2): 182–197. http://dx.doi.org/10.1109/4235.996017 doi: 10.1109/4235.996017
- Diao, X.; Li, H.; Zeng, S.; Tam, V. W. Y.; Guo, H. 2011. A Pareto multi-objective optimization approach for solving time-cost-quality trade-off problems, Technological and Economic Development of Economy 17(1): 22–41. http://dx.doi.org/10.3846/13928619.2011.553988 doi: 10.3846/13928619.2011.553988
- Elazouni, A. M.; Abido, M. 2011. Multi-objective evolutionary finance-based scheduling: individual projects within a portfolio, Journal of Automation in Construction 20(7): 755–766. http://dx.doi.org/10.1016/j.autcon.2011.03.010 doi: 10.1016/j.autcon.2011.03.010
- El-Rayes, K.; Kandil, A. 2005. Time-cost-quality trade-off analysis for highway construction, Journal of Construction Engineering and Management ASCE 131(4): 477–486. http://dx.doi.org/10.1061/(ASCE)0733-9364(2005)131:4(477) doi: 10.1061/(ASCE)0733-9364(2005)131:4(477)
- El-Rayes, K.; Moselhi, O 2001. Impact of rainfall on the productivity of highway construction, Journal of Construction Engineering and Management ASCE 127(2): 125–131. http://dx.doi.org/10.1061/(ASCE)0733-9364(2001)127:2(125) doi: 10.1061/(ASCE)0733-9364(2001)127:2(125)
- Fathi, H.; Afshar, A. 2010. GA-based multi-objective optimization of finance-based construction project scheduling, KSCE Journal of Civil Engineering 14(5): 627–638. http://dx.doi.org/10.1007/s12205-010-0849-2 doi: 10.1007/s12205-010-0849-2
- Goldberg, D. E. 1989. Genetic Algorithms in search, optimization, and machine learning. Reading, Massachusetts: Addison-Wesley Publishing Company, Inc. 412 p.
- Jaskowski, P.; Sobotka, A. 2012. Using soft precedence relations for reduction of the construction project duration, Technological and Economic Development of Economy 18(2): 262–279. http://dx.doi.org/10.3846/20294913.2012.666217 doi: 10.3846/20294913.2012.666217
- Jiang, A.; Issa, R. R. A.; Malek, M. 2011. Construction project cash flow planning using the Pareto optimality efficiency network model, Journal of Civil Engineering and Management 17(4): 510–519. http://dx.doi.org/10.3846/13923730.2011.604537 doi: 10.3846/13923730.2011.604537
- Kalhor, E.; Khanzadi, M.; Eshtehardian, E.; Afshar, A. 2011. Stochastic time-cost optimization using non-dominated archiving ant colony approach, Automation in Construction 20(8): 1193–1203. http://dx.doi.org/10.1016/j.autcon.2011.05.003 doi: 10.1016/j.autcon.2011.05.003
- Leu, S. S.; Yang, C. H. 1999. GA-based multicriteria optimal model for construction scheduling, Journal of Construction Engineering and Management ASCE 125(3): 420–427. http://dx.doi.org/10.1061/(ASCE)0733-9364(1999)125:6(420)
- McDonald, F. 2000. Weather delays and impacts, Cost Engineering 42(5): 34–39.
- Moselhi, O.; Gong, D.; El-Rayes, K. 1997. Estimating weather impact on the duration of construction activities, Canadian Journal of Civil Engineering 24(3): 359–366. http://dx.doi.org/10.1139/l96-122 doi: 10.1139/l96-122
- Moselhi, O.; Khan, Z. 2012. Significance ranking of parameters impacting construction labour productivity, Construction Innovation: Information, Process, Management 12(3): 272–296. doi: 10.1108/14714171211244541
- NCHRP. 1978. Effect of weather on highway construction. National Cooperative Highway Construction (NCHRP) Synthesis 47, Transportation Research Board, National Research Council, Washington, D.C.
- Senouci, A. B.; Adeli, H. 2001. Resource scheduling using Neural Dynamics model of Adeli and Park, Journal of Construction Engineering and Management ASCE 127(1): 28–34. http://dx.doi.org/10.1061/(ASCE)0733-9364(2001)127:1(28) doi: 10.1061/(ASCE)0733-9364(2001)127:1(28)
- Senouci, A. B.; Eldin, N. N. 2004. Use of genetic algorithms in resource scheduling of construction projects, Journal of Construction Engineering and Management ASCE 130(6): 869–877. http://dx.doi.org/10.1061/(ASCE)0733-9364(2004)130:6(869) doi: 10.1061/(ASCE)0733-9364(2004)130:6(869)
- Senouci, A. B.; Al-Derham, H. R. 2008. Genetic algorithm-based multi-objective model for scheduling of linear construction projects, Advances in Engineering Software 39(12): 1023–1028. http://dx.doi.org/10.1016/j.advengsoft.2007.08.002 doi: 10.1016/j.advengsoft.2007.08.002
- Senouci, A. B.; El-Rayes, K. 2009. Time-profit trade-off analysis for construction projects, Journal of Construction Engineering and Management ASCE 135(8): 718–725. http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0000031 doi: 10.1061/(ASCE)CO.1943-7862.0000031
- South Dakota DOT (SDDOT). 1997. Development of working day weather charts for transportation construction in South Dakota, Final Report Study SD97-07, Rapid City, S.D.
- Thomas, H.; Yiakoumis, I. 1987. Factor model of construction productivity, Journal of Construction Engineering and Management ASCE 113(4): 623–639. http://dx.doi.org/10.1061/(ASCE)0733-9364(1987)113:4(623) doi: 10.1061/(ASCE)0733-9364(1987)113:4(623)
- Zitzler, E.; Thiele, L. 1999. Multiobjective evolutionary algorithms: a comparative case study and the strength Pareto approach, IEEE Transactions on Evolutionary Computation 3(4): 257–271. http://dx.doi.org/10.1109/4235.797969 doi: 10.1109/4235.797969