References
- Aiello, G.; Enea, M.; Galante, G. 2006. A multi-objective ap- proach to facility layout problem by genetic search algo- rithm and Electre method, Robotics and Computer-Inte- grated Manufacturing 22: 447–455. http://dx.doi.org/10.1016/j.rcim.2005.11.002 doi: 10.1016/j.rcim.2005.11.002
- Back, T.; Fogel, D.; Michalewicz, Z. 2000. Handbook of evolu- tionary computation. Bristol: IOP Publishing Ltd., Oxford University Press.
- Baykasoglu, A.; Dereli, T.; Sabuncu, I. 2006. An ant colony algorithm for solving budget constrained and unconstrained dynamic facility layout problems, Omega 34: 385–396. http://dx.doi.org/10.1016/j.omega.2004.12.001 doi: 10.1016/j.omega.2004.12.001
- Bennage, W. A.; Dhingra, A. K. 1995. Single and multi-ob- jective structural optimization in discrete-continuous variables using simulated annealing, International Journal for Numerical Methods in Engineering 38: 2753–53. http://dx.doi.org/10.1002/nme.1620381606 doi: 10.1002/nme.1620381606
- Cheung, S.; Tong, T.; Tam, C. 2002. Site pre-cast yard layout arrangement through genetic algorithms, Automation in Construction 11(1): 35–46. http://dx.doi.org/10.1016/S0926-5805(01)00044-9 doi: 10.1016/S0926-5805(01)00044-9
- Deb, S. K.; Bhattacharyya, B. 2005. Fuzzy decision support system for manufacturing facilities layout planning, Decision Support Systems 40: 305–314. http://dx.doi.org/10.1016/j.dss.2003.12.007 doi: 10.1016/j.dss.2003.12.007
- Domschke, W.; Krispin, G. 1997. Location and layout plan- ning – a survey, Operations-Research-Spektrum 19: 181– 194. http://dx.doi.org/10.1007/BF01545586 doi: 10.1007/BF01545586
- Dweiri, F.; Meier, F. A. 1996. Application of fuzzy decision- making in facilities layout planning, International Journal of Production Research 34(11): 3207–3225. http://dx.doi.org/10.1080/00207549608905085 doi: 10.1080/00207549608905085
- El-Rayes, K.; Said, H. 2010. Dynamic site layout planning us- ing approximate dynamic programming, Journal of Com- puting in Civil Engineering 23(2): 119–127. http://dx.doi.org/10.1061/(ASCE)0887-3801(2009)23:2(119) doi: 10.1061/(ASCE)0887-3801(2009)23:2(119)
- Elbeltagi, E.; Hegazy, T. 2001. A hybrid AI-based system for site layout planning in construction site, Computer-Aided Civil and Infrastructure Engineering 16(2): 79–93. http://dx.doi.org/10.1111/0885-9507.00215 doi: 10.1111/0885-9507.00215
- Elbeltagi, E.; Hegazy, T.; Hosny, A.; Eldosouky, A. 2001. Schedule-dependent evolution of site layout planning, Construction Management and Economics 19(7): 689–697. http://dx.doi.org/10.1080/01446190110066713 doi: 10.1080/01446190110066713
- Elbeltagi, E.; Hegazy, T. 2004. Dynamic layout of construction temporary facilities considering safety, Journal of Con- struction Engineering and Management 130(4): 534–541. http://dx.doi.org/10.1061/(ASCE)0733-9364(2004)130:4(534) doi: 10.1061/(ASCE)0733-9364(2004)130:4(534)
- Emre, G.; Gürcanli, G.; Muüngen, U. 2009. An occupational safety risk analysis method at construction sites using fuzzy sets, International Journal of Industrial Ergonomics 39: 371–387. http://dx.doi.org/10.1016/j.ergon.2008.10.006
- Fortenberry, J.; Cox, J. 1985. Multiple criteria approach to the facilities layout problem, International Journal of Pro- duction Research 23(4): 773–782. http://dx.doi.org/10.1080/00207548508904746 doi: 10.1080/00207548508904746
- Goldberg, D. E. 1989. Generatic algorithms in searching opti- mization and machine learning. Reading, Massachusetts: Addision Wesley.
- Gentile, M.; Rogers, W. J.; Mannan, M. S. 2003. Development of an inherent safety index based on fuzzy logic, AIChE Journal 49(4): 959–968. http://dx.doi.org/10.1002/aic.690490413 doi: 10.1002/aic.690490413
- Gang, J.; Xu, J. 2010. The resource-constraint project schedul- ing with multi-mode under fuzzy random environment in the drainage engineering of LT hydropower, International Journal of Logistics and Transportation 4(2): 53–80.
- Gangolells, M.; Casals, M.; Forcada, N.; Roca, X.; Fuertes, A. 2010. Mitigating construction safety risks using preven- tion through design, Journal of Safety Research 41: 107–122. http://dx.doi.org/10.1016/j.jsr.2009.10.007 doi: 10.1016/j.jsr.2009.10.007
- Haidar, A.; Naoum, S.; Howes, R.; Tah, J. 2009. Genetic al- gorithms application and testing for equipment selection, Journal of Construction Engineering and Management 125(1): 32–38. http://dx.doi.org/10.1061/(ASCE)0733-9364(1999)125:1(32) doi: 10.1061/(ASCE)0733-9364(1999)125:1(32)
- Kirkpatrick, S.; Gelatt, C. D.Jr.; Vecchi, M. P. 1983. Optimisa- tion by simulated annealing, Science 220: 671–680. http://dx.doi.org/10.1126/science.220.4598.671 doi: 10.1126/science.220.4598.671
- Karray, F.; Zaneldin, E.; Hegazy, T.; Shabeeb, A. H. M.; Elbelt- agi, E. 2000. Tools of soft computing as applied to the problem of facilities layout planning, IEEE Transactions on Fuzzy Systems 8(4): 367–379. http://dx.doi.org/10.1109/91.868944 doi: 10.1109/91.868944
- Li, H.; Love, P. 1998. Site-lever facilities layout using genetic algorithms, Journal of Computing in Civil Engineering 12(4): 227–231. http://dx.doi.org/10.1061/(ASCE)0887-3801(1998)12:4(227) doi: 10.1061/(ASCE)0887-3801(1998)12:4(227)
- Maravas, A.; Pantouvakis, J. 2012. Project cash flow analysis in the presence of uncertainty in activity duration and cost, International Journal of Project Management 30: 374–384. http://dx.doi.org/10.1016/j.ijproman.2011.08.005 doi: 10.1016/j.ijproman.2011.08.005
- Mawdesley, M. J.; Al-Jibouri, S. H. 2003. Proposed genetic algorithms for construction site layout, Engineering Applications of Artificial Intelligence 16: 501–509. http://dx.doi.org/10.1016/j.engappai.2003.09.002 doi: 10.1016/j.engappai.2003.09.002
- Meller, R.; Gau, K. 1996. The facility layout problem: recent and emerging trends and perspectives, Journal of Manufacturing Systems 15(5): 351–366. http://dx.doi.org/10.1016/0278-6125(96)84198-7 doi: 10.1016/0278-6125(96)84198-7
- Nicklow, J.; Reed, P.; Savic, D.; Dessalegne, T.; Harrell, L.; Chan-Hilton, A.; Karamouz, M.; Minsker, B.; Ostfeld, A.; Singh, A. 2010. State of the art for genetic algorithms and beyond in water resources planning and management, Journal of Water Resources Planning and Management 136(4): 412–432. http://dx.doi.org/10.1061/(ASCE)WR.1943-5452.0000053 doi: 10.1061/(ASCE)WR.1943-5452.0000053
- Ning, X.; Lam, K. C.; Lam, M. C. 2010. Dynamic construction site layout planning using max-min ant system, Automation in Construction 19(1): 55–65. http://dx.doi.org/10.1016/j.autcon.2009.09.002 doi: 10.1016/j.autcon.2009.09.002
- Ning, X.; Wang, L. G. 2011. Construction site layout evaluation by intuitionistic fuzzy TOPSIS model, Applied Mechanics and Materials 71: 583–588. http://dx.doi.org/10.4028/www.scientific.net/AMM.71-78.583 doi: 10.4028/www.scientific.net/AMM.71-78.583
- Rosenblatt, M. 1986. The dynamics of plant layout, Manage- ment Science 32(1): 76–86. http://dx.doi.org/10.1287/mnsc.32.1.76
- Saaty, T. L. 1980. The analytical hierarchy process. New York: McGraw-Hill.
- Soltani, A. R.; Fernando, T. 2004. A fuzzy based multi-objec- tive path planning of construction sites, Automation in Construction 13(6): 717–734. http://dx.doi.org/10.1016/j.autcon.2004.04.012 doi: 10.1016/j.autcon.2004.04.012
- Tompkins, J. A.; White, J. A.; Bozer, Y. A.; Frazelle, E. H.; Tanchoco, J. M.; Trevino, J. 1996. Facilities planning. New York: Wiley.
- Turskis, Z.; Zavadskas, E. K.; Peldschus, F. 2009. Multi-criteria optimization system for decision making in construction design and management, Inzinerine Ekonomika – Engi- neering Economics 61(1): 7–17.
- Osman, H. M.; Georgy, M. E.; Ibrahim, M. E. 2003. An auto- mated system for dynamic construction site layout plan- ning, in Tenth International Colloquium on Structural and Geotechnical Engineering, 22–24 April 2003, Ain Shams University, Cairo, Egypt.
- Urban, T. L. 1998. Solution procedures for the dynamic facil- ity layout problem, Annals of Operations Research 76: 323–342. http://dx.doi.org/10.1023/A:1018904806854 doi: 10.1023/A:1018904806854
- Xu, J.; Zhou, Y. 2010. Fuzzy-like multiple objective decision making. New York: Springer-Verlag.
- Xu, J.; Li, M. 2012. Multi-objective dynamic construction site layout planning under fuzzy random environment, Automation in Construction 27: 155–169. http://dx.doi.org/10.1016/j.autcon.2012.05.017 doi: 10.1016/j.autcon.2012.05.017
- Xu, J.; Zhang, Z. 2012. A fuzzy random resource-constrained scheduling model with multiple projects and its applica- tion to a working procedure in a large-scale water con- servancy and hydropower construction project, Journal of Scheduling 15(2): 253–272. http://dx.doi.org/10.1007/s10951-010-0173-1
- Yang, T.; Hung, C. C. 2007. Multiple-attribute decision making methods for plant layout design problem, Robotics and Computer-Integrated Manufacturing 23: 126–137. http://dx.doi.org/10.1016/j.rcim.2005.12.002 doi: 10.1016/j.rcim.2005.12.002
- Yeh, I. 1995. Construction-site layout using annealed neural network, Journal of Computing in Civil Engineering 9(3): 201–208. http://dx.doi.org/10.1061/(ASCE)0887-3801(1995)9:3(201) doi: 10.1061/(ASCE)0887-3801(1995)9:3(201)
- Zadeh, L. A. 1965. Fuzzy sets, Information and Control 8: 338–553. http://dx.doi.org/10.1016/S0019-9958(65)90241-X doi: 10.1016/S0019-9958(65)90241-X
- Zétényi, T. 1988. Fuzzy sets in psychology. North Holland: Elsevier.
- Zouein, P.; Tommelein, I. 1999. Dynamic layout planning using a hybrid incremental solution method, Journal of Con- struction Engineering and Management 125(6): 400–408. http://dx.doi.org/10.1061/(ASCE)0733-9364(1999)125:6(400) doi: 10.1061/(ASCE)0733-9364(1999)125:6(400)