References
- Ballesteros-Pérez, P. 2010. Propuesta de un nuevo modelo para la predicción de bajas en licitaciones de Construcción: Doctoral Thesis [online], [cited 21 January 2010]. Universitat Politècnica de València. Departamento de Proyectos de Ingeniería – Departament de Projectes d'Enginyeria, Spain. Available from Internet: http://hdl.handle.net/10251/7025
- Ballesteros-Pérez, P.; González-Cruz, M. C.; PastorFerrando, J. P.; Fernández-Diego, M. 2012a. The isoScore Curve Graph. A new tool for competitive bidding, Automation in Construction 22(1): 481–490. http://dx.doi.org/10.1016/j.autcon.2011.11.007.
- Ballesteros-Pérez, P.; González-Cruz, M. C.; Cañavate-Grimal, A. 2012b. Mathematical relationships between scoring parameters in capped tendering, International Journal of Project Management 30(7): 850–862. http://dx.doi.org/10.1016/j.ijproman.2012.01.008.
- Ballesteros-Pérez, P.; González-Cruz, M. C.; Cañavate-Grimal, A. 2013a. On competitive bidding: scoring and position probability graphs, International Journal of Project Management 31(3): 434–448. http://dx.doi.org/10.1016/j.ijproman.2012.09.012.
- Ballesteros-Pérez, P.; González-Cruz, M. C.; Cañavate-Grimal, A.; Pellicer, E. 2013b. Detecting abnormal and collusive bids in capped tendering, Automation in Construction 31(3): 215–229. http://dx.doi.org/10.1016/j.autcon.2012.11.036.
- Banki, M. T.; Esmaeeli, B.; Ravanshadnia, M. 2008. The assessment of bidding strategy of Iranian construction firms, International Journal of Management Science and Engineering Management 4(2): 153–160.
- Carr, P. G. 2005. Investigation of bid price competition measured through pre-bid project estimates, actual bid prices and number of bidders, Journal of Construction Engineering and Management 131(11): 1165–1172. http://dx.doi.org/10.1016/j.autcon.2012.11.036.
- Carr, R. I. 1982. General bidding model, Journal of the Construction Division 108(CO4): 639–650.
- Chao, L.; Liou, C. 2007. Risk-minimizing approach to bidcutting limit determination, Construction Management and Economics 25(8): 835–843. http://dx.doi.org/10.1080/01446190701393018.
- Deltas, G.; Engelbrecht-Wiggans, R. 2005. Naive bidding, Management Science 51(3): 328–338. http://dx.doi.org/10.1287/mnsc.1040.0330.
- Dikmen, I.; Talat, M.; Kemal, A. 2007. A case-based decision support tool for bid mark-up estimation of international construction projects, Automation in Construction 17(1): 30–44. http://dx.doi.org/10.1016/j.autcon.2007.02.009.
- Drew, D.; Skitmore, R. M. 1997. The effect of contract type and size on competitiveness in bidding, Construction Management and Economics 15: 469–489. http://dx.doi.org/10.1080/014461997372836.
- Engelbrecht-Wiggans, R. 1980. State of the art – auctions and bidding models: a survey, Management Science 26(2): 119–142. http://dx.doi.org/10.1287/mnsc.26.2.119.
- Engelbrecht-Wiggans, R. 1989. The effect of regret on optimal bidding in auctions, Management Science 35(6): 685–692. http://dx.doi.org/10.1287/mnsc.35.6.685.
- Fayek, A. 1998. Competitive bidding strategy model and software system for bid preparation, Journal of Construction Engineering and Management 124(1): 1–10. http://dx.doi.org/10.1061/(ASCE)0733-9364(1998)124:1(1).
- Friedman, L. 1956. A competitive bidding strategy, Operations Research 1(4): 104–12. http://dx.doi.org/10.1287/opre.4.1.104.
- Gates, M. 1967. Bidding strategies and probabilities, Journal of the Construction Division 93(CO1): 75–107.
- Harstad, R. M.; SašaPekec, A. 2008. Relevance to practice and auction theory: a memorial essay for Michael Rothkopf, Interfaces 38(5): 367–380. http://dx.doi.org/10.1287/inte.1080.0396.
- Jiménez-Castillo, D.; Sánchez-Pérez, M. 2013. Nurturing employee market knowledge absorptive capacity through unified internal communication and integrated information technology, Information & Management 50(2–3): 76–86.
- Kayhan, V. O.; McCart, J. A.; Bhattacherjee, A. 2002. Crossbidding in simultaneous online auctions: antecedents and consequences, Information & Management 47(7–8): 325–332.
- Lesca, N.; Caron-Fasan, M. L.; Falcy, S. 2012. How managers interpret scanning information, Information & Management 49(2): 126–134. http://dx.doi.org/10.1016/j.im.2012.01.004.
- Lo, W.; Lin, C. L.; Yan, M. R. 2007. Contractor's opportunistic bidding behavior and equilibrium price level in the construction market, Journal of Construction Engineering and Management 133(6): 409–416. http://dx.doi.org/10.1061/(ASCE)0733-9364(2007)133:6(409).
- McCaffer, R.; Pettitt, A. N. 1976. Distribution of bids for buildings and road contracts, Operational Research Quarterly 27(4): 835–843. http://dx.doi.org/10.2307/3009167.
- Mitchell, M. S. 1977. The probability of being the lowest bidder, Journal of the Royal Statistical Society: Series C (Applied Statistics) 26(2): 191–194.
- Naoum, S. G. 1994. Critical analysis of time and cost of management and traditional contracts, Journal of Construction Engineering and Management 120(4): 687–705. http://dx.doi.org/10.1061/(ASCE)0733-9364(1994)120:4(687).
- Näykki, P. 1976. On optimal bidding strategies, Management Science 23(2): 198–203. http://dx.doi.org/10.1287/mnsc.23.2.198.
- Ngai, S. C.; Derek, S.; Drew, H. P.; Skitmore, R. M. 2002. A theoretical framework for determining the minimum number of bidders in construction bidding competitions, Construction Management and Economics 20(6): 473–482. http://dx.doi.org/10.1080/01446190210151041.
- OECD (Organisation for Economic Co-operation and Development) 2007. Bribery in procurement, methods, actors and counter-measures, Paris.
- OECD (Organisation for Economic Co-operation and Development) 2009. Guidelines for fighting bid rigging in public procurement, Paris.
- Oo, B. L.; Drew, D. S.; Runeson, G. 2010. Competitor analysis in construction bidding, Construction Management and Economics 28(12): 1321–1329. http://dx.doi.org/10.1080/01446193.2010.520721.
- Oo, B. L.; Drew, D. S.; Lo, H. P. 2008a. A comparison of contractors’ decision to bid behaviour according to different market environments, International Journal of Project Management 26(4): 439–447. http://dx.doi.org/10.1016/j.ijproman.2007.06.001.
- Oo, B. L.; Drew, D. S.; Lo, H. P. 2008b. Heterogeneous approach to modeling contractors’ decision-to-bid strategies, Journal of Construction Engineering and Management 134(10): 766–776. http://dx.doi.org/10.1061/(ASCE)0733-9364(2008)134:10(766).
- Pim, J. C. 1974. Competitive tendering and bidding strategy, National Builder 55(11): 541–545.
- Ravanshadnia, M.; Rajaie, H.; Abbasian, H. R. 2010. Hybrid fuzzy MADM project-selection model for diversified construction companies, Canadian Journal of Civil Engineering 37(8): 1082–1093. http://dx.doi.org/10.1139/L10-048.
- Rothkopf, M. H.; Harstad, R. M. 1994. Modeling competitive bidding: a critical essay, Management Science 40(3): 364–384. http://dx.doi.org/10.1287/mnsc.40.3.364.
- Rothkopf, M. H. 1969. A model of rational competitive bidding, Management Science 15(7): 362–373. http://dx.doi.org/10.1287/mnsc.15.7.362.
- Runeson, K. G.; Skitmore, R. M. 1999. Tendering theory revisited, Construction Management and Economics 17(3): 285–296. http://dx.doi.org/10.1080/014461999371493.
- Skitmore, R. M.; Runeson, G. 2006. Bidding models: testing the stationary assumption, Construction Management and Economics 24(8): 791–803. http://dx.doi.org/10.1080/01446190600680432.
- Skitmore, R. M. 1991. The contract bidder homogeneity assumption: an empirical analysis, Construction Management and Economics 9(5): 403–429. http://dx.doi.org/10.1080/01446199100000032.
- Skitmore, R. M. 2002. The probability of tendering the lowest bid in sealed auctions: an empirical analysis of construction data, Journal of the Operational Research Society 53(1): 47–56. http://dx.doi.org/10.1057/palgrave/jors/2601236.
- Skitmore, R. M. 2004. Predicting the probability of winning sealed bid auctions: the effects of outliers on bidding models, Construction Management and Economics 22(1): 101–109. http://dx.doi.org/10.1080/0144619042000186103.
- Skitmore, R. M. 2008. First and second price independent values sealed bid procurement auctions: some scalar equilibrium results, Construction Management and Economics 26(8): 787–803. http://dx.doi.org/10.1080/01446190802175678.
- Skitmore, R. M.; Drew, D. S.; Ngai, S. 2001. Bid-spread, Journal of Construction Engineering and Management 127(2): 149–153. http://dx.doi.org/10.1061/(ASCE)0733-9364(2001)127:2(149).
- Skitmore, R. M.; Pettitt, A. N.; McVinish, R. 2007. Gates’ bidding model, Journal of Construction Engineering and Management 133(11): 855–863. http://dx.doi.org/10.1061/(ASCE)0733-9364(2007)133:11(855).
- Stark, R. M.; Rothkopf, M. H. 1979. Competitive bidding: a comprehensive bibliography, Operations Research 27(2): 364–390.
- Vergara, A. J. 1977. Probabilistic estimating and applications of portfolio theory in construction: PhD Thesis. Department of Civil Engineering, University of Illinois at Urbana-Champaign, Urbana, IL.
- Watt, D. J.; Kayis, B.; Willey, K. 2009. Identifying key factors in the evaluation of tenders for projects and services, International Journal of Project Management 27(3): 250–260. http://dx.doi.org/10.1016/j.ijproman.2008.03.002.
- Ye, K.; Jiang, W.; Shen, L. 2008. Project competition intensity (PCI) in the construction market: a case study in China, Construction Management and Economics 26(5): 463–470. http://dx.doi.org/10.1080/01446190802036136.