References
- Abastante, F.; Lami, I. M. 2012. Quality function deployment (QFD) and analytic network process (ANP): an application to analyze a cohousing intervention, Journal of Applied Operational Research 4(1): 14–27.
- Afshari, A. R.; Yusuff, R.; Derayatifar, A. R. 2012. Project manager selection by using Fuzzy Simple Additive Weighting method, in 2012 International Conference on Innovation Management and Technology Research (ICIMTR), 21–22 May 2012, Malacca, 412–416.
- Akao, Y. 1972. New product development and quality assurance – quality deployment system, Standardization and Quality Control 25(4): 7–14.
- Arditi, D.; Nawakorawit, M. 1999. Issues in building maintenance: property managers’ perspective, Journal of Architectural Engineering 5(4): 117–132. http://dx.doi.org/10.1061/(ASCE)1076-0431(1999)5:4(117)
- Asan, U.; Soyer, A.; Serdarasan, S. 2012. A fuzzy analytic network process approach, in C. Kahraman (Ed.). Computational intelligence systems in industrial engineering. Atlantis Press, 155–179.
- Azevedo, S.; Carvalho, H.; Cruz-Machado, V. 2013. Using interpretive structural modelling to identify and rank performance measures: an application in the automotive supply chain, Baltic Journal of Management 8(2): 208–230. http://dx.doi.org/10.1108/17465261311310027
- Bevilacqua, M.; Ciarapica, F.; Giacchetta, G. 2006. A fuzzyQFD approach to supplier selection, Journal of Purchasing and Supply Management 12(1): 14–27. http://dx.doi.org/10.1016/j.pursup.2006.02.001
- Bhattacharya, A.; Sarkar, B.; Mukherjee, S. K. 2005. Integrating AHP with QFD for robot selection under requirement perspective, International Journal of Production Research 43(17): 3671–3685. http://dx.doi.org/10.1080/00207540500137217
- Büyüközkan, G.; Ruan, D. 2008. Evaluation of software development projects using a fuzzy multi-criteria decision approach, Mathematics and Computers in Simulation 77(5): 464–475. http://dx.doi.org/10.1016/j.matcom.2007.11.015
- Cassin, R. 2003. Leadership and communications in civil engineering: past, present and future, Leadership and Management in Engineering 3(3): 145–147. http://dx.doi.org/10.1061/(ASCE)1532-6748(2003)3:3(145)
- Ceran, T.; Dorman, A. 1995. The complete project manager, Journal of Architectural Engineering 1(2): 67–72. http://dx.doi.org/10.1061/(ASCE)1076-0431(1995)1:2(67)
- Chandramowli, S.; Transue, M.; Felder, F. A. 2011. Analysis of barriers to development in landfill communities using interpretive structural modeling, Habitat International 35(2): 246–253. http://dx.doi.org/10.1016/j.habitatint.2010.09.005
- Chang, C.; Wu, C.; Lin, C.; Chen, H. 2007. An application of AHP and sensitivity analysis for selecting the best slicing machine, Computers & Industrial Engineering 52(2): 296–307. http://dx.doi.org/10.1016/j.cie.2006.11.006
- Chanter, B.; Swallow, P. 2007. Building maintenance management. 2nd ed. Oxford: Blackwell. 332 p. http://dx.doi.org/10.1002/9780470692011
- Chen, Z. 2010. A cybernetic model for analytic network process, in 2010 International Conference on Machine Learning and Cybernetics (ICMLC), 11–14 July 2010, Qingdao, Vol. 4, 1914–1919. http://dx.doi.org/10.1109/ICMLC.2010.5580528
- Czuchry, A. J.; Yasin, M. M. 2003. Managing the project management process, Industrial Management and Data Systems 103(1): 39–46. http://dx.doi.org/10.1108/02635570310456887
- Davidson, M.; Leather, P. 2000. Choice or necessity? A review of the role of DIY in tackling housing repair and maintenance, Construction Management & Economics 18(7): 747–756. http://dx.doi.org/10.1080/014461900433032
- Dikmen, I.; Talat Birgonul, M.; Kiziltas, S. 2005. Strategic use of quality function deployment (QFD) in the construction industry, Building and Environment 40(2): 245–255. http://dx.doi.org/10.1016/j.buildenv.2004.07.001
- Egbu, C. O. 1999. Skills, knowledge and competencies for managing construction refurbishment works, Construction Management & Economics 17(1): 29–43. http://dx.doi.org/10.1080/014461999371808
- Ertay, T.; Büyüközkan, G.; Kahraman, C.; Ruan, D. 2005. Quality function deployment implementation based on analytic network process with linguistic data: an application in automotive industry, Journal of Intelligent and Fuzzy Systems 16(3): 221–232.
- Faisal, M. N.; Banwet, D.; Shankar, R. 2006. Supply chain risk mitigation: modeling the enablers, Business Process Management Journal 12(4): 535–552. http://dx.doi.org/10.1108/14637150610678113
- Fuertes, A.; Casals, M.; Gangolells, M.; Forcada, N.; Macarulla, M.; Roca, X. 2013. An Environmental Impact Causal Model for improving the environmental performance of construction processes, Journal of Cleaner Production 52(1): 425–437. http://dx.doi.org/10.1016/j.jclepro.2013.02.005
- Gargione, L. A. 1999. Using quality function deployment (QFD) in the design phase of an apartment construction project, in Proc. of the 7thAnnual Conference of the International Group of Lean Construction, 26–28 July 1999, Berkley, CA, USA, 357–368.
- Gibb, A. G.; Haslam, R.; Gyi, D. E.; Hide, S.; Duff, R. 2006. What causes accidents?, in Proceedings of the ICE – Civil Engineering 159(6): 46–50.
- Goodwin, R. S. 1993. Skills required of effective project managers, Journal of Management in Engineering 9(3): 217–226. http://dx.doi.org/10.1061/(ASCE)9742-597X(1993)9:3(217)
- Gorane, S.; Kant, R. 2013. Modelling the SCM enablers: an integrated ISM-fuzzy MICMAC approach, Asia Pacific Journal of Marketing and Logistics 25(2): 263–286. http://dx.doi.org/10.1108/13555851311314059
- Hadad, Y.; Keren, B.; Laslo, Z. 2013. A decision-making support system module for project manager selection according to past performance, International Journal of Project Management 31(4): 532–541. http://dx.doi.org/10.1016/j.ijproman.2012.10.004
- Hamilton, D. 1991. Records management in engineering firms, Journal of Management in Engineering 7(4): 346–356. http://dx.doi.org/10.1061/(ASCE)9742-597X(1991)7:4(346)
- Hegazy, T.; Elbeltagi, E; Zhang, K. 2005. Keeping better site records using intelligent bar charts, Journal of Construction Engineering and Management 131(5): 513–521. http://dx.doi.org/10.1061/(ASCE)0733-9364(2005)131:5(513)
- Horner, R.; El-Haram, M.; Munns, A. 1997. Building maintenance strategy: a new management approach, Journal of Quality in Maintenance Engineering 3(4): 273–280. http://dx.doi.org/10.1108/13552519710176881
- Hsu, C.-W.; Hu, A. H. 2009. Applying hazardous substance management to supplier selection using analytic network process, Journal of Cleaner Production 17(2): 255–264. http://dx.doi.org/10.1016/j.jclepro.2008.05.004
- Hwang, B.-G.; Ng, W. J. 2013. Project management knowledge and skills for green construction: overcoming challenges, International Journal of Project Management 31(2): 272–284. http://dx.doi.org/10.1016/j.ijproman.2012.05.004
- Jazebi, F.; Rashidi, A. 2013. An automated procedure for selecting project managers in construction firms, Journal of Civil Engineering and Management 19(1): 97–106. http://dx.doi.org/10.3846/13923730.2012.738707
- Juan, Y. K.; Perng, Y. H.; Castro-Lacouture, D.; Lu, K. S. 2009. Housing refurbishment contractors selection based on a hybrid fuzzy-QFD approach, Automation in Construction 18(2): 139–144. http://dx.doi.org/10.1016/j.autcon.2008.06.001
- Kahraman, C.; Ertay, T.; Büyüközkan, G. 2006. A fuzzy optimization model for QFD planning process using analytic network approach, European Journal of Operational Research 171(2): 390–411. http://dx.doi.org/10.1016/j.ejor.2004.09.016
- Kang, H.; Hung, M.; Pearn, W.; Lee, A. H.; Kang, M. 2011. An integrated multi-criteria decision making model for evaluating wind farm performance, Energies 4(11): 2002–2026. http://dx.doi.org/10.3390/en4112002
- Karsak, E. E.; Sozer, S.; Alptekin, S. E. 2003. Product planning in quality function deployment using a combined analytic network process and goal programming approach, Computers and Industrial Engineering 44(1): 171–190. http://dx.doi.org/10.1016/S0360-8352(02)00191-2
- Keil, M.; Lee, H. K.; Deng, T. 2013. Understanding the most critical skills for managing IT projects: a Delphi study of IT project managers, Information and Management 50(7): 398–414. http://dx.doi.org/10.1016/j.im.2013.05.005
- Kerzner, H. 2001. Project management workbook to accompany Project management, a systems approach to planning, scheduling and controlling. 7th ed. New York: Wiley. 448 p.
- Kumar, S.; Luthra, S.; Haleem, A. 2013. Customer involvement in greening the supply chain: an interpretive structural modeling methodology, Journal of Industrial Engineering International 9(1): 1–13. http://dx.doi.org/10.1186/2251-712X-9-6
- Lam, K.; Zhao, X. 1998. An application of quality function deployment to improve the quality of teaching, International Journal of Quality & Reliability Management 15(4): 389–413.
- Lau, H. S. 2006. The selection of construction project manager by using analytical hierarchy process (AHP): Master thesis. Universiti Teknologi Malaysia, Malaysia.
- Lee, A. H. I.; Kang, H.-Y.; Yang, C.-Y.; Lin, C.-Y. 2010. An evaluation framework for product planning using FANP, QFD and multi-choice goal programming, International Journal of Production Research 48(13): 3977–3997. http://dx.doi.org/10.1080/00207540902950845
- Lee, A. H. I.; Lin, C.-Y. 2011. An integrated fuzzy QFD framework for new product development, Flexible Services and Manufacturing Journal 23(1): 26–47. http://dx.doi.org/10.1007/s10696-011-9076-5
- Lee, A. H. I.; Kang, H.-Y.; Chang, C.-C. 2011. An integrated interpretive structural modeling – fuzzy analytic network process – benefits, opportunities, costs and risks model for selecting technologies, International Journal of Information Technology & Decision Making 10(5): 843–871. http://dx.doi.org/10.1142/S0219622011004592
- Lee, Y.; Wu, W.; Tzeng, G.-H. 2008. An effective decisionmaking method using a combined QFD and ANP approach, WSEAS Transactions on Business and Economics 5(12): 541–555.
- Levin, P. 1998. Construction contract claims, changes & dispute resolution. Reston, VA: ASCE Press. 255 p. http://dx.doi.org/10.1061/9780784402764
- Lin, Y.; Cheng, H.-P.; Tseng, M.-L.; Tsai, J. C. C. 2010. Using QFD and ANP to analyze the environmental production requirements in linguistic preferences, Expert Systems with Applications 37(3): 2186–2196. http://dx.doi.org/10.1016/j.eswa.2009.07.065
- Ling, F.; Loo, C. 2013. Characteristics of jobs and jobholders that affect job satisfaction and work performance of project managers, Journal of Management in Engineering. http://dx.doi.org/10.1061/(ASCE)ME.1943-5479.0000247
- Liu, H. T.; Wang, C.-H. 2010. An advanced quality function deployment model using fuzzy analytic network process, Applied Mathematical Modelling 34(11): 3333–3351. http://dx.doi.org/10.1016/j.apm.2010.02.024
- Liu, H. T.; Tsai, Y. L. 2012. A fuzzy risk assessment approach for occupational hazards in the construction industry, Safety Science 50(4): 1067–1078. http://dx.doi.org/10.1016/j.ssci.2011.11.021
- Meredith, J. R.; Mantel, S. J. Jr. 2011. Project management: a managerial approach. Hoboken, NJ: Wiley. 600 p.
- Michael, A. O.; Razak, A. R. 2013. The study of claims arising from building collapses: case studies from Malaysia, Nigeria, Singapore and Thailand, Civil and Environmental Research 3(11): 113–129.
- Mohammadi, F.; Nateghi, F.; Pourhejazi, S. P.; Abdullah, A.; Gandomi, N.; Sadi, M. K. 2014. Part deployment model using combined quality function deployment and cybernetic fuzzy analytic network process, Indian Journal of Science & Technology 7(1): 0–0 in Press..
- MS2318:2012Malaysian Code of Practice for Building Demolition. Malaysia: Ministry of Public Works, 2012. 38 p.
- Müller, R.; Turner, R. 2007. The influence of project managers on project success criteria and project success by type of project, European Management Journal 25(4): 298–309. http://dx.doi.org/10.1016/j.emj.2007.06.003
- Ochieng, E. G.; Price, A. D. F.; Ruan, X.; Egbu, C. O.; Moore, D. 2013. The effect of cross-cultural uncertainty and complexity within multicultural construction teams, Engineering, Construction and Architectural Management 20(3): 307–324. http://dx.doi.org/10.1108/09699981311324023
- Ofori, G.; Dulaimi, M. F.; Ling, F. Y. 2004. Improving performance of construction industry in Singapore: motivators, enablers and lessons for developing countries, Journal of Construction Research 5(02): 267–289. http://dx.doi.org/10.1142/S1609945104000188
- Ogunlana, S.; Siddiqui, Z.; Yisa, S.; Olomolaiye, P. 2002. Factors and procedures used in matching project managers to construction projects in Bangkok, International Journal of Project Management 20(5): 385–400. http://dx.doi.org/10.1016/S0263-7863(01)00017-5
- Opricovic, S.; Tzeng, G. 2004. Compromise solution by MCDM methods: a comparative analysis of VIKOR and TOPSIS, European Journal of Operational Research 156(2): 445–455. http://dx.doi.org/10.1016/S0377-2217(03)00020-1
- Pal, D.; Ravi, B.; Bhargava, L. 2007. Rapid tooling route selection for metal casting using QFD–ANP methodology, International Journal of Computer Integrated Manufacturing 20(4): 338–354. http://dx.doi.org/10.1080/09511920600883229
- Partovi, F. Y.; Corredoira, R. A. 2002. Quality function deployment for the good of soccer, European Journal of Operational Research 137(3): 642–656. http://dx.doi.org/10.1016/S0377-2217(01)00072-8
- Prieto, B. 2013. Establishing and building leadership skills, Leadership and Management in Engineering 13(3): 209–211. http://dx.doi.org/10.1061/(ASCE)LM.1943-5630.0000235
- Raharjo, H.; Brombacher, A.; Xie, M. 2008. Dealing with subjectivity in early product design phase: a systematic approach to exploit Quality Function Deployment potentials, Computers and Industrial Engineering 55(1): 253–278. http://dx.doi.org/10.1016/j.cie.2007.12.012
- Rashidi, A.; Jazebi, F.; Brilakis, I. 2011. Neurofuzzy genetic system for selection of construction project managers, Journal of Construction Engineering and Management 137(1): 17–29. http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0000200
- Roethlisberger, F. J.; Dickson, W. J. 2003. Management and the worker. London: Routledge. 615 p.
- Saaty, T. L. 1990. How to make a decision: the analytic hierarchy process, European Journal of Operational Research 48(1): 9–26. http://dx.doi.org/10.1016/0377-2217(90)90057-I
- Saaty, T. L. 2003. Decision-making with the AHP: why is the principal eigenvector necessary?, European Journal of Operational Research 145(1): 85–91. http://dx.doi.org/10.1016/S0377-2217(02)00227-8
- Saaty, T. L. 2004. Fundamentals of the analytic network process – Dependence and feedback in decision-making with a single network, Journal of Systems Science and Systems Engineering 13(2): 129–157. http://dx.doi.org/10.1007/s11518-006-0158-y
- Saaty, T. L. 2008. The analytic network process, Iranian Journal of Operations Research 1(1): 1–27.
- Saaty, T. L. 2009. Theory and applications of the Analytic Network Process: Decision making with benefits, opportunities, costs and risks. Pittsburgh: RWS Publications. 352 p.
- Saaty, T. L.; Vargas, L. G. 2001. Models, methods, concepts & applications of the Analytic Hierarchy Process. International Series in Operations Research & Management Science, Vol. 34. Springer, US. 333 p. http://dx.doi.org/10.1007/978-1-4615-1665-1
- Sekaran, U.; Bougie, R. 2010. Research methods for business. New York: Wiley. 488 p.
- Senescu, R. R.; Haymaker, J. R.; Meza, S.; Fischer, M. A. 2014. Design process communication methodology: improving the effectiveness and efficiency of collaboration, sharing, and understanding, Journal of Architectural Engineering 20(1): 04014039. http://dx.doi.org/10.1061/(ASCE)AE.1943-5568.0000122
- Serpell, A.; Wagner, R. 1997. Application of quality function deployment (QFD) to the determination of the design characteristics of building apartments, in L. Alarcon (Ed.). Lean construction. Rotterdam: A. A. Balkema, 355–363. http://dx.doi.org/10.4324/9780203345825_Application_of_Quality_Function_Deployment_(QFD)
- Singh, M. D.; Kant, R. A. 2007. Knowledge management barriers: An interpretive structural modeling approach, in 2007 IEEE International Conference on Industrial Engineering and Engineering Management, 2–4 December 2007, Singapore, 2091–2095. http://dx.doi.org/10.1109/IEEM.2007.4419560
- Sun, M.; Meng, X. 2009. Taxonomy for change causes and effects in construction projects, International Journal of Project Management 27(6): 560–572. http://dx.doi.org/10.1016/j.ijproman.2008.10.005
- Taghizadeh, H. M. E. sis. 2013. Supplier's selection in supply chain with combined QFD and ANP approaches (case study), Research Journal of Recent Sciences 2(6): 66–76.
- Tavakkoli-Moghaddam, R.; Mousavi, S. M.; Heydar, M. 2011. An integrated AHP-VIKOR methodology for plant location selection, in IJE Transactions B: Applications 24(2): 127–137.
- Tian, Y.; Peng, Y. 2010. Impact of communication on supplier integration and organizational performance, in ICLEM 2010: 1923–1929.
- Warfield, J. N. 1974. Developing interconnection matrices in structural modeling, IEEE Transactions on Systems, Man and Cybernetics SMC 4(1): 81–87. http://dx.doi.org/10.1109/TSMC.1974.5408524
- Yang, Y. Q.; Wang, S. Q.; Dulaimi, M.; Low, S. P. 2003. A fuzzy quality function deployment system for buildable design decision-making, Automation in Construction 12(4): 381–393. http://dx.doi.org/10.1016/S0926-5805(03)00002-5
- Yasin, M. M.; Czuchry, A. J.; Alavi, J. 2002. Project management practices: Then and now, Thunderbird International Business Review 44(2): 253–262. http://dx.doi.org/10.1002/tie.10013