References
- Aguilar, G. E.; Hewage, K. N. 2011. Real-time information and communication system to improve construction safety (C-RTICS 2), in Annual Conference of Canadian Society for Civil Engineering (CSCE 2011), 14–17 June 2011, Ottawa, ON, Canada, 2028–2039.
- Calis, G.; Deora, S.; Li, N.; Becerik-Gerber, B.; Krishnamachari, B 2011. Assessment of WSN and RFID technologies for real-time occupancy information, in Proceedings of the 28th International Symposium on Automation and Robotics in Construction (ISARC 2011), 29 June – 02 July 2011, Seoul, South Korea, 182–188.
- Carbonari, A.; Giretti, A.; Naticchia, B. 2011. A proactive system for real-time safety management in construction sites, Automation in Construction 20(6): 686–698. http://dx.doi.org/10.1016/j.autcon.2011.04.019
- Chae, S. 2009. Development of warning system for preventing collision accident on construction site, in 2009 26thInternational Symposium on Automation and Robotics in Construction (ISARC 2009), 24–27 June 2009, Austin, TX, United States, 55–60.
- Chae, S.; Yoshida, T. 2010. Application of RFID technology to prevention of collision accident with heavy equipment, Automation in Construction 19(3): 368–374. http://dx.doi.org/10.1016/j.autcon.2009.12.008
- Chen, Y. C.; Chi, H. L.; Kangm, S. C.; Hsieh, S. H. 2011. A smart crane operations assistance system using augmented reality technology, in Proceedings of the 28thInternational Symposium on Automation and Robotics in Construction (ISARC 2011), 29 June – 02 July 2011, Seoul, South Korea, 643–649.
- Cheng, T.; Teizer, J. 2014. Modeling tower crane operator visibility to minimize the risk of limited situational awareness, Journal of Computing in Civil Engineering 28(3): 04014004. http://dx.doi.org/10.1061/(ASCE)CP.1943-5487.0000282
- Cheng, T.; Venugopal, M.; Teizer, J.; Vela, P. A. 2011. Performance evaluation of ultra wideband technology for construction resource location tracking in harsh environments, Automation in Construction 20(8): 1173–1184. http://dx.doi.org/10.1016/j.autcon.2011.05.001
- Cheng, T.; Yang, J.; Teizer, J.; Vela, P. A. 2010. Automated construction resource location tracking to support the analysis of lean principles, in Challenging Lean Construction Thinking: What Do We Think and What Do We Know? – 18thAnnual Conference of the International Group for Lean Construction (IGLC 18), 14–16 July 2010, Haifa, Israel, 643–653.
- Cho, Y. K.; Youn, J. H. 2006. Wireless sensor-driven intelligent navigation robots for indoor construction site security and safety, in 2006 Proceedings of the 23rdInternational Symposium on Robotics and Automation in Construction (ISARC 2006), 3–5 October 2006, Tokyo, Japan, 493–498.
- Choe, S.; Leite, F.; Seedah, D.; Caldas, C. 2014. Evaluation of sensing technology for the prevention of backover accidents in construction work zones, Journal of Information Technology in Construction 19: 1–19.
- Chu, B.; Jung, K.; Lim, M. T.; Hong, D. 2013. Robot-based construction automation: An application to steel beam assembly (Part I), Automation in Construction 32: 46–61. http://dx.doi.org/10.1016/j.autcon.2012.12.016
- Dėjus, T.; Antuchevičienė, J. 2013. Assessment of health and safety solutions at a construction site, Journal of Civil Engineering and Management 19(5): 728–737. http://dx.doi.org/10.3846/13923730.2013.812578
- Ding, L.; Li, W.; Zhou, G.; Wu, X. 2010. Environment settlements on embankment in wuhan yangtze river tunnel construction, in 2010 International Conference of Environment Materials and Environment Management (EMEM 2010), 2010, Harbin, China, 985–988. http://dx.doi.org/10.4028/www.scientific.net/AMR.113-116.985
- Ding, L.; Ma, L.; Luo, H.; Yu, M.; Wu, X. 2011a. Wavelet Analysis for tunneling-induced ground settlement based on a stochastic model, Tunnelling and Underground Space Technology 26(5): 619–628. http://dx.doi.org/10.1016/j.tust.2011.03.005
- Ding, L.; Wang, F.; Luo, H.; Yu, M.; Wu, X. 2013a. Feedforward analysis for shield-ground system, Journal of Computing in Civil Engineering 27(3): 231–242. http://dx.doi.org/10.1061/(asce)cp.1943-5487.0000219
- Ding, L.; Wu, X.; Luo, H.; Fu, F. 2011b. Research on standard for construction safety assessment of metro engineering, Tumu Gongcheng Xuebao/China Civil Engineering Journal 44(11): 121–127.
- Ding, L.; Yu, H. L.; Li, H.; Zhou, C.; Wu, X.; Yu, M. H. 2012. Safety risk identification system for metro construction on the basis of construction drawings, Automation in Construction 27: 120–137. http://dx.doi.org/10.1016/j.autcon.2012.05.010
- Ding, L.; Zhang, L.; Wu, X.; Skibniewski, M. J.; Qunzhou, Y. 2014. Safety management in tunnel construction: Case study of Wuhan metro construction in China, Safety Science 62: 8–15. http://dx.doi.org/10.1016/j.ssci.2013.07.021
- Ding, L.; Zhou, C. 2013. Development of web-based system for safety risk early warning in urban metro construction, Automation in Construction 34: 45–55. http://dx.doi.org/10.1016/j.autcon.2012.11.001
- Ding, L.; Zhou, C.; Deng, Q. X.; Luo, H.; Ye, X. W.; Ni, Y. Q.; Guo, P. 2013b. Real-time safety early warning system for cross passage construction in Yangtze Riverbed Metro Tunnel based on the internet of things, Automation in Construction 36: 25–37. http://dx.doi.org/10.1016/j.autcon.2013.08.017
- Ding, L.; Zhou, C.; Ye, X.; Luo, H.; Ni, Y.; Guo, P. 2013c. Study on real-time sensing and early-warning of construction safety risk for metro crossing passage under Yangtze River, Tumu Gongcheng Xuebao/China Civil Engineering Journal 46(7): 141–150.
- Dobrzanski, J.; Pasternak, J. 2009. Reliability and safety of the power equipment in respect of properties evaluation of welded joints made from new generation creep-resisting steels, in Pressure Vessels and Piping Conference (ASME), 26–30 July 2009, Prague, Czech Republic, 1717–1730. http://dx.doi.org/10.1115/PVP2009-77044
- Du, J. C.; Teng, H. C. 2007. 3D laser scanning and GPS technology for landslide earthwork volume estimation, Automation in Construction 16(5): 657–663. http://dx.doi.org/10.1016/j.autcon.2006.11.002
- Esmaeili, B.; Hallowell, M. R. 2012. Diffusion of safety innovations in the construction industry, Journal of Construction Engineering and Management 138(8): 955–963. http://dx.doi.org/10.1061/(asce)co.1943-7862.0000499
- Fung, I. W. H.; Lee, Y. Y.; Tam, V. W. Y.; Fung, H. W. 2014. A feasibility study of introducing chin straps of safety helmets as a statutory requirement in Hong Kong construction industry, Safety Science 65: 70–78. http://dx.doi.org/10.1016/j.ssci.2013.12.014
- Gao, W. X.; Hou, B. H.; Sun, X. M.; Deng, H. L.; Zhou, S. S.; Chen, N. N. 2012. Research on comprehensive information intelligent monitoring system for tunnel excavation, Yantu Lixue/Rock and Soil Mechanics 33(SUPPL. 2): 408–412.
- Giretti, A.; Carbonari, A.; Naticchia, B.; Degrassi, M. 2009. Design and first development of an automated real-time safety management system for construction sites, Journal of Civil Engineering and Management 15(4): 325–336. http://dx.doi.org/10.3846/1392-3730.2009.15.325-336
- Golparvar-Fard, M.; Pena-Mora, F.; Savarese, S. 2011. Integrated sequential as-built and as-planned representation with D(4)AR tools in support of decision-making tasks in the AEC/FM industry, Journal of Construction Engineering and Management 137(12): 1099–1116. http://dx.doi.org/10.1061/(asce)co.1943-7862.0000371
- Guo, J.; Ding, L.; Luo, H.; Zhou, C.; Ma, L. 2014. Wavelet prediction method for ground deformation induced by tunneling, Tunnelling and Underground Space Technology 41: 137–151. http://dx.doi.org/10.1016/j.tust.2013.12.009
- Guo, J.; Zhang, H.; Liu, Y.; Liu, H.; Wang, P. 2011. Study on the data transmission technology of line condition monitoring system of smart transmission grid, Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering 31(SUPPL. 1): 45–49.
- Hamidi, N.; Omidvari, M.; Meftahi, M. 2012. The effect of integrated management system on safety and productivity indices: case study; Iranian cement industries, Safety Science 50(5): 1180–1189. http://dx.doi.org/10.1016/j.ssci.2012.01.004
- Hammad, A.; Vahdatikhaki, F.; Zhang, C. 2013. A novel integrated approach to project-level Automated Machine Control/Guidance systems in construction projects, Journal of Information Technology in Construction 18: 162–181. http://www.itcon.org/2013/9
- Han, C. S.; Lee, S. Y.; Lee, K. Y.; Park, B. S. 2006. A multidegree-of-freedom manipulator for curtain-wall installation, Journal of Field Robotics 23(5): 347–360. http://dx.doi.org/10.1002/rob.20122
- Han, S.; Saba, F.; Lee, S.; Mohamed, Y.; Pena-Mora, F. 2014. Toward an understanding of the impact of production pressure on safety performance in construction operations, Accident Analysis and Prevention 68: 106–116. http://dx.doi.org/10.1016/j.aap.2013.10.007
- Hinze, J.; Hallowell, M.; Baud, K. 2013. Construction-safety best practices and relationships to safety performance, Journal of Construction Engineering and Management 139(10): 8. http://dx.doi.org/10.1061/(asce)co.1943-7862.0000751
- Hu, Z.; Zhang, J.; Zhang, X. 2010a. Construction collision detection for site entities based on 4-D space-time model, Qinghua Daxue Xuebao/Journal of Tsinghua University 50(6): 820–825.
- Hu, Z. Z.; Zhang, J. P.; Zhang, X. L. 2010b. 4D construction safety information model-based safety analysis approach for scaffold system during construction, Gongcheng Lixue/Engineering Mechanics 27(12): 192–200.
- Huang, Y. 2012. Research on information management of tunnel safe construction, Applied Mechanics and Materials 209–211: 1500–1504. http://dx.doi.org/10.4028/www.scientific.net/AMM.209-211.1500
- Hwang, S. 2012. Ultra-wide band technology experiments for real-time prevention of tower crane collisions, Automation in Construction 22: 545–553. http://dx.doi.org/10.1016/j.autcon.2011.11.015
- John, G.; Ganah, A. 2011. Integrating BIM and planning software for health and safety site induction, in Proceedings of RICS Construction and Property Conference (COBRA 2011), 2011, Salford, United Kingdom, 914–923.
- Jung, K.; Chu, B.; Park, S.; Hong, D. 2013. An implementation of a teleoperation system for robotic beam assembly in construction, International Journal of Precision Engineering and Manufacturing 14(3): 351–358. http://dx.doi.org/10.1007/s12541-013-0049-3
- Kamardeen, I. 2013. OHS electronic management systems for construction. Hoboken: Taylor and Francis. 150 p.
- Karlinski, J.; Ptak, M.; Dzialak, P. 2013. Simulation tests of roll-over protection structure, Archives of Civil and Mechanical Engineering 13(1): 57–63. http://dx.doi.org/10.1016/j.acme.2012.12.001
- Kasirossafar, M.; Shahbodaghlou, F. 2013a. Application of visualization technologies to design for safety concept, in Gateway to a Better Tomorrow – Proceedings of the 6thCongress on Forensic Engineering, 2013, San Francisco, CA, United States, 370–377. http://dx.doi.org/10.1061/9780784412640.040
- Kasirossafar, M.; Shahbodaghlou, F. 2013b. Building information modeling for construction safety planning, in Developing the Frontier of Sustainable Design, Engineering, and Construction – Proceedings of the 2012 International Conference on Sustainable Design and Construction (ICSDEC 2012), 2012, Fort Worth, TX, United States, 1017–1024. http://dx.doi.org/10.1061/9780784412688.120
- Kelm, A.; Laussat, L.; Meins-Becker, A.; Platz, D.; Khazaee, M. J.; Costin, A. M.; Helmus, M.; Teizer, J. 2013. Mobile passive Radio Frequency Identification (RFID) portal for automated and rapid control of Personal Protective Equipment (PPE) on construction sites, Automation in Construction 36: 38–52. http://dx.doi.org/10.1016/j.autcon.2013.08.009
- Kim, H. J.; Park, C. S. 2013. Smartphone based real-time location tracking system for automatic risk alert in building project, Applied Mechanics and Materials 256–259: 2794–2797. http://dx.doi.org/10.4028/www.scientific.net/AMM.256-259.2794
- Kim, K. T.; Elernold, L. E. 2008. A comparison of two innovative technologies for safe pipe installation – “Pipeman” and the Stewart-Gough platform-based pipe manipulator, Automation in Construction 17(3): 322–332. http://dx.doi.org/10.1016/j.autcon.2007.04.004
- Kim, S.; Shin, D. H.; Woo, S.; Lee, S. 2014. Identification of IT application areas and potential solutions for perception enhancement to improve construction safety, KSCE Journal of Civil Engineering 18(2): 365–379. http://dx.doi.org/10.1007/s12205-014-0173-3
- Kim, Y. S.; Lee, J. H.; Yoo, H. S.; Lee, J. B.; Jung, U. S. 2009. A performance evaluation of a Stewart platform based Hume concrete pipe manipulator, Automation in Construction 18(5): 665–676. http://dx.doi.org/10.1016/j.autcon.2009.02.003
- Kiviniemi, M.; Sulankivi, K.; Kähkönen, K.; Mäkelä, T.; Merivirta, M. L. 2011. BIM-based safety management and communication for building construction, VTT Tiedotteita – Valtion Teknillinen Tutkimuskeskus 2597: 1–123.
- Kivrak, S.; Arslan, G.; Akgun, A.; Arslan, V. 2013. Augmented reality system applications in construction project activities, in 30thInternational Symposium on Automation and Robotics in Construction and Mining, Held in Conjunction with the 23rdWorld Mining Congress (ISARC 2013), 11–15 August 2013, Montreal, QC, Canada, 1560–1571.
- Lee, G.; Cho, J.; Ham, S.; Lee, T.; Yun, S. H.; Yang, H. J. 2012a. A BIMand sensor-based tower crane navigation system for blind lifts, Automation in Construction 26: 1–10. http://dx.doi.org/10.1016/j.autcon.2012.05.002
- Lee, G.; Kim, H. H.; Lee, C. J.; Ham, S. I.; Yun, S. H.; Cho, H.; Kim, B. K.; Kim, G. T.; Kim, K. 2009. A lasertechnology-based lifting-path tracking system for a robotic tower crane, Automation in Construction 18(7): 865–874. http://dx.doi.org/10.1016/j.autcon.2009.03.011
- Lee, H. S.; Lee, K. P.; Park, M.; Baek, Y.; Lee, S. 2012b. RFID-based real-time locating system for construction safety management, Journal of Computing in Civil Engineering 26(3): 366–377. http://dx.doi.org/10.1061/(asce)cp.1943-5487.0000144
- Lee, K.-P.; Lee, H.-S.; Park, M.; Kim, H.; Han, S. 2014. A realtime location-based construction labor safety management system, Journal of Civil Engineering and Management 20(5): 724–736. http://dx.doi.org/10.3846/13923730.2013.802728
- Li, C.; Zhang, X.; Liu, X. 2012a. Mine safety information technology in the framework of Digital Mine, Safety Science 50(4): 846–850. http://dx.doi.org/10.1016/j.ssci.2011.08.022
- Li, G.; Ding, L.; Wu, X.; Luo, H.; Li, X. 2007. Ground settlement prediction during construction of Wuhan Yangtze River Tunnel, Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering 26(SUPPL. 2): 3631–3638.
- Li, J.; Hua, Z. 2012. An object library approach for managing construction safety component based on BIM, in 2012 Proceedings of the 29thInternational Symposium of Automation and Robotics in Construction (ISARC 2012), 2012, Eindhoven, Netherlands, . 6 p.
- Li, N.; Li, S.; Becerik-Gerber, B.; Calis, G. 2012b. Deployment strategies and performance evaluation of a virtual-tagenabled indoor location sensing approach, Journal of Computing in Civil Engineering 26(5): 574–583. http://dx.doi.org/10.1061/(ASCE)CP.1943-5487.0000161
- Li, X. P.; Gu, L. C.; Jia, J. 2012c. Anti-collision method of tower crane via ultrasonic multi-sensor fusion, in International Conference on Automatic Control and Artificial Intelligence (ACAI 2012), 24–26 March 2012, Xiamen, China, . 522–525. http://dx.doi.org/10.1049/cp.2012.1031
- Li, Y. F.; Wang, H. C.; Zhao, X. F.; Zhang, J. 2013. Research on BIM technology application in the construction of a subway station, Applied Mechanics and Materials 405–408: 3396–3400. http://dx.doi.org/10.4028/www.scientific.net/AMM.405-408.3396
- Liaudanskiene, R.; Simanaviciene, R.; Ustinovichius, L. 2012. A model for solving structural, technological and safety problems, Journal of Civil Engineering and Management 18(1): 30–42. http://dx.doi.org/10.3846/13923730.2011.643551
- Luo, X.; O'Brien, W. J.; Leite, F. 2013. Evaluating the impact of location-aware sensor data imperfections on autonomous jobsite safety monitoring, in Computing in Civil Engineering – Proceedings of the 2013 ASCE International Workshop on Computing in Civil Engineering (ASCE 2013), 23–25 June 2013, Los Angeles, CA, United States, 573–580. http://dx.doi.org/10.1061/9780784413029.072
- Lv, Y.; Zhu, Y. 2009. Research of the application of GIS and Sensor network in the building settlement observation, in Proceedings of the International Society for Optical Engineering (SPIE 2009), 16 October 2009, Wuhan, China. http://dx.doi.org/10.1117/12.838290
- Ma, L.; Ding, L.; Luo, H. 2014. Non-linear description of ground settlement over twin tunnels in soil, Tunnelling and Underground Space Technology 42: 144–151. http://dx.doi.org/10.1016/j.tust.2014.02.006
- Maalek, R.; Sadeghpour, F. 2011. A comparative overview of radio frequency-based technologies applicable to locating resources on construction sites, in Annual Conference of Canadian Society for Civil Engineering (CSCE 2011), 14–17 June 2011, Ottawa, ON, Canada, 2825–2835.
- Maalek, R.; Sadeghpour, F. 2013. Accuracy assessment of Ultra-Wide Band technology in tracking static resources in indoor construction scenarios, Automation in Construction 30: 170–183. http://dx.doi.org/10.1016/j.autcon.2012.10.005
- Marks, E.; Teizer, J. 2013. Evaluation of the position and orientation of (Semi-) passive RFID tags for the potential application in ground worker proximity detection and alert devices in safer construction equipment operation, in 2013 ASCE International Workshop on Computing in Civil Engineering (IWCCE 2013), 23–25 June 2013, Los Angeles, CA, United States, 645–652. http://dx.doi.org/10.1061/9780784413029.081
- Marks, E. D.; Cheng, T.; Teizer, J. 2013. Laser scanning for safe equipment design that increases operator visibility by measuring blind spots, Journal of Construction Engineering and Management 139(8): 1006–1014. http://dx.doi.org/10.1061/(asce)co.1943-7862.0000690
- Marzouk, M.; Ali, H. 2013. Modeling safety considerations and space limitations in piling operations using agent based simulation, Expert Systems with Applications 40(12): 4848–4857. http://dx.doi.org/10.1016/j.eswa.2013.02.021
- Melzner, J.; Teizer, J.; Zhang, S.; Bargstadt, H. J. 2013. Objectoriented safety planning of building construction by using Building Information Modeling, Bauingenieur 88: 471–479.
- Meng, L.; Li, T.; Fang, X. 2010a. Development and application of tunnel geological prediction online consultation platform, in Proceedings – 2010 International Conference on Optoelectronics and Image Processing (ICOIP 2010), 11– 12 November 2010, Haiko, China, 421–424. http://dx.doi.org/10.1109/ICOIP.2010.16
- Meng, Y.; Xu, W.; Liu, Z.; Liu, D.; Cai, D. 2010b. Analysis of 3D visualization of safety monitoring for complicated high rock slope engineering, Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering 29(12): 2500–2509.
- Moon, H.; Dawood, N.; Kang, L. 2014a. Development of workspace conflict visualization system using 4D object of work schedule, Advanced Engineering Informatics 28(1): 50–65. http://dx.doi.org/10.1016/j.aei.2013.12.001
- Moon, H.; Kim, H.; Kim, C.; Kang, L. 2014b. Development of a schedule-workspace interference management system simultaneously considering the overlap level of parallel schedules and workspaces, Automation in Construction 39: 93–105. http://dx.doi.org/10.1016/j.autcon.2013.06.001
- Nadar, M. A.; Awakian, C. A.; Khoury, H. K. 2013. An intelligent system for monitoring tower cranes on construction sites, in 30th International Symposium on Automation and Robotics in Construction and Mining, Held in Conjunction with the 23rdWorld Mining Congress (ISARC 2013), Montreal, QC, Canada, 1239–1246.
- Naticchia, B.; Vaccarini, M.; Carbonari, A. 2013. A monitoring system for real-time interference control on large construction sites, Automation in Construction 29: 148–160. http://dx.doi.org/10.1016/j.autcon.2012.09.016
- Nuntasunti, S.; Bernold, L. E. 2006. Experimental assessment of wireless construction technologies, Journal of Construction Engineering and Management 132(9): 1009–101. http://dx.doi.org/10.1061/(ASCE)0733-9364(2006)132:9(1009)
- Park, T.; Kim, M. K.; Kim, C.; Kim, H. 2009. Interactive 3D CAD for effective derrick crane operation in a cablestayed bridge construction, Journal of Construction Engineering and Management 135(11): 1261–1270. http://dx.doi.org/10.1061/(asce)co.1943-7862.0000101
- Patel, A.; Chasey, A.; Ariaratnam, S. T. 2010. Integrating global positioning system with laser technology to capture asbuilt information during open-cut construction, Journal of Pipeline Systems Engineering and Practice 1(4): 147–155. http://dx.doi.org/10.1061/(ASCE)PS.1949-1204.0000065
- Peinado, S. P.; Rico, A. J. V.; Cañón, J. V.; De Las Heras, J. J.; Mieres, J. M. 2009. RFID-based quality and safety building site improvement during execution phase, in Annual Conference of the IEEE Industrial Electronics Society (IECON 2009), 3–5 November 2009, Porto, Portugal, 2659–2664. http://dx.doi.org/10.1109/IECON.2009.5415253
- Qi, S.; Ding, L.; Luo, H. 2010. Study on integration and management system of schedule in large complex construction engineering projects based on lean construction, in 2010 International Forum on Information Technology and Applications (IFITA 2010), 16–18 July 2010, Kunming, China, 237–240. http://dx.doi.org/10.1109/ifita.2010.113
- Qin, Y. P. 2013. Application of virtual reality technology in construction control and management, Applied Mechanics and Materials 427–429: 2851–2854. http://dx.doi.org/10.4028/www.scientific.net/AMM.427-429.2851
- Razavi, S. N.; Montaser, A.; Moselhi, O. 2012. RFID deployment protocols for indoor construction, Construction Innovation 12(2): 239–258. http://dx.doi.org/10.1108/14714171211215967
- Ren, G. F.; Hu, Z. C.; Liu, Y. C.; Zhao, L. K.; Zhang, S. S. 2012. Design of safety monitoring collection and processing system on new tunnel excavation under exiting railway line, Wuhan Ligong Daxue Xuebao/Journal of Wuhan University of Technology 34(9): 80–83. http://dx.doi.org/10.3963/j.issn.1671-4431.2012.09.017
- Rubio-Romero, J. C.; Rubio, M. C.; Garcia-Hernandez, C. 2013. Analysis of construction equipment safety in temporary work at height, Journal of Construction Engineering and Management 139(1): 9–14. http://dx.doi.org/10.1061/(asce)co.1943-7862.0000567
- Saidi, K. S.; Teizer, J.; Franaszek, M.; Lytle, A. M. 2011. Static and dynamic performance evaluation of a commerciallyavailable ultra wideband tracking system, Automation in Construction 20(5): 519–530. http://dx.doi.org/10.1016/j.autcon.2010.11.018
- Schikora, K.; Piegendorfer, M.; Filus, M. 2013. Plane and threedimensional analysis in tunneling using the example of current and planned construction, BetonUnd Stahlbetonbau 108(4): 252–263. http://dx.doi.org/10.1002/best.201200084
- Seo, J.; Lee, S.; Kim, J.; Kim, S. K. 2011. Task planner design for an automated excavation system, Automation in Construction 20(7): 954–966. http://dx.doi.org/10.1016/j.autcon.2011.03.013
- Sepasgozar, S. M. E.; Bernold, L. E. 2013. Factors influencing the decision of technology adoption in construction, in Developing the Frontier of Sustainable Design, Engineering, and Construction – Proceedings of the 2012 International Conference on Sustainable Design and Construction (ICSDEC 2012), 2012, Fort Worth, TX, United States, 654–661. http://dx.doi.org/10.1061/9780784412688.078
- Shen, Z.; Zhu, Y. 2011. Complex engineering system learning through study of engineering failure cases using 3D animations, in ASEE Annual Conference and Exposition, 2011, Vancouver, BC, Canada, . 16 p.
- Shin, J. M.; Kim, S. Y.; Kim, G. H.; Jung, M. G.; Shin, D. W. 2014. Ubiquitous sensor network for construction site monitoring, Advanced Materials Research 919–921: 388–391. http://dx.doi.org/10.4028/www.scientific.net/AMR.919-921.388
- Siebert, S.; Teizer, J. 2014. Mobile 3D mapping for surveying earthwork projects using an Unmanned Aerial Vehicle (UAV) system, Automation in Construction 41: 1–14. http://dx.doi.org/10.1016/j.autcon.2014.01.004
- Simanaviciene, R.; Liaudanskiene, R.; Ustinovichius, L. 2012. A new synthesis method of structural, technological and safety decisions (SyMAD-3), Journal of Civil Engineering and Management 18(2): 265–276. http://dx.doi.org/10.3846/13923730.2012.666504
- Simanaviciene, R.; Liaudanskiene, R.; Ustinovichius, L. 2014. Assessing reliability of design, construction, and safety related decisions, Automation in Construction 39: 47–58. http://dx.doi.org/10.1016/j.autcon.2013.11.008
- Skibniewski, M. J. 1988. Robotics in civil engineering. Southampton, Boston, New York: Computational Mechanics, Van Nostrand Reinhold. 233 p.
- Skibniewski, M. J. 2014. Research trends in information technology applications in construction safety engineering and management, in Frontiers of engineering management, vol. 3. Chinese Academy of Engineering, China. http://dx.doi.org/10.15302/J-FEM-2014034
- Sparer, E. H.; Dennerlein, J. T. 2013. Determining safety inspection thresholds for employee incentives programs on construction sites, Safety Science 51(1): 77–84. http://dx.doi.org/10.1016/j.ssci.2012.06.009
- Sulankivi, K.; Mäkelä, T.; Kiviniemi, M. 2009. BIM-based site layout and safety planning, VTT Symposium (Valtion Teknillinen Tutkimuskeskus) 259: 125–140.
- Syachrani, S.; Jeong, H. S.; Rai, V.; Chae, M. J.; Iseley, T. 2010. A risk management approach to safety assessment of trenchless technologies for culvert rehabilitation, Tunnelling and Underground Space Technology 25(6): 681–688. http://dx.doi.org/10.1016/j.tust.2010.05.005
- Talmaki, S. A.; Dong, S.; Kamat, V. R. 2010. Geospatial Databases and Augmented Reality visualization for improving safety in urban excavation operations, in Innovation for Reshaping Construction Practice – Proceedings of the 2010 Construction Research Congress, 2010, Banff, AB, Canada, 91–101. http://dx.doi.org/10.1061/41109(373)10
- Tam, V. W. Y.; Fung, I. W. H. 2011. Tower crane safety in the construction industry: a Hong Kong study, Safety Science 49(2): 208–215. http://dx.doi.org/10.1016/j.ssci.2010.08.001
- Tang, X.; Yamada, H. 2011. Tele-operation construction robot control system with virtual reality technology, in 2011 International Conference on Advanced in Control Engineering and Information Science, 2011, Dali, China, 1071–1076. http://dx.doi.org/10.1016/j.proeng.2011.08.198
- Teizer, J. 2007. Automated monitoring of construction processes for management decision making, in Construction and Building Research Conference of the Royal Institution of Chartered Surveyors (COBRA 2007), 2007, Atlanta, GA, United States.
- Teizer, J.; Allread, B. S.; Mantripragada, U. 2010. Automating the blind spot measurement of construction equipment, Automation in Construction 19(4): 491–501. http://dx.doi.org/10.1016/j.autcon.2009.12.012
- Teizer, J.; Castro-Lacouture, D. 2007. Combined ultrawideband positioning and range imaging sensing for productivity and safety monitoring in building construction, in Congress on Computing in Civil Engineering (ASCE 2007), 2007, Pittsburgh, PA, United States, 681–688. http://dx.doi.org/10.1061/40937(261)81
- Teizer, J.; Lao, D.; Sofer, M. 2007. Rapid automated monitoring of construction site activities using ultra-wideband, in Proceedings of the 24thInternational Symposium on Automation and Robotics in Construction (ISARC 2007), 19–21 September 2007, Kochi, India, 23–28.
- Teizer, J.; Venugopal, M.; Walia, A. 2008. Ultrawideband for automated real-time three-dimensional location sensing for workforce, equipment, and material positioning and tracking, Transportation Research Record 2081: 56–64. http://dx.doi.org/10.3141/2081-06
- Wang, H. 2013. Environmental monitoring system based on ZigBee wireless sensor and low-power technology, Advanced Materials Research 662: 701–704. http://dx.doi.org/10.4028/www.scientific.net/AMR.662.701
- Wang, Q.; Liu, W.; Gao, C.; Wang, F. 2011. Hardware design of monitoring and warning system for coal mine highvoltage power supply network, Advanced Materials Research 271–273: 1015–1019. http://dx.doi.org/10.4028/www.scientific.net/AMR.271-273.1015
- Wang, Q. K.; Wang, S. Q. 2009. Establishment of construction safety monitoring management information system for metro engineering, Wuhan Ligong Daxue Xuebao/Journal of Wuhan University of Technology 31(23): 72–76. http://dx.doi.org/10.3963/j.issn.1671-4431.2009.23.017
- Wu, H.; Tao, J.; Li, X.; Chi, X.; Li, H.; Hua, X.; Yang, R.; Wang, S.; Chen, N. 2013a. A location based service approach for collision warning systems in concrete dam construction, Safety Science 51(1): 338–346. http://dx.doi.org/10.1016/j.ssci.2012.08.006
- Wu, S. L.; Deng, H. L.; Chen, K. J.; Zhu, M. Y.; Huang, D. H.; Fu, S. Y. 2013b. Visual monitoring technology of the tunnel 3D laser scanning and engineering applications, Advanced Materials Research 779: 463–468. http://dx.doi.org/10.4028/www.scientific.net/AMR.779-780.463
- Wu, W. W.; Yang, H. J.; Chew, D. A. S.; Yang, S. H.; Gibb, A. G. F.; Li, Q. M. 2010. Towards an autonomous real-time tracking system of near-miss accidents on construction sites, Automation in Construction 19(2): 134–141. http://dx.doi.org/10.1016/j.autcon.2009.11.017
- Xie, H.; Shi, W.; Issa, R. R. A. 2011. Using rfid and real-time virtual reality simulation for optimization in steel construction, Electronic Journal of Information Technology in Construction 16: 291–308. http://www.itcon.org/2011/19
- Xue, Z.; Li, Y.; Chen, Z. 2011. Research on the dynamic intelligent management system of Highway Safety and Quality Control, Advanced Materials Research 271–273: 344–350. http://dx.doi.org/10.4028/www.scientific.net/AMR.271-273.344
- Yamamoto, H.; Moteki, M.; Shao, H.; Ootuki, K.; Yanagisawa, Y.; Sakaida, Y.; Nozue, A.; Yamaguchi, T.; Yuta, S. 2010. Development of the autonomous hydraulic excavator prototype using 3-D information for motion planning and control, in 2010 IEEE/SICE International Symposium on System Integration: SI International 2010 – The 3rdSymposium on System Integration (SII 2010), 21–22 December 2010, Sendai, Japan, 49–54. http://dx.doi.org/10.1109/SII.2010.5708300
- Yang, H.; Chew, D. A. S.; Wu, W.; Zhou, Z.; Li, Q. 2012. Design and implementation of an identification system in construction site safety for proactive accident prevention, Accident Analysis and Prevention 48: 193–203. http://dx.doi.org/10.1016/j.aap.2011.06.017
- Yang, J. G.; Ma, W. 2011. Application for fiber bragg grating sensor in internal force testing of lining structure, Advanced Materials Research 219–220: 746–749. http://dx.doi.org/10.4028/www.scientific.net/AMR.219-220.746
- Yang, Q.; Zheng, J.; Ding, L.; Zhang, R. 2010. Threedimensional numerical simulation of deep excavation adjacent to viaduct foundation, Huazhong Keji Daxue Xuebao (Ziran Kexue Ban)/Journal of Huazhong University of Science and Technology (Natural Science Edition) 38(6): 120–123, 128..
- Ye, Y.; Mu, Q.; Zhang, C. 2009. Tunnel construction multivariate information forewarning and safety management system research, Yanshilixue Yu Gongcheng Xuebao/ Chinese Journal of Rock Mechanics and Engineering 28(5): 900–907.
- Ye, Y.; Sun, W.; Yang, X.; Zhang, Z.; Wang, X. 2013. Informational early warning platform for tunnel construction, Modern Tunnelling Technology 50(4): 24–29.
- Yoo, W. S.; Lee, H. J.; Kim, D. I.; Kang, K. I.; Cho, H. 2012. Genetic algorithm-based steel erection planning model for a construction automation system, Automation in Construction 24: 30–39. http://dx.doi.org/10.1016/j.autcon.2012.02.007
- Yoon, S. W.; Chin, S.; Kim, Y. S.; Kwon, S. W. 2006 . An application model of RFID technology on progress measurement and management of construction works, in 2006 Proceedings of the 23rdInternational Symposium on Robotics and Automation in Construction (ISARC 2006), 3–5 November 2006, Tokyo, Japan, 779–783.
- Zhang, J. P.; Hu, Z. Z. 2011. BIMand 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 1. Principles and methodologies, Automation in Construction 20(2): 155–166. http://dx.doi.org/10.1016/j.autcon2010.09.013
- Zhang, L.; Wu, X.; Ding, L.; Chen, Y.; Skibniewski, M. J. 2013a. Risk identification expert system for metro construction based on BIM, in 30thInternational Symposium on Automation and Robotics in Construction and Mining, Held in Conjunction with the 23rdWorld Mining Congress (ISARC 2013), 11–15 August 2013, Montreal, QC, Canada, 1437–1446.
- Zhang, L.; Wu, X.; Ding, L.; Skibniewski, M. J.; Yan, Y. 2013b. Decision support analysis for safety control in complex project environments based on Bayesian Networks, Expert Systems with Applications 40(11): 4273–4282. http://dx.doi.org/10.1016/j.eswa.2012.11.022
- Zhang, N. Q.; Yu, M.; Zhang, X.; Fu, J.; Wu, H. S. 2013c. Enhancing tower crane safety using condition monitoring system, Applied Mechanics and Materials 418: 80–83. http://dx.doi.org/10.4028/www.scientific.net/AMM.418.80
- Zhang, Q. Y.; Chen, X. P.; Liu, D. W.; Hu, J. Z.; Li, J.; Cai, D. W. 2009. Development of monitoring information management and monitoring data analysis network system for geotechnical engineering and its application, Yantu Lixue/Rock and Soil Mechanics 30(2): 362–366, 373.
- Zhang, S. J.; Teizer, J.; Lee, J. K.; Eastman, C. M.; Venugopal, M. 2013d. Building Information Modeling (BIM) and safety: automatic safety checking of construction models and schedules, Automation in Construction 29: 183–195. http://dx.doi.org/10.1016/j.autcon.2012.05.006
- Zhao, D.; Ye, Y. 2012. Using virtual environments simulation to improve construction safety: an application of 3D online-game based training, Lecture Notes in Electrical Engineering 172 LNEE: 269–277. http://dx.doi.org/10.1007/978-3-642-31006-5_33
- Zhao, J.; Ju, H.; Li, J.; Liu, Y. 2012. The monitoring technology research about the tunnel blasting vibration under the complex construction, Advanced Materials Research 594–597: 1078–1081. http://dx.doi.org/10.4028/www.scientific.net/AMR.594-597.1078
- Zhou, Y.; Ding, L.; Chen, L. 2013a. Application of 4D visualization technology for safety management in metro construction, Automation in Construction 34: 25–36. http://dx.doi.org/10.1016/j.autcon.2012.10.011
- Zhou, Y.; Ding, L.; Luo, H.; Chen, L. 2010. Research and application on 6D integrated system in metro construction based on BIM, in 2010 International Conference on Advanced Mechanical Engineering (AME 2010), 2010, Luoyang, China, 241–245. http://dx.doi.org/10.4028/www.scientific.net/AMM.26-28.241
- Zhou, Z.; Irizarry, J.; Li, Q. 2013b. Applying advanced technology to improve safety management in the construction industry: a literature review, Construction Management and Economics 31(6): 606–622. http://dx.doi.org/10.1080/01446193.2013.798423
- Zhou, Z. P.; Li, Q. M.; Wu, W. W. 2012. Developing a versatile subway construction incident database for safety management, Journal of Construction Engineering and Management 138(10): 1169–1180. http://dx.doi.org/10.1061/(asce)co.1943-7862.0000518
- Zhu, X.; Xue, X.; Chen, M.; Zhou, H. 2013. Mobile IT used in construction: a case for scaffolding safety management, in Construction and Operation in the Context of Sustainability – Proceedings of the 2013 International Conference on Construction and Real Estate Management (ICCREM 2013), 10–11 October 2013, Karlsruhe, Germany, 482–491. http://dx.doi.org/10.1061/9780784413135.046