References
- Akintoye, A. 2009. PPPs for physical infrastructure in developing countries, in Policy, management and finance of public private partnerships. New York: Wiley, 123–144.
- Akintoye, A.; Beck, M.; Hardcastle, C. (Eds.). 2003. Public– private partnerships: managing risks and opportunities. Oxford, UK: Blackwell Science Ltd. 448 p. http://dx.doi.org/10.1002/9780470690703
- Alavi, A. H.; Gandomi, A. H. 2011. Prediction of principal ground-motion parameters using a hybrid method coupling artificial neural networks and simulated annealing, Computers and Structures 89(23–24): 2176–2194. http://dx.doi.org/10.1016/j.compstruc.2011.08.019
- Apanaviciene, R.; Juodis, A. 2003. Construction project management effectiveness modelling with neural networks, Journal of Civil Engineering and Management 9(1): 59–67. http://dx.doi.org/10.1080/13923730.2003.10531302
- ASHRAE. 2006. ASHRAE green guide: the design, construction, and operation of sustainable buildings. American Society of Heating, Refrigerating Air-conditioning Engineers, Atlanta, GA. 488 p.
- Azamathulla, H. M.; Ahmad, Z. 2013. Estimation of critical velocity for slurry transport through pipeline using adaptive neuro-fuzzy interference system and gene-expression programming, Journal of Pipeline Systems Engineering and Practice 4(2): 131–137. http://dx.doi.org/10.1061/(ASCE)PS.1949-1204.0000123
- Baalousha, Y.; Çelik, T. 2011. An integrated web-based data warehouse and artificial neural networks system for unit price analysis with inflation adjustment, Journal of Civil Engineering and Management 17(2): 157–167. http://dx.doi.org/10.3846/13923730.2011.576806
- Chen, T.-C.; Lin, Y.-C.; Wang, L.-C. 2012. The analysis of BOT strategies based on game theorycase study on Taiwan’s high speed rail way project, Journal of Civil Engineering and Management 18(5): 662–674. http://dx.doi.org/10.3846/13923730.2012.723329
- Dikmen, U. S.; Sonmez, M. 2011. An artificial neural networks model for the estimation of formwork labour, Journal of Civil Engineering and Management 17(3): 340–347. http://dx.doi.org/10.3846/13923730.2011.594154
- Emsley, M. W.; Lowe, D. J.; Duff, A. R.; Harding, A.; Hickson, A. 2002. Data modeling and the application of a neural network approach to the prediction of total construction cost, Construction Management and Economics 20(6): 465–472. http://dx.doi.org/10.1080/01446190210151050
- Fazly, M.; Azamathulla, H. M.; Rozi, A. 2014. Prediction of soil erodibility factor for Peninsular Malaysia soil series using ANN, Neural Computing & Applications 24(2): 383–389. http://dx.doi.org/10.1007/s00521-012-1236-3
- Gandomi, A. H.; Alavi, A. H. 2009. Applications of computational intelligence in behavior simulation of concrete materials, in Computational optimization and applications in engineering and industry, SCI Vol. 359. Springer, 221–224.
- Gandomi, A. H.; Roke, D. A. 2013. Intelligent formulation of structural engineering systems, in Seventh M.I.T. Conference on Computational Fluid and Solid Mechanics – Focus: Multiphysics & Multiscale, 12–14 June 2013, Massachusetts Institute of Technology, Cambridge, MA. 5 p.
- Gandomi, A. H.; Yang, X.; Talatahari, S.; Alavi, A. H. 2013. Metaheuristics in modeling and optimization, in Metaheuristic applications in structures and infrastructures. Waltham, MA: Elsevier, 1–24. http://dx.doi.org/10.1016/B978-0-12-398364-0.00001-2
- Gandomi, M.; Soltanpour, M.; Zolfaghari, M. R.; Gandomi, A. H. 2016. Prediction of peak ground acceleration of Iran’s tectonic regions using a hybrid soft computing technique, Geoscience Frontiers 7(1): 75–82. http://dx.doi.org/10.1016/j.gsf.2014.10.004
- Grimsey, D.; Lewis, M. K. 2004. Public private partnerships: the worldwide revolution in infrastructure provision and project finance. Edvard Elgar, UK. 288 p. http://dx.doi.org/10.4337/9781845423438
- Gunaydin, H. M.; Dogan, S. Z. 2004. A neural network approach for early cost estimation of structural systems of buildings, International Journal of Project Management 22(7): 595–602. http://dx.doi.org/10.1016/j.ijproman.2004.04.002
- Hasanzadehshooiili, H.; Lakirouhani, A.; Medzvieckas, J. 2012. Superiority of artificial neural networks over statistical methods in prediction of the optimal length of rock bolts, Journal of Civil Engineering and Management 18(5): 655–661. http://dx.doi.org/10.3846/13923730.2012.724029
- Ho, S. P. 2006. Model for financial renegotiation in publicprivate partnership projects and its policy implications: game theoric view, Journal of Construction Engineering and Management 132(7): 678–688. http://dx.doi.org/10.1061/(ASCE)0733-9364(2006)132:7(678)
- Jenkins, G.; Kuo, C. Y.; Harberger, A. C. 2011. Cost-Benefit analysis for investment decisions. Chapter 8. Kingston: Queen’s University. 39 p.
- Jin, X. H.; Zhang, G. 2011. Modelling optimal risk allocation in PPP projects using artificial neural networks, International Journal of Project Management 29(5): 591–603. http://dx.doi.org/10.1016/j.ijproman.2010.07.011
- Kim, G.-H.; Yoon, J.-E.; An, S.-H.; Cho, H.-H.; Kang, K.-I. 2004. Neural network model incorporating a genetic algorithm in estimating construction costs, Building and Environment 39(11): 1333–1340. http://dx.doi.org/10.1016/j.buildenv.2004.03.009
- Liou, F. M.; Huang, C. P. 2008. Automated approach to negotiations of BOT contracts with the consideration of project risk, Journal of Construction Engineering and Management 134(1): 18–24. http://dx.doi.org/10.1061/(ASCE)0733-9364(2008)134:1(18)
- Malini, E. 1999. Build operate transfer municipal bridge projects in India, Journal of Management in Engineering 15(4): 51–58. http://dx.doi.org/10.1061/(ASCE)0742-597X(1999)15:4(51)
- Najafzadeh, M.; Azamathulla, H. M. 2014. Neuro-fuzzy GMDH to predict the scour pile groups due to waves, Journal of Computing in Civil Engineering, 04014068.
- Ngee, L.; Tiong, R. L. K.; Alum, J. 1997. Automated approach to negotiation of BOT contracts, Journal of Computing in Civil Engineering 11(2): 121–128. http://dx.doi.org/10.1061/(ASCE)0887-3801(1997)11:2(121)
- Ng, S. T.; Xie, J.; Cheung, Y. K.; Jefferies, M. 2007. A simulation model for optimizing the concession period of public–private partnerships schemes, International Journal of Project Management 25(8): 791–798. http://dx.doi.org/10.1016/j.ijproman.2007.05.004
- Ocakoglu, O. G. 2011. Zaman [online], [cited 20 October 2011]. Available from Internet: www.zaman.com.tr.
- Shen, L.; Li, H.; Li, Q. 2002. Alternative concession model for build/operate/transfer contract projects, Journal of Construction Engineering and Management 128(4): 326–330. http://dx.doi.org/10.1061/(ASCE)0733-9364(2002)128:4(326)
- Shen, L. Y.; Wu, Y. Z. 2005. Risk concession model for build/ operate/transfer contract projects, Journal of Construction Engineering and Management 131(2): 211–220. http://dx.doi.org/10.1061/(ASCE)0733-9364(2005)131:2(211)
- Smith, A.; Mason, A. 1997. Cost estimation predictive modelling: regression versus neural network, Engineering Economist 42(2): 137–161. http://dx.doi.org/10.1080/00137919708903174
- Sodikov, J. 2005. Cost estimation of highway projects in developing countries: artificial neural network approach, Journal of the Eastern Asia Society for Transportation Studies 6: 1036–1047.
- Tatari, O.; Kucukvar, M. 2011. Cost premium prediction of certified green buildings: a neural network approach, Building and Environment 46(5): 1081–1086. http://dx.doi.org/10.1016/j.buildenv.2010.11.009
- Weckman, G. R.; Paschold, H. W.; Dowler, J. D.; Whiting, H. S.; Young, W. A. 2010. Using neural networks with limited data to estimate manufacturing cost, Journal of Industrial and Systems Engineering 3(4): 257–264.
- Xenidis, Y.; Angelides, D. 2005. The financial risks in buildoperate-transfer projects, Construction Management and Economics 23(4): 431–441. http://dx.doi.org/10.1080/01446190500041552
- Yaghouby, F.; Ayatollahi, A.; Bahramali, R.; Yaghouby, M.; Alavi, A. H. 2010. Towards automatic detection of atrial fibrillation: a hybrid computational approach, Computers in Biology and Medicine 40(11–12): 919–930. http://dx.doi.org/10.1016/j.compbiomed.2010.10.004
- Yaghouby, F.; Ayatollahi, A. B. R.; Yaghouby, M. 2012. Robust genetic programming-based detection of atrial fibrillation using RR intervals, Expert Systems 29(2): 183–199. http://dx.doi.org/10.1111/j.1468-0394.2010.00571.x
- Yaghouby, F.; Ayatollahi, A.; Soleimani, R. 2009. Classification of cardiac abnormalities using reduced features of heart rate variability signal, World Applied Science Journal 6(11): 1547–1554.
- Yang, Y.; Guo, M.; Hu, W. 2007. Effect of diversification of operation cost on infrastructure BOT project investment decision and analysis of option game, China Population, Resources and Environment 17(2): 32–35. doi: 10.1016/S1872-583X(07)60009-6
- Yuan, J.-F.; Skibniewski, M. J.; Li, Q.; Shan, J. 2010. The driving factors of China’s public-private partnership projects in Metropolitian transportation systems: public sector’s viewpoint, Journal of Civil Engineering and Management 16(1): 5–18. http://dx.doi.org/10.3846/jcem.2010.01
- Zhang, X. Q.; Kumaraswamy, M. M. 2001. Hong Kong experience in managing BOT projects, Journal of Construction Engineering and Management 127(2): 154–162. http://dx.doi.org/10.1061/(ASCE)0733-9364(2001)127:2(154)