References
- Akgüngör , A. P. 2008a . A new delay parameter dependent on variable analysis periods at signalized intersections. Part 1: Model development . Transport , 23 (1) : 31 – 36 . doi:10.3846/1648–4142.2008.23.31–36
- Akgüngör , A. P. 2008b . A new delay parameter dependent on variable analysis periods at signalized intersections. Part 2: Validation and application . Transport , 23 (2) : 91 – 94 . doi:10.3846/1648–4142.2008.23.91–94
- Allen , M. T. and Floyd , C. E . 1991 . Alternative Financing Techniques in Funding Major Highway Reconstruction Projects . Transportation Quarterly , 45 (3) : 357 – 368 .
- Antov , D. , Abel , K. , Sürje , P. , Rõuk , H. and Rõivas , T. 2009 . Speed reduction effects of urban roundabouts . The Baltic Journal of Road and Bridge Engineering , 4 (1) : 22 – 26 . doi:10.3846/1822–427X.2009.4.22–26
- Basu , D. and Maitra , B. 2007 . Valuing attributes of enhanced traffic information: an experience in Kolkata . Transport , 22 (3) : 164 – 173 .
- Bazaras , J. , Jablonskyte , J. and Jotautiene , E. 2008 . Interdependence of noise and traffic flow . Transport , 23 (1) : 67 – 72 . doi:10.3846/1648–4142.2008.23.67–72
- Berezhnoy , A. , Grakovsky , A. and Nesterov , A. 2007 . The “green wave” mode production on the two‐lane highways during the construction works time period . Transport , 22 (4) : 263 – 268 .
- Brauers , W. K. and Zavadskas , E. K. 2006 . The MOORA method and its application to privatization in a transition economy . Control and Cybernetics , 35 (2) : 445 – 469 .
- Brauers , W. K. and Zavadskas , E. K. 2009 . Robustness of the multi‐objective MOORA method with a test for the facilities sector . Technological and Economic Development of Economy , 15 (2) : 352 – 375 . doi:10.3846/1392–8619.2009.15.352–375
- Brauers , W. K. M. , Zavadskas , E. K. , Peldschus , F. and Turskis , Z. 2008a . Multi‐objective decision‐making for road design . Transport , 23 (3) : 183 – 193 . doi:10.3846/1648–4142.2008.23.183–193
- Brauers , W. K. M. , Zavadskas , E. K. , Turskis , Z. and Vilutiene , T. 2008b . Multi‐objective contractor's ranking by applying the MOORA method . Journal of Business Economics and Management , 9 (4) : 245 – 255 . doi:10.3846/1611–1699.2008.9.245–255
- Burinskiene , M. 2009 . New methodology for sustainable development towards sustainable transportation system . Technological and Economic Development of Economy , 15 (1) : 5 – 9 . doi:10.3846/1392–8619.2009.15.5–9
- Burinskiene , M. , Paliulis , G. M. and Ušpalyte‐Vitkūniene , R. 2009 . “ [City Public Transport: Textbook] ” . In Miestu viešasis transportas , 191 Vilnius : Technika . mokomoji knyga(in Lithuanian)
- Burinskiene , M. and Rudzkiene , V. 2009 . Future insights, scenarios and expert method application in sustainable territorial planning . Technological and Economic Development of Economy , 15 (1) : 10 – 25 . doi:10.3846/1392–8619.2009.15.10–25
- Čygas , D. , Laurinavičius , A. , Vaitkus , A. , Perveneckas , Z. and Motiejūnas , A. 2008 . Research of asphalt pavement structures on Lithuanian roads (I) . The Baltic journal of Road and Bridge Engineering , 3 (2) : 77 – 83 . doi:10.3846/1822–427X.2008.3.77–83
- Easa , S. M. and Mehmood , A. 2007 . Establishing highway horizontal alignment to maximize design consistency . Canadian Journal of Civil Engineering , 34 (9) : 1159 – 1168 . doi:10.1139/L07–043
- Fwa , T. F. , Chan , W. T. and Sim , Y. P. 2002 . Optimal vertical alignment analysis for highway design . Journal of Transportation Engineering , 128 (5) : 395 – 402 . doi:10.1061/(ASCE)0733–947X(2002)128:5(395)
- Gintalas , V. , Čygas , D. , Žilioniene , D. and Puodžiukas , V. 2007a . Longitudinal profile of the objects included in the gravel roads paving programme of Lithuania . The Baltic Journal of Road and Bridge Engineering , 2 (2) : 53 – 59 .
- Gintalas , V. , Čygas , D. , Žilioniene , D. , Puodžiukas , V. and Laši‐nyte , A. 2007b . Research and evaluation of the effect of taking the land for public needs on the cost of gravel road reconstruction . The Baltic Journal of Road and Bridge Engineering , 2 (4) : 165 – 171 .
- Gopalakrishnan , K. 2008 . Predicting capacities of runways serving new large aircraft . Transport , 23 (1) : 44 – 50 . doi:10.3846/1648–4142.2008.23.44–50
- Helbing , D. and Greiner , A. 1997 . Modeling and simulation of multi‐lane traffic flow . Physical Review E , 55 (5) : 5498 – 5508 . doi:10.1103/PhysRevE.55.5498
- Higgins , T. J. 1993 . Monitoring and Evaluating Highway Reconstruction Strategies . Transportation Quarterly , 47 (4) : 525 – 544 .
- Hugo , D. , Heyns , S. P. , Thompson , R. J. and Visser , A. T. 2007 . Condition‐triggered maintenance for mine haul roads with reconstructed‐vehicle response to haul road defects . Transportation Research Record , 1989 (2) : 254 – 260 .
- Jakimavičius , M. and Burinskiene , M. 2007 . Automobile transport system analysis and ranking in Lithuanian administrative regions . Transport , 22 (3) : 214 – 220 .
- Jakimavičius , M. and Burinskiene , M. 2009 . A GIS and multi‐criteria‐based analysis and ranking of transportation zones of Vilnius city . Technological and Economic Development of Economy , 15 (1) : 39 – 48 . doi:10.3846/1392–8619.2009.15.39–48
- Junevičius , R. and Bogdevičius , M. 2007 . Determination of traffic flow parameters in different traffic flow interaction cases . Transport , 22 (3) : 236 – 239 .
- Junevičius , R. , Bogdevičius , M. and Hunt , U. 18–19 October 2007 . “ Roundabout traffic flow intersection ” . In Transport Means 2007, Proceedings , 18–19 October , 10 – 14 . Lithuania : Kaunas . 2007
- Kapski , D. , Leonovich , I. , Ratkevičiūte , K. and Miškinis , D. 2008 . Implementation of experimental research in road traffic: theory and practice . The Baltic Journal of Road and Bridge Engineering , 3 (2) : 101 – 108 . doi:10.3846/1822–427X.2008.3.101–108
- Kinderyte‐Poškiene , J. and Sokolovskij , E. 2008 . Trafile control elements influence on accidents, mobility and the environment . Transport , 23 (1) : 55 – 58 . doi:10.3846/1648–4142.2008.23.55–58
- Leden , L. , Wikstrom , P. E. , Garder , P. and Rosander , P. 2006 . Safety and accessibility effects of code modifications and traffic calming of an arterial road . Accident Analysis and Prevention , 38 (3) : 455 – 461 . doi:10.1016/j.aap.2005.11.002
- Lee , E.‐B and Thomas , D. K. 2007 . State‐of‐practice technologies on accelerated urban highway rehabilitation: I‐15 California experience . Journal of Construction Engineering and Management , 133 (2) : 105 – 113 . doi:10.1061/(ASCE)0733–9364(2007)133:2(105)
- Lee , E.‐B. , Lee , H. and Harvey , J. T. 2006 . Fast‐track urban freeway rehabilitation with 55‐h weekend closures: I‐710 long beach case study . Journal of Construction Engineering and Management , 132 (5) : 465 – 472 . doi:10.1061/(ASCE)0733–9364(2006)132:5(465)
- Lee , E.‐B. , Thomas , D. and Bloomberg , L. 2005 . Planning urban highway reconstruction with traffic demand affected by construction schedule . Journal of Transportation Engineering , 131 (10) : 752 – 761 . doi:10.1061/(ASCE)0733–947X(2005)131:10(752)
- Li , Z. 2007 . Pavement preventive maintenance for highway based on cost‐benefit analysis . Journal of Highway and Transportation Research and Development , 24 (12) : 19 – 23 .
- Lundkvist , S.‐O. and Isacsson , U. 2008 . Condition assessment of road equipment ‐ state‐of‐the‐art . The Baltic Journal of Road and Bridge Engineering , 3 (2) : 84 – 92 . doi:10.3846/1822–427X.2008.3.84–92
- Paliulis , G. M. 2007 . “ mokomoji knyga [Traffic Engineering: Textbook] ” . In Eismo inžinerija: , Vilnius : Technika . 119(in Lithuanian)
- Palšaitis , E. , Sakalauskas , K. and Vidugiris , L. 1990 . “ vadovelis aukštuju mokyklu automobiliu keliu specialybes studentams [Maintenance of Roads. Textbook] ” . In Keliu eksploatacija: , 195 Vilnius : Technika . (in Lithuanian)
- Paslawski , J. 2008a . Flexibility approach in the runway pavement using FLEMANCO method . Transport , 23 (4) : 341 – 350 . doi:10.3846/1648–4142.2008.23.341–350
- Paslawski , J. 2008b . Flexibility approach in construction process engineering . Technological and Economic Development of Economy , 14 (4) : 518 – 530 . doi:10.3846/1392–8619.2008.14.518–530
- Paslawski , J. 2009 . Flexibility in highway noise management . Transport , 24 (1) : 66 – 75 . doi:10.3846/1648–4142.2009.24.66–75
- Raab , C. and Partl , M. N. 2008 . Investigation into a long‐term in‐terlayer bonding of asphalt pavements . The Baltic Journal of Road and Bridge Engineering , 3 (2) : 65 – 70 . doi:10.3846/1822–427X.2008.3.65–70
- Sivilevičius , H. and Šukevičius , Š . 2009 . Manufacturing technologies and dynamics of hot‐mix asphalt mixture production . Journal of Civil Engineering and Management , 15 (2) : 169 – 179 . doi:10.3846/1392–3730.2009.15.169–179
- Sivilevičius , H. and Šukevičius , Š . 2007 . Dynamics of vehicle loads on the asphalt pavement of European roads which cross Lithuania . The Baltic Journal of Road and Bridge Engineering , 2 (4) : 147 – 154 .
- Sivilevičius , H. and Vislavičius , K. 2008 . Stochastic simulation of the influence of variation of mineral material grading and dose weight on the homogeneity of hot‐mix asphalt . Construction and Building Materials , 22 (9) : 2007 – 2014 . doi:10.1016/j.conbuildmat.2007.07.001
- Sivilevičius , H. , Zavadskas , E. K. and Turskis , Z. 2008 . Quality attributes and complex assessment methodology of the asphalt mixing plant . The Baltic Journal of Road and Bridge Engineering , 3 (3) : 161 – 166 . doi:10.3846/1822–427X.2008.3.161–166
- Sužiedelyte‐Visockiene , J. 2007 . Technique for definition of break size of road covering on the bridge . Transport , 22 (2) : 122 – 125 .
- Šelih , J. , Kne , A. , Srdić , A. and Žura , M. 2008 . Multiple‐criteria decision support system in highway infrastructure management . Transport , 23 (4) : 299 – 305 . 299 – 305 . doi:10.3846/1648–4142.2008.23
- Šliupas , T. 2009 . The impact of road parameters and the surrounding area on traffic accidents . Transport , 24 (1) : 42 – 47 . doi:10.3846/1648–4142.2009.24.42–47
- Tampère , C. , Stada , J. and Immers , B. 2009 . Calculation of welfare effects of road pricing on a large scale road network . Technological and Economic Development of Economy , 15 (1) : 102 – 121 . 102 – 121 . doi:10.3846/1392–8619.2009.15
- Tanczos , K. and Torok , A. 2007 . Linear optimization model of urban areas’ operating efficiency . Transport , 22 (3) : 225 – 228 .
- Tarel , J.‐P. , Ieng , S.‐S and Charbonnier , P. Accurate and robust image alignment for road profile reconstruction . Proceedings 2007 IEEE International Conference on Image Processing, ICIP . September 16–19 2007 , San Antonio, USA. pp. V 365 – V 368 . 2007
- Yagi , Y. , Brady , M. , Kawasaki , Y. and Yachida , M. 2005 . Active contour road model for road tracking and 3D road shape reconstruction . Electronics and Communications in Japan (Part III: Fundamental Electronic Science) , 88 (9) : 42 – 52 . doi:10.1002/ecjc.20189
- Yu , S.‐J. , Sukumar , S. R. , Koschan , A. F. , Page , D. L. and Abidi , M. A. 2007 . 3D reconstruction of road surfaces using an integrated multi‐sensory approach . Optics and Lasers in Engineering , 45 (7) : 808 – 818 . doi:10.1016/j.optlaseng.2006.12.007
- Zavadskas , E. K. 2008 . Methods and models of research in construction project engineering . Journal of Business Economics and Management , 9 (3) : 240 – 243 . doi:10.3846/1611–1699.2008.9.240–243
- Zavadskas , E. K. , Kaklauskas , A. , Peldschus , F. and Turskis , Z. 2007 . Multi‐attribute assessment of road design solutions by using the COPRAS method . The Baltic Journal of Road and Bridge Engineering , 2 (4) : 195 – 203 .
- Zavadskas , E. K. , Liias , R. and Turskis , Z. 2008 . Multi‐attribute decision‐making methods for assessment of quality in bridges and road construction: state‐of‐the‐art surveys . The Baltic Journal of Road and Bridge Engineering , 3 (3) : 152 – 160 . doi:10.3846/1822–427X.2008.3.152–160
- Ziari , H. and Khabiri , M. M. 2007 . Interface condition influence on prediction for flexible pavement live . Journal of Civil Engineering and Management , 13 (1) : 71 – 76 .