References
- Abbasianjahromi, H.; Rajaie, H. 2012. Developing a project portfolio selection model for contractor firms considering the risk factor, Journal of Civil Engineering and Management 18(6): 879–889. http://dx.doi.org/10.3846/13923730.2012.734856
- Aghdaie, M. H.; Hashemkhani Zolfani, S.; Zavadskas, E. K. 2012. Prioritizing constructing projects of municipalities based on AHP and COPRAS-G: a case study about foot-bridges in Iran, The Baltic Journal of Road and Bridge Engineering 7(2): 145–153. http://dx.doi.org/10.3846/bjrbe.2012.20
- Alimardani, M.; Hashemkhani Zolfani, S.; Aghdaie, M. H.; Tamošaitienė, J. 2013. A novel hybrid SWARA and VIKOR methodology for supplier selection in an agile environment, Technological and Economic Development of Economy 19(3): 533–548. http://dx.doi.org/10.3846/20294913.2013.814606
- Asady, B.; Zendehman, A. 2007. Ranking fuzzy numbers by distance minimization, Applied Mathematical Modelling 31(11): 2589–2598. http://dx.doi.org/10.1016/j.apm.2006.10.018
- Behzadian, M.; Kazemzadeh, R. B.; Albadvi, A.; Aghdasi, M. 2010. PROMETHEE: A comprehensive literature review on methodologies and applications, European Journal of Operational Research 200(1): 198–215. http://dx.doi.org/10.1016/j.ejor.2009.01.021
- Bellman, R. E.; Zadeh, L. A. 1970. Decision-making in a fuzzy environment, Management Science 17(4): B-141–B-164. http://dx.doi.org/10.1287/mnsc.17.4.B141
- Bilsel, R. U.; Buyukozkan, G.; Ruan, D. 2006. A fuzzy preference-ranking model for a quality evaluation of hospital web sites, International Journal of Intelligent Systems 21(11): 1181–1197. http://dx.doi.org/10.1002/int.20177
- Brans, J.-P.; Mareschal, B. 2005. PROMETHEE Methods, in Figueira, J.; Greco, S.; Ehrgott, M. (Eds.). Multiple Criteria Decision Analysis: State of the Art Surveys, 163–196. http://dx.doi.org/10.1007/0-387-23081-5_5
- Brauers, W. K. M.; Zavadskas, E. K. 2008. Multi-objective optimization in location theory with a simulation for a department store, Transformations in Business & Economics 7(3): 163–183.
- Cheng, C.-H. 1998. A new approach for ranking fuzzy numbers by distance method, Fuzzy Sets and Systems 95(3): 307–317. http://dx.doi.org/10.1016/S0165-0114(96)00272-2
- De Keyser, W.; Peeters, P. 1996. A note on the use of PRO-METHEE multicriteria methods, European Journal of Operational Research 89(3): 457–461. http://dx.doi.org/10.1016/0377-2217(94)00307-6
- Dėjus, T.; Antuchevičienė, J. 2013. Assessment of health and safety solutions at a construction site, Journal of Civil Engineering and Management 19(5): 728–737. http://dx.doi.org/10.3846/13923730.2013.812578
- Detyniecki, M.; Yager, R. R. 2001. Ranking fuzzy numbers using α-weighted valuations, International Journal of Uncertainty, Fuzziness and Knowledge-Based Systems 8(5): 573–592. http://dx.doi.org/10.1142/S021848850000040X
- Elevli, B.; Ak, B. 2011. Samsun Lojistik Köy Yeri Alternatiflerin-in Çok Boyutlu Amaçlar Doğrultusunda Değerlendirilmesi, in Samsun Sempozyumu, 13–16 October 2011, Samsun, Turkey. (in Turkish).
- Ertuğrul, I.; Karakaşoğlu, N. 2008. Comparison of fuzzy AHP and fuzzy TOPSIS methods for facility location selection, The International Journal of Advanced Manufacturing Technology 39(7–8): 783–795. http://dx.doi.org/10.1007/s00170-007-1249-8
- Farahani, R. Z.; Steadie Seifi, M.; Asgari, N. 2010. Multiple criteria facility location problems: a survey, Applied Mathematical Modelling 34(7): 1689–1709. http://dx.doi.org/10.1016/j.apm.2009.10.005
- Geldermann, J.; Spengler, T.; Rentz, O. 2000. Fuzzy outranking for environmental assessment. Case study: iron and steel making industry, Fuzzy Sets and Systems 115(1): 45–65. http://dx.doi.org/10.1016/S0165-0114(99)00021-4
- Ghoseiri, K.; Lessan, J. 2008. Location selection for logistic centers using a two-step fuzzy-AHP and ELECTRE method, Proceedings of the 9th Asia Pacific Industrial Engineering & Management Systems Conference, 3–5 December 2008, Nusa Dua, Bali, Indonesia, 434–440.
- Goumas, M.; Lygerou, V. 2000. An extension of the PROMETHEE method for decision making in fuzzy environment: ranking of alternative energy exploitation projects, European Journal of Operational Research 123(3): 606–613. http://dx.doi.org/10.1016/S0377-2217(99)00093-4
- Hashemkhani Zolfani, S.; Aghdaie, M. H.; Derakhti, A.; Zavadskas, E. K.; Varzandeh, M. H. M. 2013a. Decision making on business issues with foresight perspective; an application of new hybrid MCDM model in shopping mall locating, Expert Systems with Applications 40(17): 7111–7121. http://dx.doi.org/10.1016/j.eswa.2013.06.040
- Hashemkhani Zolfani, S.; Rezaeiniya, N.; Aghdaie, M. H.; Zavadskas, E. K. 2012. Quality control manager selection based on AHPCOPRAS-G methods: a case in Iran, Ekonomska Istraživanja – Economic Research 25(1): 88–104.
- Hashemkhani Zolfani, S.; Šaparauskas, J. 2013. New application of SWARA method in prioritizing sustainability assessment indicators of energy system, Inzinerine Ekonomika – Engineering Economics 24(5): 408–414. http://dx.doi.org/10.5755/j01.ee.24.5.4526
- Hashemkhani Zolfani, S.; Zavadskas, E. K.; Turskis, Z. 2013b. Design of products with both international and local perspectives based on Yin-Yang balance theory and SWARA method, Ekonomska Istraživanja – Economic Research 26(2): 153–166.
- Kayikci, Y. 2010. A conceptual model for intermodal freight logistics centre location decisions, Procedia – Social and Behavioral Sciences 2(3): 6297–6311. http://dx.doi.org/10.1016/j.sbspro.2010.04.039
- Maskeliūnaitė, L.; Sivilevičius, H. 2012. Expert evaluation of criteria describing the quality of travelling by international passenger train: technological, economic and safety perspectives, Technological and Economic Development of Economy 18(3): 544–566. http://dx.doi.org/10.3846/20294913.2012.710178
- Nasseri, S. H.; Taleshian, F.; Alizadeh, Z.; Vahidi, J. 2012. A new method for ordering LR fuzzy number, The Journal of Mathematics and Computer Science 4(3): 283–294.
- Nutt, P. C. 2000. Context, tactics, and the examination of alternatives during strategic decision making, European Journal of Operational Research 124(1): 159–186. http://dx.doi.org/10.1016/S0377-2217(99)00165-4
- Palevičius, V.; Paliulis, G. M.; Venckauskaitė, J.; Vengrys, B. 2013. Evaluation of the requirement for passenger car parking spaces using multi-criteria methods, Journal of Civil Engineering and Management 19(1): 49–58. http://dx.doi.org/10.3846/13923730.2012.727463
- Rezaeiniya, N.; Hashemkhani Zolfani, S.; Zavadskas, E. K. 2012. Greenhouse locating based on ANP-COPRAS-G methods – an empirical study based on Iran, International Journal of Strategic Property Management 16(2): 188–200. http://dx.doi.org/10.3846/1648715X.2012.686459
- Shannon, C. E. 1948a. A mathematical theory of communication, Bell System Technical Journal 27(3): 379–423. http://dx.doi.org/10.1002/j.1538-7305.1948.tb01338.x
- Shannon, C. E. 1948b. A mathematical theory of communication, Bell System Technical Journal 27(4): 623–656. http://dx.doi.org/10.1002/j.1538-7305.1948.tb00917.x
- Tamošaitienė, J.; Šipalis, J.; Banaitis, A.; Gaudutis, E. 2013. Complex model for the assessment of the location of highrise buildings in the city urban structure, International Journal of Strategic Property Management 17(1): 93–109. http://dx.doi.org/10.3846/1648715X.2013.781968
- Theofanis, S.; Boile, M.; Gilbert, P.; Strauss-Wieder, A. 2010. Feasibility of Freight Villages in the NYMTC Region: Task 4 – Measure of Relevance. Rutgers Center for Advance Infrastructure and Transportation. 30 p. Available from Internet: http://www.nymtc.org/project/freight_planning/frtvillage/FrtVillage_files/Task4-Final.pdf
- TR 83 Bölgesi. Lojistik. Master Plani. 2010. Samsun, Aralik. 431 s. Available from Internet: http://www.samsuntso.org.tr/Dokuman/Raporlar/Lojistik_Master_Plan_tr83_2010.pdf (in Turkish).
- Tran, L.; Duckstein, L. 2002. Comparison of fuzzy numbers using a fuzzy distance measure, Fuzzy Sets and Systems 130(3): 331–341. http://dx.doi.org/10.1016/S0165-0114(01)00195-6
- Turskis, Z.; Zavadskas, E. K. 2010. A new fuzzy additive ratio assessment method (ARAS-F). Case study: The analysis of fuzzy multiple criteria in order to select the logistic centers location, Transport 25(4): 423–432. http://dx.doi.org/10.3846/transport.2010.52
- Yang, L.; Ji, X.; Gao, Z.; Li, K. 2007. Logistics distribution centers location problem and algorithm under fuzzy environment, Journal of Computational and Applied Mathematics 208(2): 303–315. http://dx.doi.org/10.1016/j.cam.2006.09.015
- Yazdani-Chamzini, A.; Yakhchali, S. H.; Zavadskas, E. K. 2012. Using a integrated MCDM model for mining method selection in presence of uncertainty, Ekonomska Istraživanja – Economic Research 25(4): 869–904.
- Zavadskas, E. K.; Antuchevičienė, J.; Šaparauskas, J.; Turskis, Z. 2013a. MCDM methods WASPAS and MULTIMOORA: verification of robustness of methods when assessing alternative solutions, Journal of Economic Computation and Economic Cybernetics Studies and Research 47(2): 5–20.
- Zavadskas, E. K.; Turskis, Z.; Volvačiovas, R.; Kildienė, S. 2013b. Multi-criteria assessment model of technologies, Studies in Informatics and Control 22(4): 249–258.
- Zhang, K.; Kluck, C.; Achari, G. 2009. A Comparative approach for ranking contaminated sites based on the risk assessment paradigm using fuzzy PROMETHEE, Environmental Management 44(5): 952–967. http://dx.doi.org/10.1007/s00267-009-9368-7
- Wang, S.; Liu, P. 2007. The evaluation study on location selection of logistics center based on fuzzy AHP and TOPSIS, in International Conference on Wireless Communications, Networking and Mobile Computing (WiCom 2007), 21–25 September 2007, Shanghai, 3779–3782. http://dx.doi.org/10.1109/WICOM.2007.935
- Wang, Y.-M.; Yang, J.-B.; Xu, D.-L.; Chin, K.-S. 2006. On the centroids of fuzzy numbers, Fuzzy Sets and Systems 157(7): 919–926. http://dx.doi.org/10.1016/j.fss.2005.11.006