References
- Abdul-Aziz, A.-R.; Jahn Kassim, P. 2011. Objectives, success and failure factors of housing public–private partnerships in Malaysia, Habitat International 35: 150–157. http://dx.doi.org/10.1016Zj.habitatint.2010.06.005
- Abednego, M. P.; Ogunlana, S. O. 2006. Good project governance for proper risk allocation in public-private partnerships in Indonesia, International Journal of Project Management 24: 622–634. http://dx.doi.org/10.1016/j.ijproman.2006.07.010
- Abrahamson, M. 1973. Contractual risks in tunnelling: how they should be shared, Tunnels and Tunnelling November: 587–598.
- Agha, S. R.; Jarbo, M. H.; Matr, S. J. 2013. A multicriteria multi-stakeholder industrial projects prioritization in Gaza Strip, Arabian Journal for Science and Engineering 38(5): 1217–1227. http://dx.doi.org/10.1007/s13369-012-0346-7
- Akintoye, A.; Main, J. 2007. Collaborative relationships in construction: the UK contractors’ perception, Engineering, Construction and Architectural Management 14(6): 597–617. http://dx.doi.org/10.1108/09699980710829049
- Al-Azemi, K. F.; Bhamra, R.; Salman, A. F. M. 2014. Risk management framework for build, operate and transfer (BOT) projects in Kuwait, Journal of Civil Engineering and Management 20(3): 415–433. http://dx.doi.org/10.3846/13923730.2013.802706
- Alireza, V.; Mohammadreza, Y.; Zin, R. M.; Yahaya, N.; Noor, N. M. 2013. An enhanced multi-objective optimization approach for risk allocation in public-private partnership projects: a case study of Malaysia, Canadian Journal of Civil Engineering 41: 164–177. http://dx.doi.org/10.1139/cjce-2013-0342
- Al-Tmeemy, S. M. H.; Rahman, H. A.; Harun, Z. 2012. Contractors perception of the use of costs of quality system in Malaysian building construction projects, International Journal of Project Management 30(7): 827–838. http://dx.doi.org/10.1016d.ijproman.2011.12.001
- Andi. 2006. The importance and allocation of risks in Indonesian construction projects, Construction Management and Economics 24(1): 69–80. http://dx.doi.org/10.1080/01446190500310338
- Ayag, Z.; Özdemir, R. 2007. An intelligent approach to ERP software selection through fuzzy ANP, International Journal of Production Research 45: 2169–2194. http://dx.doi.org/10.1080/00207540600724849
- Bing, L.; Akintoye, A.; Edwards, P. J.; Hardcastle, C. 2005. The allocation of risk in PPP/PFI construction projects in the UK, International Journal of Project Management 23: 25–35. http://dx.doi.org/10.1016/j.ijproman.2004.04.006
- Canadian Council for Public-Private Partnership. 2013. About PPP: Definitions.
- Carbonara, N.; Costantino, N.; Gunnigan, L.; Pellegrino, R. 2015. Risk management in motorway PPP projects: empirical-based guidelines, Transport Reviews 35(2): 162–182. http://dx.doi.org/10.1080/01441647.2015.1012696
- Carbonara, N.; Costantino, N.; Pellegrino, R. 2014. Concession period for PPPs: a win-win model for a fair risk sharing, International Journal of Project Management 32(7): 1223–1232. http://dx.doi.org/10.1016/j.ijproman.2014.01.007
- Chan, A. P.; Yeung, J. F.; Yu, C. C.; Wang, S. Q.; Ke, Y. 2010. Empirical study of risk assessment and allocation of public-private partnership projects in China, Journal of Management in Engineering 27(3): 136–148. http://dx.doi.org/10.1061/(ASCE)ME.19435479.0000049
- Chan, F. T.; Kumar, N.; Tiwari, M.; Lau, H.; Choy, K. 2008. Global supplier selection: a fuzzy-AHP approach, International Journal of Production Research 46: 3825–3857. http://dx.doi.org/10.1080/00207540600787200
- Chang, D.-Y. 1996. Applications of the extent analysis method on fuzzy AHP, European Journal of Operational Research 95: 649–655. http://dx.doi.org/10.1016/0377-2217(95)00300-2
- Chen, Z. 2010. A cybernetic model for analytic network process, International Conference on Machine Learning and Cybernetics (ICMLC 2010) 4: 1914–1919. doi: 10.1109/ICMLC.2010.5580528
- Cheng, J.-H.; Tang, C.-H. 2009. An application of fuzzy Delphi and fuzzy AHP for multi-criteria evaluation on bicycle industry supply chains, WSEAS Transactions on Systems and Control 4: 21–34.
- CII. 2006. Equitable risk allocation, in CII Research summary 210-1. Construction Industry Institute, Cockrell School of Engineering, University of Texas at Austin.
- Doloi, H. 2012. Understanding impacts of time and cost related construction risks on operational performance of PPP projects, International Journal of Strategic Property Management 16(3): 316–337. http://dx.doi.org/10.3846/1648715X.2012.688774
- El-Sayegh, S. M. 2008. Risk assessment and allocation in the UAE construction industry, International Journal of Project Management 26: 431–438. http://dx.doi.org/10.1016/j.ijproman.2007.07.004
- Ghorbani, A.; Ravanshadnia, M.; Nobakht, M. B. 2014. A survey of risks in public private partnership highway projects in Iran, in Proceedings of the 201 4 International Conference on Construction and Real Estate Management (ICCREM 2014), 27-28 September 2014, Kunming, China, 482–492. http://dx.doi.org/10.1061/9780784413777.058
- Grimsey, D.; Lewis, M. K. 2002. Evaluating the risks of public private partnerships for infrastructure projects, International Journal of Project Management 20(2): 107–118. http://dx.doi.org/10.1016/S02637863(00)00040-5
- Heravi, G.; Hajihosseini, Z. 2011. Risk allocation in public-private partnership infrastructure projects in developing countries: case study of the Tehran-Chalus Toll road, Journal of Infrastructure Systems 18: 210–217. http://dx.doi.org/10.1061/(ASCE)IS.1943555X.0000090
- Hwang, B.-G.; Zhao, X.; Gay, M. J. S. 2013. Public private partnership projects in Singapore: factors, critical risks and preferred risk allocation from the perspective of contractors, International Journal of Project Management 31(3): 424–433. http://dx.doi.org/10.1016/j.ijproman.2012.08.003
- Iqbal, S.; Choudhry, R. M.; Holschemacher, K.; Ali, A.; Tamosaitiene, J. 2015. Risk management in construction projects, Technological and Economic Development of Economy 21(1): 65–78. http://dx.doi.org/10.3846/20294913.2014.994582
- Jin, X. H.; Doloi, H. 2008. Interpreting risk allocation mechanism in public-private partnership projects: an empirical study in a transaction cost economics perspective, Construction Management and Economics 26: 707–721. http://dx.doi.org/10.1080/01446190801998682
- Jin, X.-H.; Zhang, G. 2011. Modelling optimal risk allocation in PPP projects using artificial neural networks, International Journal of Project Management 29(5): 591–603. http://dx.doi.org/10.1016/jijproman.2010.07.011
- Kangari, R. 1995. Risk management perceptions and trends of US construction, Journal of Construction Engineering and Management 121: 422–429. http://dx.doi.org/10.1061/(ASCE)07339364(1995)121:4(422)
- Karim, N. A. A. 2011. Risk allocation in public private partnership (PPP) project: a review on risk factors, International Journal of Sustainable Construction Engineering and Technology 2(2): 62–80.
- Kartam, N. A.; Kartam, S. A. 2001. Risk and its management in the Kuwaiti construction industry: a contractors perspective, International Journal of Project Management 19: 325–335. http://dx.doi.org/10.1016/S0263-7863(00)00014-4
- Ke, Y.; Wang, S. Q.; Chan, A. P. 2012. Risk management practice in China s Public-Private Partnership projects, Journal of Civil Engineering and Management 18(5): 675–684. http://dx.doi.org/10.3846/13923730.2012.723380
- Ke, Y.; Wang, S.; Chan, A. P. 2013. Risk misallocation in public–private partnership projects in China, International Public Management Journal 16: 438–460. http://dx.doi.org/10.1080/10967494.2013.825508
- Ke, Y.; Wang, S.; Chan, A. P.; Lam, P. T. 2010. Preferred risk allocation in China s public-private partnership (PPP) projects, International Journal of Project Management 28: 482–492. http://dx.doi.org/10.1016Zj.ijproman.2009.08.007
- Khazaeni, G.; Khanzadi, M.; Afshar, A. 2012a. Fuzzy adaptive decision making model for selection balanced risk allocation, International Journal of Project Management 30: 511–522. http://dx.doi.org/10.1016/j.ijproman.2011.10.003
- Khazaeni, G.; Khanzadi, M.; Afshar, A. 2012b. Optimum risk allocation model for construction contracts: fuzzy TOPSIS approach, Canadian Journal of Civil Engineering 39(7): 789–800. http://dx.doi.org/10.1139/l2012-038
- Kothari, C. 2004. Research methodology: methods and techniques. New Age International.
- Kumaraswamy, M. 1997. Common categories and causes of construction claims, Construction Law Journal 13: 21–34.
- Lam, K. C.; Wang, D.; Lee, P. T.; Tsang, Y. T. 2007. Modelling risk allocation decision in construction contracts, International Journal of Project Management 25: 485–493. http://dx.doi.org/10.1016/jijproman.2006.11.005
- Liu, T.; Wilkinson, S. 2014. Large-scale public venue development and the application of Public–Private Partnerships (PPPs), International Journal of Project Management 32(1): 88–100. http://dx.doi.org/10.1016/jijproman.2013.01.003
- Loosemore, M.; McCarthy, C. 2008. Perceptions of contractual risk allocation in construction supply chains, Journal of Professional Issues in Engineering Education and Practice 134(1): 95–105. http://dx.doi.org/10.1061/(ASCE)1052–3928(2008)134:1(95)
- Medda, F. 2007. A game theory approach for the allocation of risks in transport public private partnerships, International Journal of Project Management 25: 213–218. http://dx.doi.org/10.1016/jijproman.2006.06.003
- Ng, A.; Loosemore, M. 2007. Risk allocation in the private provision of public infrastructure, International Journal of Project Management 25: 66–76. http://dx.doi.org/10.1016/jijproman.2006.06.005
- Rabbani, A.; Zamani, M.; Yazdani-Chamzini, A.; Zavadskas, E. K. 2014. Proposing a new integrated model based on sustainability balanced scorecard (SBSC) and MCDM approaches by using linguistic variables for the performance evaluation of oil producing companies, Expert Systems with Applications 41: 7316–7327. http://dx.doi.org/10.1016/j.eswa.2014.05.023
- Roumboutsos, A.; Anagnostopoulos, K. P. 2008. Public private partnership projects in Greece: risk ranking and preferred risk allocation, Construction Management and Economics 26: 751–763. http://dx.doi.org/10.1080/01446190802140086
- Rudzianskaite-Kvaraciejiene, R.; Apanaviciene, R.; Gelzinis, A. 2015. Modelling the effectiveness of PPP road infrastructure projects by applying random forests, Journal of Civil Engineering and Management 21(3): 290–299. http://dx.doi.org/10.3846/13923730.2014.971129
- Saaty, T. L.; Vargas, L. G. 2006. Decision making with the analytic network process: economic, political, social and technological applications with benefits, opportunities, costs and risks. Springer.
- The World Bank and the Private Participation in Infrastructure database. [online] 2015. Available at: http://ppi.worldbank.org/explore/Report.aspx
- Thomas, A.; Kalidindi, S. N.; Ananthanarayanan, K. 2003. Risk perception analysis of BOT road project participants in India, Construction Management and Economics 21: 393–407. http://dx.doi.org/10.1080/0144619032000064127
- Triantaphyllou, E.; Shu, B.; Sanchez, S. N.; Ray, T. 1998. Multi-criteria decision making: an operations research approach, Encyclopedia of Electrical and Electronics Engineering 15: 175–186.
- Tserng, H. P.; Ho, S.-P.; Chou, J.-S.; Lin, C. 2014. Proactive measures of governmental debt guarantees to facilitate public-private partnerships project, Journal of Civil Engineering and Management 20(4): 548–560. http://dx.doi.org/10.3846/13923730.2013.801883
- Valipour, A.; Moharnrnadi, F.; Yahaya, N.; Sarvari, H.; Noor, N. M. 2014. Malaysian public private partnership project case study, Journal of Applied Sciences 14: 2023–2031. http://dx.doi.org/10.3923/jas.2014.2023.2031
- Wang, M.-T.; Chou, H.-Y. 2003. Risk allocation and risk handling of highway projects in Taiwan, Journal of Management in Engineering 19(2): 60–68. http://dx.doi.org/10.1061/(ASCE)0742-597X(2003)19:2(60)
- Wu, C.-R.; Chang, C.-W; Lin, H.-L. 2008. A fuzzy ANP based approach to evaluate medical organizational performance, International Journal of Information and Management Sciences 19: 53–74.
- Xu, Y.; Chan, A. P.; Yeung, J. F. 2010. Developing a fuzzy risk allocation model for PPP projects in China, Journal of Construction Engineering and Management 136: 894–903. http://dx.doi.org/10.1061/(ASCE)C0.1943-7862.0000189
- Xu, Y.; Lu, Y.; Chan, A. P. C.; Skibniewski, M. J.; Yeung, J. F. Y. 2012. A computerized risk evaluation model for public-private partnership (PPP) projects and its application, International Journal of Strategic Property Management 16(3): 277–297. http://dx.doi.org/10.3846/1648715X.2012.686928
- Xu, Y.; Yang, Y.; Chan, A. P. C.; Yeung, J. F. Y.; Cheng, H. 2011. Identification and allocation of risks associated with PPP water projects in China, International Journal of Strategic Property Management 15(3): 275–294. http://dx.doi.org/10.3846/1648715X.2011.617867
- Xu, Y.; Yeung, J. F. Y.; Jiang, S. 2014. Determining appropriate government guarantees for concession contract: lessons learned from 1 0 PPP projects in China, International Journal of Strategic Property Management 18(4): 356–367. http://dx.doi.org/10.3846/1648715X.2014.971088
- Yazdani-Chamzini, A. 2014. Proposing a new methodology based on fuzzy logic for tunnelling risk assessment, Journal of Civil Engineering and Management 20(1): 82–94. http://dx.doi.org/10.3846/13923730.2013.843583
- Yeung, J. F.; Chan, A. P.; Chan, D. W.; Li, L. K. 2007. Development of a partnering performance index (PPI) for construction projects in Hong Kong: a Delphi study, Construction Management and Economics 25(12): 1219–1237. http://dx.doi.org/10.1080/01446190701598673
- Yun, S.; Jung, W.; Han, S. H.; Park, H. 2015. Critical organizational success factors for public private partnership projects - a comparison of solicited and unsolicited proposals, Journal of Civil Engineering and Management 21(2): 131–143. http://dx.doi.org/10.3846/13923730.2013.802715
- Zadeh, L. A. 1976. A fuzzy-algorithmic approach to the definition of complex or imprecise concepts, International Journal of Man-machine Studies 8: 249–291. http://dx.doi.org/10.1016/S0020-7373(76)80001-6
- Zaghloul, R.; Hartman, F. 2003. Construction contracts: the cost of mistrust, International Journal of Project Management 21(6): 419–424. http://dx.doi.org/10.1016/S0263-7863(02)00082-0
- Zhang, X.; Kumaraswamy, M.; Zheng, W.; Palaneeswaran, E. 2002. Concessionaire selection for build-operate-transfer tunnel projects in Hong Kong, Journal of Construction Engineering and Management 128(2): 155–163. http://dx.doi.org/10.1061/(ASCE)0733-9364(2002)128:2(155)