67
Views
18
CrossRef citations to date
0
Altmetric
Original Articles

Production and set-up control of a failure-prone manufacturing system

, &
Pages 1107-1130 | Received 01 Jul 2003, Published online: 21 Oct 2013
 

Abstract

The present paper considers a stochastic optimal control problem for a one-machine two-parts manufacturing system, subject to random breakdowns and repairs. The machine under consideration is not completely flexible and hence requires set-up time and cost in order to switch the production from a part type to another. The objective is to find the production plan and sequence of set-ups that minimize the cost function that penalizes inventory/backlog and set-up costs. A continuous dynamic programming formulation of the problem is presented. A numerical scheme is then adopted to solve the obtained optimality conditions equations. The optimal set-up policy. is shown numerically, to be described by a modified hedging corridor strategy. A complete heuristic policy, based on the determination of the boundaries of the corridors that describe the optimal policy in positive and negative areas of the state variables, is developed. The usefulness of such a policy is iJlustrated through experimentation and sensitivity analysis. Extensions to more complex systems are also discussed.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.