67
Views
18
CrossRef citations to date
0
Altmetric
Original Articles

Production and set-up control of a failure-prone manufacturing system

, &
Pages 1107-1130 | Received 01 Jul 2003, Published online: 21 Oct 2013

References

  • AKELLA, R. and KUMAR, P. R., 1986, Optimal control of production rate in a failure-prone manufacturing system. IEEE Transactions on Automatic Control, AC-31, 116–126.
  • BAI, S. X., BURHANPURWALA, J. H., ELHAFSI, M. and TSAI, Y. K., 1996, Hierarchical production control for a flow shop with dynamic setup changes and random machine breakdowns. Operations Research Spectrum, 18, 81–96.
  • BAI, S. X. and ELHAFSI, M., 1994, Optimal feedback control of a manufacturing system with setup changes. Proceedings of the 4th International Conference on Computer Integrated Manufacturing and Automation Technology, Troy, NY.
  • BAI, S. X. and ELHAFSI, M., 1997, Scheduling of an unreliable manufacturing system with nonresumable setups. Computers and Industrial Engineering, 32, 909–925.
  • BOUKAS, E. K. and HAURIE, A., 1990, Manufacturing flow control and preventive maintenance: a stochastic control approach. IEEE Transactions on Automatic Control, 35, 1024–1031.
  • BOUKAS, E. K. and KENNE, J. P., 1997, Maintenance and production control of manufacturing systems with setups. Lectures in Applied Mathematics (LAM), 33, 55–70.
  • CONNOLLY, S., DALLERY, Y. and GERSHWIN, S. B., 1992, A real time policy for performing setup changes in a manufacturing system. Proceedings of the 31st Conference on Decision and Control, Tucson, AZ.
  • ELHAFSI, M. and BAI, S. X., 1996, Production and setup control in a stochastic manufacturing system. Proceedings of the 5th Industrial Engineering Research Conference, Minneapolis, MN.
  • FENG, Y. and YAN, H., 2000, Optimal production control in a discrete manufacturing system with unreliable machines and random demands. IEEE Transactions on Automatic Control, 45, 2280–2296.
  • GERSHWIN, S. B., 1994, Manufacturing Systems Engineering (Englewood Cliffs: Prentice-Hall).
  • GHARBI, A. and KENNE, J. P., 2000, Production and preventive maintenance rates control for a manufacturing system: an experimental design approach. International Journal of Production Economics, 65, 275–287.
  • Hu, J. and CARAMANIS, M., 1995, Dynamic setup scheduling of flexible manufacturing systems: design and stability of near-optimal general round robin policies. In P. R. Kumar and P. P. Varaiya (eds), Discrete Event Systems, Manufacturing Systems. and Communication Networks (New York: Springer), pp. 73–104.
  • KENNE, J. P. and GHARBI, A., 1999, Experimental design in production and maintenance control problem of a single machine, single product manufacturing system. International Journal of Production Research, 37, 621–637.
  • KENNE, J. P. and GHARBI, A., 2001, A simulation optimization approach in production planning of failure prone manufacturing systems. Journal of Intelligent Manufacturing, 12, 421–431.
  • KIMEMIA, J. G. and GERSHWIN, S. B., 1983, An algorithm for the computer control production in flexible manufacturing systems. IEEE Transactions, AC–15, 353–362.
  • KUSHNER, H. J. and DUPUIS, P. G., 1992, Numerical Methods. for Stochastic Control Problems in Continuous Time (New York: Springer).
  • LIBEROPOULOS, G. and CARAMANIS, M., 1997, Numerical investigation of optimal policies for production flow control and set-up scheduling: lessons from two-part-type failure-prone FMSs. International Journal of Production Research, 35, 2109–2133.
  • MONTGOMERY, D. C., 2001, Design and Analysis of Experiments, 5th edn (Chichester: Wiley).
  • SETHI, S. P. and ZHANG, Q., 1994, Hierarchical Decision Making in Stochastic Manufacturing Systems (Boston: Birkhauser).
  • SHARIFNIA, A., CARAMANIS, M. and GERSHWIN, S. B., 1991, Dynamic setup scheduling and flow control in manufacturing systems. Journal of Discrete Event Dynamic systems, 1, 149–175.
  • YAN, H. and ZHANG, Q., 1995. A numerical method in optimal production and setup scheduling of stochastic manufacturing systems: summary of results. Proceedings of the 34th Conference on Decision and Control, New Orleans, LA.
  • YAN, H. and ZHANG. Q., 1997, A numerical method in optimal production and setup scheduling of stochastic manufacturing systems. IEEE Transactions on Automatic control, 42, 1452–1455.
  • YANG, J., YAN, H. and T AKSAR, M. I., 2000, Optimal production and setup scheduling: a one machine, two product system. Annals of operations research. 98, 291–311.
  • YONGHUA, L., 1996, A note on the corridor policy for setup scheduling of manufacturing systems. Proceedings of the 1996 IEEE International Symposium on Intelligent Control, Dearborn, MI.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.