430
Views
16
CrossRef citations to date
0
Altmetric
Articles

From product documentation to a ‘method prototype’ and standard times: a new technique for complex manual assembly

, &
Pages 507-520 | Received 11 Apr 2013, Accepted 12 Aug 2013, Published online: 06 Sep 2013
 

Abstract

This paper suggests a new technique to facilitate consistent transition between planning and production stages of small lots of complex products (in quantities that do not justify full automation). Despite the usage of modern approaches such as design for assembly and design for manufacturing the typical product planning ends up before production planning begins, instead of having a unified seamless planning process. This paper presents a new three stage technique to fill the gap between product planning and production. The paper shows how to generate a rigorous production plan by: (1) extending the Bill-of-Materials to include additional required information, (2) constructing an assembly ‘method prototype’ and (3) using the ‘method prototype’ to calculate time standards for executing the assembly. A case study illustrates the proposed technique.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.