430
Views
16
CrossRef citations to date
0
Altmetric
Articles

From product documentation to a ‘method prototype’ and standard times: a new technique for complex manual assembly

, &
Pages 507-520 | Received 11 Apr 2013, Accepted 12 Aug 2013, Published online: 06 Sep 2013

References

  • Agrawala, M., D. Phan, J. Heiser, J. Haymaker, J. Klingner, P. Hanrahan, and B. Tversky. 2003. “Designing Effective Step-by-step Assembly Instructions.” Proceedings of Siggraph 2003, ACM Transactions on Graphics, 828–837.
  • Carter, P. W. 1990. “Estimating Cycle Time in Design for Robotic Assembly.” Journal of Manufacturing Systems 9(1): 1–12.
  • Cohen, Y., B. Bidanda, and R. E. Billo. 1998. “Accelerating the Generation of Work Measurement Standards through Automatic Speech Recognition: A Laboratory Study.” International Journal of Production Research 36: 2701–2715.
  • Du, J., Y. Y. Jiao, and J. Jiao. 2005. “Integrated BOM and Routing Generator for Variety Synchronization in Assembly-to-Order Production.” Journal of Manufacturing Technology Management 16(2): 233–243.
  • Elnekave, M., and I. Gilad. 2006. “Rapid Video-based Analysis System for Advanced Work Measurement.” International Journal of Production Research 44(2): 271–290.
  • Eryuruk, S. H., F. Kalaoglu, and M. Baskak. 2008. “Assembly Line Balancing in a Clothing Company.” Fibres & Textiles in Eastern Europe 16(1): 93–98.
  • Gunasekaran, A. 1999. “Agile Manufacturing: A Framework for Research and Development.” International Journal of Production Economics 62: 87–105.
  • Heiser, J., D. Phan, M. Agrawala, B. Tversky, and P. Hanrahan. 2004. “Identification and Validation of Cognitive Design Principles for Automated Generation of Assembly Instructions.” Proceedings of Advanced Visual, Interfaces, 311–319.
  • Jiao, J., and M. M. Tseng. 1999. “A Pragmatic Approach to Product Costing Based on Standard Time Estimation.” International Journal of Operations & Production Management (IJOPM) 19(7): 738–755.
  • Kim, Y. K., W. S. Song, and J. H. Kim. 2009. “A Mathematical Model and a Genetic Algorithm for Two-sided Assembly Line Balancing.” Computers & Operations Research 36: 853–865.
  • Kovacs, Z., and J. M. Le Goff. 1998. “Support for Product Data from Design to Production.” Computer Integrated Manufacturing Systems 11(4): 285–290.
  • Laurig, W., F. M. Kuhn, and K. C. Schoo. 1985. “An Approach to Assessing Motor Workload in Assembly Tasks by the Use of Predetermined-Motion-Time Systems.” Applied Ergonomics 16(2): 119–125.
  • Madan, M., T. Bramorski, and R. P. Sundarraj. 1995. “The Effects of Grouping Parts of Ready-to-Assemble Products on Assembly Time: An Experimental Study.” International Journal of Operations and Production Management 15: 39–49.
  • Min, L., B. Li, and Z. Shensheng. 2004. “Modeling Integrated CAPP/PPS Systems.” Computers & Industrial Engineering 46: 275–283.
  • Mok, S. M., K. Ong, and C. H. Wu. 2001. “Automatic Generation of Assembly Instructions Using STEP.” Proceedings of IEEE International Conference on Robotics and Automation (ICRA 2001) 1: 313–318.
  • Nakayama, S., K. Nakayama, and H. Nakayama. 2002. “A Study on Setting Standard Time Using Work Achievement Quotient.” International Journal of Production Research 15: 3945–3953.
  • Niebel, B. W., and A. Freivalds. 2009. Niebel’s Methods, Standards, and Work Design. 12th ed. Boston, MA: McGraw-Hill.
  • Pires, L. C. M., J. Carvalho, and N. A. Moreira. 2008. “The Role of Bill of Materials and Movements (BOMM) in Virtual Enterprise Environment.” International Journal of Production Research 46(4): 1163–1185.
  • Prabhu, G. V., M. G. Helander, and V. L. Shalin. 1995. “Effect of Product Structure on Manual Assembly Performance.” International Journal of Human Factors in Manufacturing 5: 149–161.
  • Richardson, M., G. Jones, and M. Torrance. 2004. “Identifying the Task Variables That Influence Perceived Object Assembly Complexity.” Ergonomics 47(9): 945–964.
  • Rychtyckyj, N. 2005. “Ergonomics Analysis for Vehicle Assembly Using Artificial Intelligence.” AI Magazine 26(3): 41–50.
  • Sanders, M. S., and E. McCormick. 1993. Human Factors in Engineering and Design. 7th ed. Boston, MA: McGraw-Hill.
  • Stavros, A., F. Michahelles, and B. Schiele. 2002. “Proactive Instructions for Furniture Assembly.” Proceedings of the 4th International Conference on Ubiquitous, Computing, Göteborg, 351–360.
  • Stork, S., C. Stößel, and A. Schubö. 2008. “The Influence of Instruction Mode on Reaching Movements During Manual Assembly.” In HCI for Usability and Work, Lecture Notes in Computer Science, Vol. 5298, 161–172. Berlin: Springer-Verlag.
  • Tatsiopoulos, I. P. 1996. “On the Unification of Bills of Materials and Routings.” Computers in Industry 31(3): 293–301.
  • Tseng, H. E., M. H. Chen, C. C. Chang, and W. P. Wang. 2008. “Hybrid Evolutionary Multi-objective Algorithms for Integrating Assembly Sequence Planning and Assembly Line Balancing.” International Journal of Production Research 46(21): 5951–5977.
  • Ulrich, K., D. Sartorius, S. Pearson, and M. Jakiela. 1993. “Including the Value of Time in Design-for-Manufacturing Decision Making.” Management Science 39(4): 429–447.
  • Wang, Y., and J. H. Liu. 2010. “Chaotic Particle Swarm Optimisation for Assembly Sequence Planning.” Robotics and Computer-Integrated Manufacturing 26(2): 212–222.
  • Watson, G., J. Butterfield, R. Curran, and C. Craig. 2010. “Do Dynamic Work Instructions Provide an Advantage over Static Instructions in a Small Scale Assembly Task?” Learning and Instruction 20: 84–93.
  • Zandin, K. 2003. MOST Work Measurement Systems. 3rd ed. New York: Marcel Dekker Monticello.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.