A genetic algorithm-based optimal resource-constrained scheduling simulation model

Pages 131-141 | Published online: 21 Oct 2010
 

Abstract

Resources for construction activities are limited in the real construction world so that scheduling must include resource allocation. Furthermore, activity duration is uncertain due to the variation in the outside environment, such as resource availabilities, weather, space congestion, etc. A new optimal resource-constrained construction scheduling simulation model is proposed in this paper, in which the effects of both uncertain activity duration and resource constraints are taken into account. Probability distribution is used to model the uncertainties of activity duration. An optimal schedule simulation model is then established in which a genetic algorithm-based search technique is adopted to search for the probabilistic optimal project duration under resource constraints. The model can effectively provide the optimal averaged project duration, cumulative project completion probabilities and the impact of influence factors on the probabilistic resource-constrained scheduling problem.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.