A genetic algorithm-based optimal resource-constrained scheduling simulation model

Pages 131-141 | Published online: 21 Oct 2010

References

  • Ahuja , H. M. and Arunnachalam , V. 1984 . Risk evaluation in resource allocation . Journal of Construction Engineering and Management ASCE , 110 ( 4 ) : 324 – 336 .
  • Ahuja , H. N. and Nandakumar , V. 1985 . Simulation model to forecast project completion time . Journal of Construction Engineering and Management ASCE , 111 ( 4 ) : 325 – 342 .
  • Ayyub , B. M. and Haldar , A. 1984 . Project scheduling using fuzzy set concepts . Journal of Construction Engineering and Management ASCE , 110 : 189 – 203 .
  • Badiru , A. B. 1991 . Stare 2.0: An improved PERT network simulation tool . Journal of Computers and Industrial Engineering , 20 ( 3 ) : 389 – 400 .
  • Boctor , F. F. 1990 . Some efficient multi-heuristic procedures for resource-constrained project scheduling . European Journal of Operational Research , 49 : 3 – 13 .
  • Carr , R. I. 1979 . Simulation of construction project duration . Journal of the Construction Division ASCE , 105 ( 2 ) : 117 – 128 .
  • Chanas , S. and Kamburowski , J. 1981 . The use of fuzzy variables in PERT . Fuzzy Sets and Systems , 5 : 11 – 19 .
  • David , E. W. 1973 . Project scheduling under resource constraints: historical review and categorization of procedures . AIIE Transactions , 5 ( 4 ) : 297 – 312 .
  • David , E. W. and Patterson , J. H. 1975 . A comparison of heuristic and optimum solutions in resource-constrained project scheduling . Management Science , 21 : 944 – 955 .
  • Diaz , C. F. and Hadipriono , F. C. 1993 . Nondeterministic networking methods . Journal of Construction Engineering and Management ASCE , 119 ( 1 ) : 40 – 57 .
  • Elmaghraby , S. E. 1977 . Activity Networks , New York : Wiley .
  • Elsayed , E. A. 1982 . Algorithms for project scheduling with resource constraints . International Journal of Production Research , 20 : 95 – 103 .
  • Fei , C. Y. 1997 . Stochastic simulation optimization using genetic algorithms , University of Pittsburgh . Ph.D. thesis
  • Femandez , A. A. , Armacost , R. L. and Pet-Edwards , J. J. 1998 . Understanding simulation solutions to resource constrained project scheduling problems with stochastic task durations . Engineering Management Journal , 10 ( 4 ) : 5 – 13 .
  • Gen , M. and Cheng , R. 1997 . Genetic Algorithms and Engineering Design , New York : Wiley .
  • Hadipriono , C. and Sun , K. 1990 . Angular fuzzy set models for linguistic values . Ova Engineering Systems , 7 : 148 – 156 .
  • Hapke , M. and Slowinski , R. 1996 . Fuzzy priority heuristics for project scheduling . Fuzzy Sets and Systems , 83 : 291 – 299 .
  • Johnson , T. J. R. 1967 . An algorithm for the resource-constrained project scheduling problem , MIT . Ph.D. thesis
  • Kavanagh , D. P. 1985 . SIREN: a repetitive construction simulation model . Journal of Construction Engineering and Management ASCE , 111 ( 3 ) : 308 – 323 .
  • Law , A. M. and Kelton , W. D. 1991 . Simulation Modelling and Analysis , 2nd Edn , New York : McGraw-Hill .
  • Lee , Jin-koo . 1992 . Tolerance optimization using genetic algorithm and approximated simulation , University of Michigan . Ph.D. dissertation
  • Leu , Sou-Sen and Yang , Chung-Huei . 1999 . A genetic algorithm based resource-constrained construction scheduling system . Journal of Construction Management and Economics , 17 : 767 – 776 .
  • Leu , Sou-Sen , Chen , An-Ting and Yang , Chung-Huei . 1999 . Fuzzy optimal model for resource-constrained construction scheduling . Journal of Computing in Civil Engineering ASCE , 13 ( 3 ) : 207 – 216 .
  • Leu , Sou-Sen and Hwang , Shao-Ting . 2001 . Optimal repetitive scheduling model with shareable resource constraint . Journal of Construction Engineering and Management ASCE , 127 ( 4 ) : 270 – 820 .
  • Lorterapong , P. 1994 . A fuzzy heuristic method for resource-constrained project scheduling . Project Management Journal , 25 : 12 – 18 .
  • McCahon , C. S. 1993 . Using PERT as an approximation of fuzzy project-network analysis . IEEE Transaction on Engineering Management , 40 ( 2 ) : 146 – 153 .
  • Morse , L. and Whitehouse , G. 1988 . A study of combining heuristics for scheduling projects with limited multiple resources . Computer and Industrial Engineering , 15 ( 1–4 ) : 153 – 161 .
  • Nkasu , M. M. 1991 . Stochastic resources modeling . International Journal of Technology Management , : 342 – 347 .
  • Padilla , E. M. and Can , R. I. 1991 . Resource strategies for dynamic project management . Journal of Construction Engineering and Management ASCE , 117 ( 2 ) : 279 – 293 .
  • Pugh , L. A. and Soden , R. G. 1986 . Use of risk analysis techniques in assessing the confidence of project cost estimates and schedules . International Journal of Project Management , 4 ( 3 ) : 158 – 162 .
  • Ragsdale , C. 1989 . The current state of network simulation in project management theory and practice . International Journal of Project Management , 17 ( 1 ) : 21 – 25 .
  • Sawhney , A. and AbouRizk , S. M. 1995 . HSM-simulationbased planning method for construction projects . Journal of Construction Engineering and Management ASCE , 121 ( 3 ) : 297 – 303 .
  • Stinson , J. P. 1976 . A branch and bound algorithm for a general class resource-constrained scheduling problem , University of North Carolina at Chapel Hill . Ph.D. thesis
  • Talbot , F. B. 1982 . Resource-constrained project scheduling with time-resource tradeoffs: the nonpreemptive case . Management Science , 28 : 1197 – 1210 .
  • Tsai , D. M. and Chiu , H. N. 1996 . Two heuristics for scheduling multiple projects with resource constraints . Construction Management and Economics , 14 : 325 – 340 .
  • Wang , K. H. , Chi , J. H. and Wan , E. H. 1993 . Decision making of project under fuzzy information . Journal of the Chinese Institute of Engineers , 16 : 533 – 541 .
  • Whitehouse , G. E. and Brown , J. R. 1979 . GENRES: an extension of brooks algorithm for project scheduling with resource constraints . Computer and Industrial Engineering , 3 : 261 – 268 .
  • Wu , R. W. K. and Hadipriono , F. C. 1994 . Fuzzy modus ponens deduction technique for construction scheduling . Journal of Construction Engineering and Management ASCE , 120 : 162 – 179 .

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.