The efficient scheduling of resources in engineering construction projects: reflections on a case study from Iran

&
Pages 687-695 | Received 07 Nov 2011, Accepted 17 Jun 2012, Published online: 08 Aug 2012
 

Abstract

A particular problem for productivity in engineering construction projects is poor front-end planning, in particular, the lack of attention to resource-loaded schedules. In such projects, resources are highly specific and constrained, resulting in conflicts that can compromise planned durations and add cost. There are many techniques available for mitigating these conflicts. These have been extensively reported and compared in the literature and some have been adopted into commercially available computerized scheduling packages that are used by most major contractors. Project managers normally have access only to the techniques offered by the software that their organizations happen to use. In the reported case, a heuristic algorithm developed by academics was implemented and tested against a well-known standard software scheduling tool on the construction of a combined-cycle power plant in Iran. When results were compared, the performance of the manually applied algorithm was found to be superior in its ability to provide acceptable time–cost trade-offs. The underlying argument is twofold. First, that deficiencies in planning (particularly the reconciliation of resource constraints with completion targets) are responsible for poor productivity in engineering construction projects. Second, as improved techniques for optimizing ‘resource-loaded’ schedules are continually being sought and devised, they should be made available to project managers; and the best way for this to happen is for them to be incorporated into commercially available project management software.

Acknowledgements

The authors would like to acknowledge the efforts and contribution to the data collection of Eng. Davood Fazel of Iran Power Plant Project Management, Tehran, Iran, and to the early development of LINRES by M. Chelaka L. Abeyasinghe, formerly of the Department of the Built Environment, University of Northumbria at Newcastle.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.