707
Views
1
CrossRef citations to date
0
Altmetric
Articles

The efficient scheduling of resources in engineering construction projects: reflections on a case study from Iran

&
Pages 687-695 | Received 07 Nov 2011, Accepted 17 Jun 2012, Published online: 08 Aug 2012

References

  • Abeyasinghe , C. , Greenwood , D.J. and Johansen , D.E. 2001 . An efficient method for scheduling construction projects with resource constraints . International Journal of Project Management , 19 : 29 – 45 .
  • Achieving Competitiveness Through Innovation and Value Enhancement . 1996 . ACTIVE Engineering Construction Initiative: The Action Plan , London : ACTIVE .
  • Brucker , P. , Knust , S. , Schoo , A. and Thiele , O. 1998 . A branch and bound algorithm for the resource-constrained project scheduling problem . European Journal of Operational Research , 107 : 272 – 288 .
  • Egan, J. (1998) Rethinking Construction, Construction Task Force Report for Department of the Environment, Transport and the Regions, HMSO, London.
  • Gibson, M. (2009) Changing to Compete: A Review of Productivity and Skills in UK Engineering Construction, Report submitted to the Secretary of State for Business, Innovation and Skills, available at http://www.bis.gov.uk/files/file53814.pdf (accessed 2 November 2011).
  • Goldratt , E.M. 1997 . Critical Chain , Great Barrington , MA : The North River Press .
  • Gordon , J. and Tulip , A. 1997 . Resource scheduling . International Journal of Project Management , 15 ( 6 ) : 359 – 370 .
  • Harris, R.B. and Ioannou, P.G. (1998) Scheduling projects with repeating activities. Journal of Construction Engineering and Management, 124(4), 269–78.
  • Hartmann , S. 1998 . A competitive genetic algorithm for resource-constrained project scheduling . Naval Research Logistics , 45 : 733 – 750 .
  • Hassan , T.M. and McCaffer , R. 2002 . Vision of the large scale engineering construction industry in Europe . Automation in Construction , 11 : 421 – 437 .
  • Herroelen , W. and Leus , R. 2001 . On the merits and pitfalls of critical chain scheduling . Journal of Operations Management , 19 : 559 – 577 .
  • Johansen, D.E. (1996) Hard or soft? Planning on medium size construction projects, in Stephenson, P. (ed.) Proceedings of the 12th Annual Conference of the Association of Researchers in Construction Management, Sheffield Hallam University, 11–13 September, pp. 73–82.
  • Kolisch , R. 1999 . Resource allocation capabilities of commercial project management software packages . Interfaces , 29 ( 4 ) : 19 – 31 .
  • Kolisch, R. and Hartmann, S. (1999) Heuristic algorithms for the resource-constrained project scheduling problem: classification and computational analysis, in Weglarz, J. (ed.) Project Scheduling: Recent Models, Algorithms and Applications, Kluwer International, Norwell, MA, pp. 147–78.
  • Latham, M. (1994) Constructing the Team, Final Report of the Government/Industry Review of Procurement and Contractual Arrangements in the UK Construction Industry, HMSO, London.
  • Liberatore, M.J., Pollack-Johnson, B. and Smith, C.A. (2001) Project management in construction: software use and research directions. Journal of Construction Engineering and Management, 127(2), 101–7.
  • Mawdesley, M., Askew, W. and O’Reilly, M. (1997) Planning and Controlling Construction Projects: The Best-Laid Plans, Addison-Wesley Longman, Harlow.
  • Merrow, E.W., Sonnhalter, K.A., Somanchi, R. and Griffith, A.F. (2009) Productivity in the UK Engineering Construction Industry, Report prepared for the Department for Business, Innovation and Skills on behalf of Independent Project Analysis Inc., available at http://www.bis.gov.uk/search?keywords=Productivity+in+the+UK+Engineering+Construction+Industry&type=all (accessed 2 November 2011).
  • Nkasu , M.M. 1994 . COMSARS: a computer-sequencing approach to multi-resource-constrained scheduling . International Journal of Project Management , 12 ( 3 ) : 183 – 192 .
  • UK Offshore Operators Association . 1994 . Cost Reduction: Initiative for the New Era , London : Institute of Petroleum .
  • Woodworth , B.M. and Shanahan , S. 1998 . Identifying the critical sequence in a resource-constrained project . International Journal of Project Management , 6 ( 2 ) : 89 – 96 .

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.