276
Views
2
CrossRef citations to date
0
Altmetric
Research Articles

The impact of the change in institutional regulation on construction productivity: firm-level evidence in a developing economy

ORCID Icon, ORCID Icon, ORCID Icon, ORCID Icon, ORCID Icon, ORCID Icon & ORCID Icon show all
Pages 199-214 | Received 16 Oct 2022, Accepted 14 Jun 2023, Published online: 29 Jun 2023
 

Abstract

For many, the business environment is regarded as the main factor determining changes in construction productivity. However, changes in a country’s institutional regulation can contribute to the productivity changes of construction firms over the long term but are often overlooked in construction productivity research. To study the impact of institutional regulation on construction productivity, a sample of 55 public-listed construction Malaysian firms (2009–2020) is used as a case study to estimate total factor productivity (TFP) based on the Geometric-Young Index (GYI). Stochastic Frontier Analysis (SFA) is then used to decompose the TFP-GYI into the technological, environment, technical, scale-mix, and statistical noise components. This is followed by the Generalized Method Moments (GMM) to model the impact of different institutional regulations on TFP and decomposed productivity components. The results indicate that the institutional regulation framework influences construction firms’ TFP. Property rights and the rule of law (PRRL), and budget balance and change in wages (BBCW) have a positive impact on TFP, which largely influences technical efficiency. In addition to uncovering the impact of institutional regulation on construction productivity, namely capital availability and regulatory environment, it is concluded that institutional regulation plays a vital role in determining long-term construction firm productivity and needs to be considered by policymakers in formulating supporting incentives and policies.

Acknowledgments

The authors thank the anonymous reviewers for their comments on the manuscript.

Disclosure statement

No potential conflict of interest was reported by the author(s).

Data availability statement

The data that support the findings of this study are available from the corresponding author, upon reasonable request.

Additional information

Funding

This work was supported by the MyRA Research Grant [600-RMC/GPM ST 5/3 (045/2021)], Universiti Teknologi MARA, Malaysia.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.