64,810
Views
10
CrossRef citations to date
0
Altmetric

ABSTRACT

Strategic management (SM) has become prominent on the agenda in several public organizations due to new public management (NPM) reforms. Nevertheless, there are few studies investigating how public organizations apply SM in practice and what tools are used. As a result, calls have been made for such studies. This article can be seen as an attempt to meet this call by presenting a qualitative case study of how SM has been applied in the Swedish Transport Administration (STA), a central government agency in Sweden, and what tools it used in strategy making. By analyzing the micro processes of strategizing at STA, our results indicate that public organizations need to be aware of at least three specific tensions that can enable or constrain strategy making. These tensions are: short v. long-term, parts v. whole, and reactivity v. proactivity.

INTRODUCTION

Strategic management (SM) is now prominent on the agenda in several public organizations, and is reportedly becoming increasingly relevant in practice due to new public management (NPM) changes (Hansen Rosenberg Citation2011; Weiss Citation2016). However, too little is known about the application of SM in practice and its possible consequences (Johnsen Citation2016). There is a small but growing research field (see, e.g., Andrews and Van de Walle Citation2012; Boyone and Walker Citation2010; Elbanna, Rhys, and Pollanen Citation2016; Ferlie and Ongaro Citation2015; George and Desmidt Citation2016; George et al. Citation2016a, Citation2016b; Hansen Rosenberg and Ferlie Citation2014, Citation2016; Johnsen Citation2016; Lane Citation2008; Lane and Wallis Citation2009; Poister Citation2010; Walker et al. Citation2010) that has highlighted the importance of studying strategy and strategic thinking in public organizations for the past decade. Several of these studies investigate the application of SM (see, e.g., Bryson Citation2004; Drumaux and Goethals Citation2007; Ferlie Citation2003; Joyce Citation2000; Johnson and Scholes Citation2001; Koteen Citation1997), but few investigate how public organizations apply SM in practice (Bryson, Berry, and Yang Citation2010) and which tools are used (Hansen Rosenberg Citation2011; Williams and Lewis Citation2008) to realize a strategic intent. That is the focus of this article.

It is not easy to incorporate SM into the public sector (Elbanna, Rhys, and Pollanen Citation2016; Poister Citation2010; Weiss Citation2016), as the private sector theories that influence it are based on growth, profit, and competitive advantages, aspects not always well-suited to the public sector (Ferlie and Ongaro Citation2015; Höglund Citation2015; Lane and Wallis Citation2009). This is despite the last few decades of NPM reforms in the public sector (Ferlie and Ongaro Citation2015; Hansen Rosenberg and Ferlie Citation2016), which introduced private and business-like elements (Ferlie et al. Citation1996). Moreover, prior research (see, e.g., Bevan and Hood Citation2006; Diefenbach Citation2009; Hood and Peters Citation2004; Lapsley Citation2008; Smith Citation1995) noted that NPM generated several unintended consequences, such as (too) strong a focus on internal efficiency at the expense of external efficiency and short-term, output-oriented, and measurable results at the expense of more long-term and outcome-oriented results, consequently hampering the application of SM.

There are different theories in public sector SM (Ferlie and Ongaro Citation2015; Hansen Rosenberg and Ferlie Citation2016). However, so far most researchers have applied the Miles and Snow (Citation1978) typology (e.g., Andrews et al. Citation2008, Citation2009a, Citation2009b) or the Porter (Citation1980, Citation1985) typology and the related model of five forces (Hansen Rosenberg and Ferlie Citation2016; Johansson Citation2009), while others have explored the possibilities of the resource-based view (RBV) (e.g., Bryson, Ackermann, and Eden Citation2007; Hansen Rosenberg and Ferlie Citation2016; Johansson Citation2009). Work has also been done on the processes of strategic planning (see, e.g., Elbanna, Rhys, and Pollanen Citation2016; George and Desmidt Citation2016; George et al. Citation2016a, Citation2016b), as well as applications of actor network theory (Bryson, Cosby, and Bryson Citation2009). Only a few so far have taken an activity-based approach focusing on the micro processes of strategizing (Jarzabkowski and Fenton Citation2006; Jarzabkowski and Sillince Citation2007) and strategy-as-practice (s-as-p) (George and Desmidt Citation2014; Hansen Rosenberg Citation2011; van Wessel, van Buuren, and van Woerkum Citation2011). Even fewer studies address the application of SM in relation to what tools are used in strategy making (Jarzabkowski and Kaplan Citation2015) and so far, to our knowledge, none of them focus on the public sector, except for Hansen Rosenberg (Citation2011) and Williams and Lewis (Citation2008).

In this article, we take on a broad definition of tools by drawing on Jarzabkowski and Kaplan (Citation2015:538), who argue that “the term tool is a generic name for frameworks, concepts, models, or methods.” We will align with the strategizing perspective (e.g., Jarzabkowski and Fenton Citation2006; Lê and Jarzabkowski Citation2015; Spee and Jarzabkowski Citation2011) and focus on the application of SM and which tools (Hansen Rosenberg Citation2011; Jarzabkowski and Sillince Citation2007) are used to realize a strategic intent. In this way, we attempt to further develop our understanding of strategizing in the public sector by addressing the following research questions: How are strategic tools used? How does the use of a tool enable and/or constrain strategy making?

To sum up, we will address the stated research questions by assessing an activity-based approach that focuses on strategy and which tools are used when applying SM in a public-sector context. This is done from a strategizing perspective that highlights the micro processes of strategy and strategy work in public sector organizations, which will be further elaborated on later in this article.

STRATEGY PROCESS AND STRATEGIZING IN THE PUBLIC SECTOR

Strategizing builds on a process view of strategy (Johnson, Melin, and Whittington Citation2003). The seeds of viewing strategy as process can be said to have been planted by Mintzberg (e.g., Mintzberg Citation1994; Mintzberg, Ahlstrand, and Lampel Citation1998; Mintzberg and Waters Citation1985), Pettigrew (Citation1985), and Johnson (Citation1987). This new research area began by focusing on changes in strategic patterns over prolonged periods of time. Ferlie and Ongaro (Citation2015) state that the strategy as process direction clearly sees the public sector and the non-profit context, as well as private firms, as sites of interest. However, as inclusive as this direction of strategy is, most research is still done on private firms (Höglund Citation2015). When applied in a public-sector context, it is common to view the strategy process as a number of organizational activities, some of which run parallel to each other, but most of the time the process is described as sequential and in different stages. In sum, the work of strategy in the public sector mostly addresses the work of strategy by addressing processes of strategic planning, formulation, implementation, evaluation, and monitoring.

For example, Joyce (Citation2004) states that the strategic process of formulation is quite similar to those in the private sector. Hence, managers in the public sector can obtain several benefits from formulating written strategy documents, including vision, goals, and strategic plans (Boyone and Walker Citation2010; Joyce Citation2004; Koteen Citation1997; Poister Citation2010). Thus, strategic planning involves formulating strategies that give a holistic view of the organization by mixing long-term thinking, goal analysis, and subjective evaluation of values, goals, and priorities (Mintzberg, Ahlstrand, and Lampel Citation1998). It offers an opportunity to chart a future direction and actions to ensure the organization’s viability, efficiency, and ability to add public value (Poister Citation2010). Moreover, one of the key aspects of a successful strategy is the implementation process (Joyce Citation2000; Johnson and Scholes Citation2001; Koteen Citation1997; Plant Citation2009; Poister Citation2010; Weiss Citation2016). Some deliberate strategies are implemented as they were intended, while others will be realized in other ways, or not at all (Mintzberg Citation1994). There are also strategies that emerge along the way; i.e., emergent strategies (Mintzberg and Waters Citation1985). When it comes to activities of monitoring and evaluation, they are highlighted as important for the public sector to succeed in strategy work (Plant Citation2009; Poister Citation2010), but so far few studies have been done (Höglund Citation2015). This is despite the fact that an important part of SM in the public sector is reporting on performance through some form of administrated performance information (Weiss Citation2016).

A newer contribution that further develops the process view is strategy-as-practice (s-as-p), a research field that has grown out of a dissatisfaction with conventional strategy research (Johnson, Melin, and Whittington Citation2003). Scholars in this field tend to take a special interest in practice, and are concerned with micro activities in the context of strategy. Whittington (Citation2007:1575) argues that s-as-p’s “fascination with the phenomenon of strategy itself takes it beyond traditional process perspectives.” In this view, strategy could be understood as “something people do rather than something that firms in their markets have” (Jarzabkowski and Seidl Citation2008:1391). With this in mind, Jarzabkowski, Balogun, and Seidl (Citation2007:7–8) define strategy as:

[ … ] a situated, socially accomplished activity, while strategizing comprises those actions, interactions and negotiations of multiple actors and the situated practices that they draw upon in accomplishing that activity.

Mintzberg (Citation1994) defines strategy as something that organizations do (not people, as in s-as-p), and by focusing on the emergence of strategy, he detaches strategy from strategic intent and outcomes. Whittington (Citation2007) argues that this reduces strategy work to controlling the uncontrollable and that strategy practice from this perspective becomes too insignificant for organizational outcomes to be worth the effort of studying. In effect, such a view allows only a narrow range of practitioners to be accounted for. As Jarzabkowski, Balogun, and Seidl (Citation2007:6) conclude, “strategy research seemed to have lost sight of the human being.” In response to this, a more activity-based view of strategy and strategizing has emerged. In this stream of research, in-depth case studies are seen as a necessity in the micro strategy and strategizing perspective (Johnson, Melin, and Whittington Citation2003). It is with this research stream that we align this article.

However, even though previous literature has pointed out the need to understand how everyday activities in organizations create strategic choices and consequences (e.g., Balogun, Jarzabkowski, and Seidl Citation2007; Jarzabkowski Citation2005; Jarzabkowski and Fenton Citation2006; Jarzabkowski and Seidl Citation2008; Johnson, Melin, and Whittington Citation2003; Johnson et al. Citation2007; Spee and Jarzabkowski Citation2011; Whittington Citation2006), few studies have actually attempted it. A review of journal articles shows, for instance, that almost all SM research is still concerned with macro levels of analysis. However, these studies do not provide the detail needed to understand strategizing practices (Jarzabkowski and Kaplan Citation2015). This is also the case for SM in the public sector (Höglund Citation2015). In this article, we take on a micro perspective of strategy and strategizing in line with Jarzabkowski and Fenton (Citation2006:632) and we define strategizing as:

[T]hose planning, resource allocation, monitoring and control practices, and processes through which strategy is enacted.

Thus, studying strategizing means taking an activity-based view of strategy that focuses on the detailed processes and practices constituting the day-to-day activities of organizational life. It is about gaining detailed understanding of the myriad micro activities that make up strategy and strategizing in practice. The activity-based view starts from the proposition that value lies increasingly in the micro activities of managers and others in organizations. “It goes inside organizations, their strategies and their processes, to investigate what is actually done and by whom” and with which tools (Johnson, Melin, and Whittington Citation2003:5). Hence, there are plenty of similarities among our views of strategizing and s-as-p. However, we do not draw upon the sociological eye and practice theories (see, e.g., Jarzabkowski and Seidel Citation2008; Jarzabkowski and Spee Citation2009; Whittington Citation2006). Our focus is rather on the processes of strategizing and the use of strategic tools and how these tools enable and/or constrain strategy making.

METHOD

The Context of Study

The context of study is the Swedish Transport Administration (STA), a central government agency that has been applying ideas of SM since it was founded in 2010 through a merger of the previous transport agencies. The STA has approximately 6,500 employees, and is managed by a director general who is accountable to a governing board. In line with Johnsen (Citation2016), we argue that the Scandinavian countries’ local governments are an interesting context of study regarding the adoption of SM, as these countries have large public sectors and unitary conditions with the opportunity to reform public organizations. Moreover, the Swedish central government is quite unique by international standards because it has a history of devolved responsibility for operational matters handled by central agencies with a considerable degree of autonomy. Ministerial intervention is forbidden by law, which means that the direct political control of agencies is limited. Formal parliamentary and governmental control is mainly carried out through legislation, annual appropriation letters, and the appointment of directors general. Yet, as in many countries, the last few decades have been characterized by performance management reforms in line with NPM aimed at increasing the level of governance and transparency, with a focus on ex-post control and the disclosure of results. At the end of the 1980s, “management-by-objectives” (MBO) was thus introduced as the prevailing philosophy and tool for performance management in the Swedish central government.

As argued, “[t]he term tool is a generic name for frameworks, concepts, models, or methods” (Jarzabkowski and Kaplan Citation2015:538). To gain a deeper knowledge of how tools are used in relation to strategy making, the focus here is on those tools the top management of STA decided should be used to formulate and implement the strategic plan: MBO; Delivery Qualities; the Transport Plan; the Instruction; the Appropriation Letter; the Operational Plan; the Budget; and the Balanced Scorecard.

A Case Study Approach

A single case study approach was selected, as it was recently suggested that a more detailed examination was needed of the dynamic relationship between how the public sector applies SM in practice (Bryson, Berry, and Yang Citation2010) and which tools they use (Hansen Rosenberg Citation2011) to realize a strategic intent. Moreover, adopting an activity-based approach that focuses on the micro processes of strategizing (Jarzabkowski and Fenton Citation2006; Jarzabkowski and Sillince Citation2007) means more detailed reporting of activities. Drawing upon Dyer and Wilkins (Citation1991), we argue that there is less room for detailed reporting in journal articles, which makes it challenging to conduct a multiple-case study without the risk of becoming so general in the reported activities that one loses the micro dynamics.

As mentioned, our knowledge about the application of SM on the micro level in relation to the tools used in strategy making is scarce (Jarzabkowski and Kaplan Citation2015), especially in a public-sector context (Hansen Rosenberg Citation2011). As the STA has applied SM since 2010, and actively worked with formulating and implementing a strategic plan, the agency can provide us with ideas and enhanced information about how SM works in practice, as well as which tools are used in strategy work. One drawback is that a single case study does not provide us with the ability to generalize. Nevertheless, a single case study, well-grounded in previous literature, can help us to make conceptual and theoretical contributions that go beyond the specific case (Siggelkow Citation2007).

We take a longitudinal perspective, as we studied SM at the STA between 2012 and 2016. The case study is particularly suitable in a context of longitudinal research, as it could help us to unravel the underlying dynamics that play out over time insofar as it has the potential to provide details of how these dynamic processes work (Höglund et al. Citation2015; Siggelkow Citation2007). Moreover, process studies seek narrative (Van de Ven Citation2007) and qualitative (Schindehutte and Morris Citation2009) understanding. In other words, we employed a qualitative research method based on an interpretive approach, which is well-suited for acquiring knowledge about human activities (Johnson et al. Citation2007). As such, we have taken a case study approach that focuses on the interpretative aspects of the case (Stake Citation1995) to conceptualize an understanding of the processes of strategizing and addressing gaps in existing theory (cf. Siggelkow Citation2007). In line with this, the empirical data are based on meetings, document studies, interviews, and workshops. We will further elaborate on this in upcoming sections.

Retrospectively, we have studied the STA since its establishment in 2010, and in real time between 2012 and 2016. We had four contact people at the STA, as well as a reference group that we met with twice a year. During these meetings, the authors discussed the results of their analysis of the STA and received a status report on the progression of the agency’s strategy work. Three studies were conducted at the STA (see Table ).

TABLE 1 Studies at the STA: An Overview

In 2013, a preliminary study was carried out by two of the authors of this article to provide a first look at the strategy work and how this work enabled and/or constrained the strategy of developing the STA into a modern agency. A document study of formal management control was conducted and complemented with interviews at different hierarchal levels and different divisions to get an initial understanding about strategy work in relation to the formalized ideas about SM. In the interviews, the authors asked questions about what the respondents did in their daily work, which tools they used to conduct their work, what their thoughts about the strategy were, and how they used the strategic plan. The preliminary study indicated that there were some difficulties in implementing the strategic plan, which suggested the need for a more comprehensive investigation.

The next study, conducted in 2014, was to further understand the challenges that could arise from the interpretations of the strategic plan into operation. The authors, in conjunction with the reference group at the STA, decided to follow how the strategy work at the two divisions of the STA—Planning and Maintenance—unfolded. To make it manageable, as the focus was on following the micro activities of strategizing, we narrowed it down into the study of two divisions. Thirty interviews were conducted (for more information, see Table ). Our interview questions were related to what the respondents did in their daily work; which tools they used to conduct their work; what their views were on strategy, the strategic plan, and its goals; and how they worked to implement the strategy.

As a complement to the interviews, we studied steering documents and internal PowerPoint presentations. In addition, scorecards were studied as an example of an actual use of a tool in practice, but also because the strategy was to be implemented through the scorecards and the preliminary study suggested that this was an issue. The preliminary study also suggested that there were some issues regarding the understanding of strategy and how to evaluate and monitor it. In line with these results, two workshops were organized at the STA in 2014. At Workshop 1, people working with strategy were invited to discuss the strategy work at the STA. Twenty-five people participated, six of whom had previously been interviewed. Questions about strategy, its role and function, and the relationship between strategy and the STA management control were the main themes discussed at the workshop. At Workshop 2, people working with management control and strategy were invited to discuss evaluation and monitoring activities. Questions about performance, output, and outcome as well as the relationship between strategy, evaluation, and monitoring activities were addressed. Twenty-three people participated, five of whom had previously been interviewed.

The last study was conducted between 2015 and 2016. It included the participation of all of the authors of this article. The previous studies had shown that the strategy had not been implemented at the operational level of the agency, and the strategic plan tended to disappear among all of the tools used at the STA for management control. Moreover, formalized management control constrained rather than enabled the strategy work. In this study, we specifically wanted to target management control and what possible tensions there could be in relation to strategy. Therefore, we interviewed 16 people working with management control at the STA (see Table ). We also arranged a workshop in autumn 2015 where we invited people working with management control and strategy at different hierarchical levels at the STA. Twenty people came to discuss possible tensions between different management tools at the agency. Half of them had previously been interviewed.

Coding and Analyzing

The coding in this article was inspired by Feldman et al. (Citation2004). The coding process can be described as the precursor to the analysis. Prior to coding the empirical data, all of the interviews and workshops were recorded and transcribed verbatim. Together with the documents, these transcriptions were the foundation of the coding. While the coding is quite different from doing the analysis itself, as the goal is not to find results but to find a way to manage a large amount of text, it is quite common to work with different categories. The categories used during the coding process should be closely connected to the research question(s). In this specific article, the aim was to search for instances of how the selected tools are used in relation to the strategic plan. This suggested that the units of analysis of the data were the tools. As such, we categorized the empirical material in line with the selected tools of study for this article; i.e., MBO, Delivery Qualities, the Transport Plan, the Instruction, the Appropriation Letter, the Operational Plan, the Budget, and the Balanced Scorecard. We also structured the discussion of findings at STA in line with these categories of tools. This meant that every instance of text that narrated something about one of the studied tools—for example, the balanced scorecard—was put into the category of the balanced score card. In this way, we ended up with several hundred pages of coded text that was the basis for the article’s analysis.

As regards the analysis, the contextual knowledge that emerged from conducting three studies at the STA, analyzing the case against theory, and writing three reports was invaluable for the development of this article. Nevertheless, this also makes it hard to show total transparency of the process—e.g., writing every aspect of what was done or not done—and transfer this kind of emergent knowledge into the concept of a single article (see, e.g., Feldman et al. Citation2004; Jarzabkowski Citation2008). However, the analytical process can be described as we iterated between the empirical data and the literature (Siggelkow Citation2007), using the SM literature as a means of understanding the empirical data at different stages in the process of studying the STA.

In the first step, we searched for how the coded texts in the different categories of tools addressed strategy work in relation to the strategic plan. In doing so, we consulted the data as to whether the tools were described as enablers and/or as constrainers of strategy work. In light of this question, after several readings of the coded texts and after several meetings where the research group discussed preliminary findings, the authors started to see some patterns occurring in the data. The summarized findings from the coding and analysis are presented in Table .

TABLE 2 How Tools Enable and Constrain Strategy Making

In the second step, we tried to understand the findings in Table by thematizing and labelling the patterns we saw, resulting in three different tensions: short- versus long-term, parts versus whole, and reactivity versus proactivity. These tensions were also discussed and agreed as reasonable with representatives of the STA (cf. Weiss Citation2016). The first tension, between short- and long-term, was the most frequently recurring theme. For example, the long-term strategic plan was described by all of the interviewees as creating tensions with the tools for management control that take a short-term perspective. For example, the operational plan, the scorecard, and the budget all have a time frame of one to three years, making strategy work constrained or impossible to do. The second tension embraces the agency’s idea of taking a holistic view when working with strategy and relating the strategic work to the whole while, at the same time, having an overall focus on specific parts that are not connected to the overall strategy and the whole of the organization. The third tension relates to the strategic plan and striving towards becoming a modern agency. However, when we analyzed the STA and its strategy work, we could see that the agency acted reactively, waiting for the government to come with instructions, or reacting to customer needs or the actions taken by the media. An enhanced discussion about the three tensions in relation to previous literature on SM in the public sector is presented in the discussion of the results.

STRATEGIC MANAGEMENT IN PRACTICE: THE SWEDISH TRANSPORT ADMINISTRATION

The strategic plan at the STA has a time frame of 10 years and includes the vision “Everyone arrives smoothly, green and safe,” six strategic challenges, 19 strategic objectives, and strategies for each objective. The strategic challenges are critical areas identified by the STA and are defined as gaps between a desired state and expected development. As such, they do not cover all the agency’s activities. The six strategic challenges are: (1) an energy-efficient transport system; (2) well-functioning travel and transportation in big cities; (3) efficient transport chains for industry; (4) a robust and reliable infrastructure; (5) more value for money; and (6) the STA: a modern central agency. In this section, we will address this strategic plan in relation to the tools of MBO, Delivery Qualities, the Transport Plan, the Instruction, the Appropriation Letter, the Operational Plan, the Budget, and the Balanced Scorecard.

Management by Objectives

STA’s internal management and control is governed by MBO. In line with Drucker (Citation1954), who is often credited as the “inventor” of MBO, STA took the perspective of MBO being both a philosophy and a tool. The implementation of the agency’s strategic plan and the agency’s strategic work should thus be carried out within MBO. The government stipulates goals and the government agencies are responsible for finding the best way to achieve and implement them. In this context, SM becomes relevant because planned strategies can be understood as a strategic plan, or an outline, of sufficient means for achieving desired ends (Walker et al. Citation2010). In this sense, the increased interest in SM in the public sector can be seen as a natural development of NPM-inspired management reforms (Ferlie and Ongaro Citation2015; Hansen Rosenberg and Ferlie Citation2016). Part of this reform is MBO, with its associated emphasis on decentralized decision making and the absence of governmental micro-management.

Within strategic management, a holistic perspective is often described as a central condition of strategic work (Mintzberg Citation1994; Koteen Citation1997; Plant Citation2009; Poister Citation2010; Williams and Lewis Citation2008). When considering the basic thoughts behind MBO as a philosophy, one can argue that it represents a holistic perspective. However, if its application in relation to other tools used when applying SM is considered, our analysis shows that this is questionable, as we found that MBO often leads to a focus on limited parts of the operation rather than a holistic perspective. The following quote from an employee at Workshop 1 gives a good example of when MBO gets in the way of the big picture:

The STA pursues development for about SEK 500 million a year.[ … ] Here we clearly see the effects of MBO, because each individual interprets what happens [ … ] and acts based on that interpretation, which means that they are not acting from a holistic perspective.[ … ] As I listen [to the discussion today], I understand a little better why this happens. We need to look more at the big picture.

Transportation Policy Objectives

The government’s general ambitions for the STA are expressed in two transportation policy objectives: (1) a “functional objective” that focuses on the geographically equitable availability of the transportation system; and (2) a “deference objective” that focuses on safety, environment, and health. Moreover, the purpose of the transportation policy objectives is to ensure a financially efficient and sustainable transportation system for all citizens and businesses in Sweden. In a PowerPoint presentation made by the central STA office, the transportation policy objectives are presented in the following way:

The transportation policy objectives (together with administrative policy objectives) were important starting points when selecting the strategic challenges and strategic objectives. Delivery qualities that describe the transportation infrastructure status and trends over time can be seen as a concretization of the STA’s contribution to the transportation policy objectives.

When analyzing the empirical material, we see that the transportation policy objectives tend to be conflicting, unclear, and complex, leaving considerable space for alternative ways of interpreting them into practice (cf. Jarzabkowski and Sillince Citation2007; Lane and Wallis Citation2009). A dilemma that can be exemplified by one of the top managers:

The goals of the transportation policy objectives are not always that clear. There are a lot of discussions regarding the status. For example, there are very, very many environmental goals. If you look at all the environmental goals, not only within infrastructure and transportation, but overall, we will not be able to meet all of the goals. The difficult job is to always prioritize among the goals.

There is more or less a general agreement at the STA that there are too many goals and that it is difficult to know how to prioritize them, which also makes it hard to know which of the long-term strategic goals should be part of the short-term operative work. Some of the interviewees also emphasized that the strategic plan and its challenges are insufficient and lack in governance; the external transportation policy goals set by the politicians are what govern the agency, rather than the strategic plan. One example of the governance aspect is expressed by a first-line manager:

I would say that the strategic challenges are not being used in the STA’s governance today. The strategic challenges are the way we have been chosen to transform the transportation policy objectives […] you have the transportation policy objectives, and then you try to add the perspective of the strategic challenge, and then at my level we again try to follow the transportation policy goals.

Delivery Qualities

On the government’s initiative, the STA has developed new indicators—called “delivery qualities”—to measure the outcomes of the STA’s activities. There are six delivery qualities: (1) punctuality; (2) capacity; (3) robustness; (4) usability; (5) security; and (6) environment and health. The purpose of this tool, implemented in 2014, is to find a common focus on customer travel and transportation, to gain clarity about the government’s monitoring and control and transparent management control from the strategic to operational levels, a common thread for long-term planning, monitoring and control, and lastly, to be able to secure verified information about outcome development over time. The STA must account for the delivery qualities in its annual reports.

With the implementation of the delivery qualities, there is some confusion as to what should be understood as the agency’s strategies. For instance, one understanding is that the delivery qualities constitute the agency’s new strategies; i.e., they should replace the strategic plan. In other words, one interpretation is that the delivery qualities are the agency’s new strategy. The official idea, however, is that the agency’s strategic challenges are to be a translation of management cues from the government, including the delivery qualities. However, the delivery qualities sometimes sideline the agency’s own internal strategic plan. To sum up, the delivery qualities in the organization make the agency’s SM confusing. This can be exemplified by an employee who said:

I think there are a few different tracks that need to be merged together in our overall management. First, there’s the delivery qualities for operations and maintenance [ … ] which need to be merged with the strategic management. They even call it the governance framework, which makes it a bit confusing. That’s a challenge in itself.

It is important for the STA to monitor the delivery qualities because this was imposed on them by the government, but there are also other important reasons. Recurring problems with functionality in the Swedish railway system have led to harsh criticism and constant media scrutiny of both the STA and the responsible politicians. The interviewees often describe the delivery qualities as a governance framework of managing these functionality problems in the transportation system, and as a response to the media’s scrutiny and criticism of the STA. This makes delivery qualities a strategic tool for the agency to use in communicating with the government as well as the general population and the media. The following quote from a middle-manager exemplifies this:

The delivery qualities might actually describe our core activities even better than the transportation policy goals, so I see it as a way for us to communicate with the outside world; i.e., what money they’re “pumping into” the STA.

The ambition of the delivery qualities is to generate information on the external effects of the agency’s operations, but from a customer perspective the framework has more of a production-oriented, internally driven perspective. One of the employees working with customer services said:

I think they [the delivery qualities] are very much based on a production perspective.[ … ] Have we really considered what we’re supposed to be producing? No, we haven’t.

Hence, the delivery qualities with their production perspective are often prioritized at the expense of customer focus. This is problematic in relation to the agency´s ambition for how to apply SM, as much of the STA’s strategic work involves a desire to be proactive. For example, the sixth strategic challenge—“the STA: a modern agency”—emphasizes the importance of customer satisfaction and that the agency should embrace more of an externally driven perspective (external efficiency) that emphasizes the importance of a customer focus. This, in turn, imposes new requirements on the employees. Those who work with services and customer issues explained that the term “externally driven” refers to proactive management in which customers’ current and future needs influence the agency’s internal management. This, in turn, is expressed by several of the interviewees, as well as in the strategic plan, which includes being responsive and flexible towards the outside world.

The Instruction and the Appropriation Letter

The instruction and the appropriation letter are set by the Swedish government. In the agency’s instruction, the government stipulates that the STA should have a point of departure in an intermodal perspective where they are responsible for the long-term planning of the infrastructure for road, rail, sea, and air transport, as well as for the construction and operation of state-owned roads and railways. One of the main reasons the STA was formed was to create a holistic approach to the transportation system. The instructions from the government (SFS 2010 185, 1 §, Assignment) states:

The job of the STA is to maintain a holistic perspective over all types of traffic and thereby take charge of all long-term infrastructure planning for road, rail, shipping and aviation as well as for building and operating national roads and railways.

In the annual appropriation letter, the government provides the agency’s budget and annual objectives. In other words, public-sector agencies have limited control over their financial means, which makes it difficult to connect the agencies’ financial management with their SM (cf. Johnsen Citation2016). Thus, the Swedish government’s financial management of the agency tends to have a strong influence on the rest of the STA’s management. The budget is often viewed as an overall framework within which the rest of the agency’s management activities take place. In other words, the agency’s planning and execution of its assignment takes place within the financial framework (cf. Johnsen Citation2016).

One of the middle-managers highlighted the fact that the instructions and the appropriation letter often include specific assignments and that it is important to have some guidelines in the assessment of these assignments; for example, through the strategic plan:

The instruction and appropriation letter occasionally contain assignments.[…] Then we need to understand what it is that guides us [when implementing these assignments]—of course it is the strategic challenges, but there may also be other things that have been decided at the STA as guidelines: where to go, which way.

It is also stated in formal documents—for example, in the document requiring strategic planning—that the instructions and the appropriation letter should serve as input in the strategic planning process, together with the transportation plan. This is also confirmed by the majority of the interviewees, and one could see the assessment of these tools in the formulated strategic plan.

The Transportation Plan

Complementing the instructions and appropriation letter is a transportation plan approved by the government that is to be implemented locally in the STA through various action planning activities (cf. Weiss Citation2016). The transportation plan takes a time perspective of 25 years and contains detailed information about how to prevent problems and assure efficient operations, and how to work for efficiency, safety, and the environment. It describes the need for cooperation with other parties to achieve the transportation policy objectives and professional estimations of the effects that the transportation plan is expected to generate. This means that the instruction, the letter of appropriation, and the transportation plan are central to the strategic planning process. However, there are times when the transportation plan takes precedence over the strategic plan. A first-line manager explained this in light of the transportation plan being an external government decision while the strategy is internal:

So they [the strategic challenges] are also represented in the transportation plan, which is the most important policy document for the STA.[…] Formally it is the transportation plan that is in focus, there’s no doubt about it as it is a government decision. The strategic challenges are only internal.

Moreover, the transportation plan is the only document that takes a holistic approach to the operations and forms the basis of what the agency is intended to do. Some of the interviewees stated that it is difficult to convey the entire transportation plan to all operational areas, divisions, and units because the plan is so big. The document is more than 150 pages long. There are also regional plans developed with the specifics for each region in relation to the transportation plan. In practice, it was stated that it is a challenge to manage both the whole and the parts. In this instance, the whole is so extensive that it is not put to use, and instead the focus is on the parts through the regional plans and resource allocation management.

The 2016 Travelling Goals

The 2016 travelling goals are a tool to describe what should characterize the agency and its mindset, to manage the employees in line with the mission “Every day, we deliver high availability that provides benefits to society and develops society.” Three main areas in the travelling goals were highlighted as needing improvement: (1) customer orientation, including punctuality of trains, convenience for the customer, and maintaining a dialogue with the community at large; (2) a wise way of working, a focus on performance, a security culture, internal and external cooperation; and (3) committed employees, which includes the right competence, empowerment, and an attractive workplace. Thus, the travelling goals have both an internal, inward-looking, and an outward-looking, external perspective.

Workshop 2 revealed that goal picture 2013, which later became the 2016 travelling goals, emerged to cover the gap between the strategic plan and the STA’s operations. That was because there had been some challenges in interpreting the long-term goals in the strategic plan into the more short-term daily operations. In other words, the idea was that the 2016 travelling goals would serve as a link between the strategic plan and the operations. In the discussion that followed among the participants, it also became clear that the relationship between the 2016 travelling goals and the strategic challenges was not clear. This was a recurring statement in the interviews and can be exemplified by one of the middle-managers, who said:

We can return to and interpret these kinds of strategic documents [the strategic plan] at an overarching traffic level, but we also have to link it to the 2016 travelling goals, which are the STAs common steps that I think mesh well. In other words, interpret what the strategic challenges mean, what the 2016 travelling goals mean and what the politicians say.

However, the 2016 travelling goals are not well used in the agency according to those interviewed, which was also supported by an analysis of the documents where the travelling goals are not included.

The Operational Plan

The operational plan is based on MBO and has a time perspective of three years. It includes different external and internal assignments and what to prioritize. The operational plan should also be an interpretation of the content of the strategic plan and its six challenges into an operative level. The overall budget and resource allocation are specified in the operational plan, including what measures should be taken in line with the budget and where they should be carried out. The overall framework is already set, but there is scope for action regarding detailed planning and how to implement it.

When we analyzed the operational plan at the overall STA level for 2012–14, 2013–15 and 2014–16, we saw that SM was clearly applied throughout the strategic challenges, goals, and strategies. The operational plan provides an exhaustive account of the STA’s challenges and strategic orientation. This is then related to the 2016 travelling goals (or the previous goal picture 2013), where the strategic challenges are presented as an input to the organization’s way of working. Critical success factors are presented and described as important for the organization to achieve its strategic objectives. However, the managers felt that it is challenging to interpret the long-term strategic plan and its goals into the operational plan, which has a shorter time frame and an operative perspective; moreover, that this “issue” with interpretation has contributed to varied practices and ways of doing the strategy work in the agency’s different units. One of the middle-managers said:

The unit for management control sent out their directives for the operational plan. At the time, they attached the strategic plan. I said that this isn’t going to work, developing an operational plan for one to three years based on that [the strategic plan]. There is too great a gap between them. We can’t break down these strategies, to have every employee or unit sit down and interpret them [the goals in the strategic plan] because then everybody will do it in their own way.

Budget

The overall budget for the operational plan is set beforehand, but is intended to leave room for decisions regarding what actions to take and how resources should be allocated in a time perspective of one to three years. On several occasions, the interviewees and the participants in the workshops returned to the fact that the financial management and the resource allocation in the budget are problems in relation to the strategic plan with its 10-year time frame. Some of the interviewees problematized the fact that the agency receives an annual budget, which means that the government imposes a short-term financial perspective that does not fit well with the rest of the agency’s planning.

Several of the interviewees stated that the government’s short-term financial management of the STA has a strong influence on the agency’s ability to apply SM as a whole. Long-term strategic work is often overshadowed when the short-term budget makes up the overall framework of the agency’s management and planning. Another example deals with how the STA handles the goals of the strategic challenge “more value for the money.” This challenge often leads to the agency focusing on internal efficiency—achieving things at the lowest possible cost—rather than external efficiency—doing things that generate desirable long-term effects in society. Internal efficiency also tends to promote short-term rather than long-term thinking, because there is a tendency to focus on internal processes and their efficiency. For example, at one point in Workshop 1, the participants discussed the terms “culture of results” and “culture of economy.” They explained that the agency’s financial management has little to do with its long-term results in society, but that the STA cannot opt out of financial management.

Balanced Scorecard

The main idea is that the strategic plan should be implemented and operationalized through the operational plan and the balanced scorecard. The scorecard in STA is inspired by Kaplan and Norton (Citation1992) and the so-called Scandinavian version of the balanced scorecard (Olve, Roy, and Wetter Citation1998), and is a strategic tool including critical success factors and performance measurements, as well as activities that need to be linked to any of the five perspectives: (1) client; (2) customer; (3) finance; (4) methods; and (5) employees. The performance measurements are then closely followed up and monitored. However, units are free to choose whether or not to use the scorecard on an operational level; thus, it is only the top management that must use the scorecard at the department level. As a result, there is no way for the agency to know how well the strategic plan is being implemented at the operational level.

The idea is that the agency’s strategic plan is interpreted into the specifics of the organization’s everyday activities through the agency’s scorecard. In that way, each department can be said to “meet” the strategies at their level of operations; i.e., by operationalizing them into situated objectives and indicators, and making them relevant to their context. Such a process implies a significant reduction in the time perspective implemented. In effect, the agency’s strategic plan refers to a time span of 10 years, whereas the balanced scorecard, which is regarded as a strategic tool for short-term management, refers to a time span of three years. Furthermore, even though the scorecard is supposed to have a perspective of three years, its time frame, as one interviewee stated, tends to be even shorter insofar as it “should be possible to follow on a monthly basis.”

In Workshop 1, the participants explained that the scorecard generates short-term thinking in the organization and therefore the relationship between the strategies and the agency’s scorecards is not clear. Moreover, the scorecard as a tool for SM tends to draw attention towards the “here and now” of daily operations, at the expense of becoming a tool for strategy implementation. In other words, the scorecard has a significant impact on making the agency short-sighted.

The six strategic challenges are reduced to smaller components in the form of quantitative indicators in the scorecards. The STA chose to focus on a small number of indicators in areas that are considered “critical” and in need of improvement in the operations, and which thus require specific oversight and monitoring. Focusing on elements in critical need of improvement can be viewed as an assumption that things that work well in the agency’s operations do not need to be managed and monitored. But such an assumption creates certain challenges in the organization.

The scorecards’ focus on critical aspects greatly reduces the scope of the STA’s strategic plan, and large portions of the agency’s operations wind up outside the chain of strategic governance. For example, the STA has a database with many different indicators for assessing the condition of the transportation system. These data are important for statistical reasons, but are not always considered critical, so they are not included in the scorecards. The focus on critical issues also has other effects on the agency, because it focuses a great deal of attention on what doesn’t work instead of highlighting things that work well. In the case of the STA, “bad” examples are emphasized at the expense of the good ones, as a result of the necessary transition from a holistic perspective to clearly delimited operations, which is explained to be a part of MBO.

DISCUSSION OF RESULTS

As previous research has argued (see, e.g., Elbanna, Rhys, and Pollanen Citation2016; Hansen Rosenberg and Ferlie Citation2016; Johansson Citation2009; Poister Citation2010; Weiss Citation2016), it is not unproblematic to incorporate private-sector models of SM into the public sector. The results from analyzing the STA’s strategic plan and its relationship to the tools of MBO, Delivery Qualities, Transportation Plan, Instruction, Appropriation Letter, Operational Plan, Budget, and the Balanced Scorecard suggest that there are some specific contextual tensions related to the public sector that must be considered when working with SM. The fact that the various strategy tools applied in the public sector create tensions is not new, but our results illustrate the role that these tensions have in the agency’s strategic work. The analysis resulted in three central tensions that could be argued are inherited as part of the public-sector context: (1) short and long term; (2) parts and the whole; and (3) reactivity and proactivity. We elaborate on these tensions in the following.

Short and Long Term

Traditional strategy literature is based on the premise that the strategic plan creates stability and a long-term focus for what an organization aims to achieve (Mintzberg Citation1994; Plant Citation2009). In line with this, the STA created its strategic plan by setting overriding objectives and specifying the way to achieve goals (cf. Johnsen Citation2016; Hansen Rosenberg Citation2011). However, the premise is different for public-sector activities. Public-sector organizations are managed through government policy, and policy has a fairly short-term focus (cf. Lane and Wallis Citation2009). In Sweden, for example, there are four years between elections and the budget is established for one year at a time. As our results show, this limits the public sector when pursuing long-term strategies.

Moreover, in the STA, the long-term strategic plan, with a time perspective of 10 years, is to be implemented in the agency’s operations primarily through the operational plan and the scorecards—tools with a time perspective of one to three years. Our results show that this is a difficult process where the specific goals, indicators, and activities in the operational plan and scorecards become operative and short-term. Hence, one can conclude that the STA’s strategy work is constrained by tools supporting operational and daily activities. To sum up, the discussion so far suggests that there is a tension between the short and long term, which has been previously recognized by researchers such as Lane and Wallis (Citation2009), but on the basis of service delivery, where the conclusion was that SM could solve this tension; it has not previously been shown, as in this case, to be a contextual factor that can potentially enable or constrain public-sector strategy work.

Parts and the Whole

Like so many other central agencies, the STA cannot carry out its mission without assistance from others (cf. Lane and Wallis Citation2009). Thus, public organizations must collaborate with several external players in the public and private sector to perform their assignments (cf. Johnsen Citation2016; Poister Citation2010). In practice, this means that agencies like the STA do not “own” the whole, and thus do not have full control over the outcome of its services. This aspect of the public sector makes it harder to embrace a holistic perspective so often described as a central condition of strategic work, both in the private (e.g., Mintzberg Citation1994) and public sectors (Koteen Citation1997; Plant Citation2009; Williams and Lewis Citation2008). As Poister (Citation2010) argues, the public sector needs to move from strategic planning more into SM which, among other things, includes taking a holistic approach and linking strategy and performance measurements more effectively. The STA have tried to do this, but the measurements in the scorecards, as well as the operational plan, tend to be relatively operative and focus on specific, critical parts of the organization.

When it comes to MBO as a philosophy, it represents a holistic perspective, but when used in practice as a tool, it also tends to lead to a focus on limited parts of the operations. For delivery qualities, it can be said to counteract a holistic perspective, as they focus on six areas of the operations that need improvement, and most areas are not linked to the strategy. In addition, the delivery qualities focus primarily on operations and maintenance and problems with the railways. All in all, the results show how the holistic perspective is lost in favor of a focus on the parts and the use of tools—e.g., scorecards, the operational plan, and MBO—to stimulate it. Hence, strategy work is constrained by tools that do not support a holistic view. In summary, the discussion so far suggests that there is a possible tension between the parts and the whole in the context of the public sector.

Reactivity and Proactivity

Lane and Wallis (Citation2009) argue that the public sector is increasingly pushed towards being proactive. This is also the case in Sweden, where the government is encouraging several central agencies to take a proactive stance (Höglund Citation2015). However, this is a problem for many of them, as the government tends at the same time to stimulate reactive behavior among the agencies by giving them extra assignments on which they expect the agencies to act. The Oxford Dictionary definition of reactive is “acting in response to a situation rather than creating or controlling it.” In other words, a proactive approach means that the agency takes charge, has foresight, and prevents problems and challenges as much as possible, rather than dealing with them reactively after they have occurred.

Moreover, when it comes to strategy making, there is a great deal of literature on SM in the public sector that draws on Miles and Snow’s (Citation1978) strategic typology of the prospector who builds on the idea of a proactive approach to enhance performance (see, e.g., Andrews et al. Citation2008, Citation2009a, Citation2009b). Poister (Citation2010), in turn, emphasizes a movement from performance measurement to performance management by being more proactive. In line with these thoughts, there is an ambition in the STA’s strategic plan to be proactive, but our results show that through its use of tools the agency ends up in a reactive rather than a proactive approach. The reactiveness is built on a primarily production-oriented internally driven perspective, e.g., in the operational plan, which stimulates an inward focus instead of a proactive and outward-oriented focus at the STA. The same goes for the use of the scorecard as a strategic tool. The scorecard makes public organizations apply a largely inward-looking perspective (Williams and Lewis Citation2008). To sum up the discussion, there is a possible tension between being proactive and reactive in the context of strategy work in the public sector.

CONCLUSION

The analytic term “strategizing” is useful, because it helps us focus on what people do in their everyday work, how they do it, and what happens when management ideas such as SM are applied in practice and with which tools (Jarzabkowski and Kaplan Citation2015; Jarzabkowski and Seidl Citation2008; Spee and Jarzabkowski Citation2011). When it comes to strategic work, the public sector has several specific, unique traits (Andrews and Van de Walle Citation2012; Elbanna, Rhys, and Pollanen Citation2016; Ferlie and Ongaro Citation2015; Hansen Rosenberg and Ferlie Citation2016; Weiss Citation2016) that tend to create tensions when applying SM in practice and whichever tools may be used. For example, previous research has shown that public organizations act in a pluralistic context in which multiple internal and external interests must be met at once (Jarzabkowski and Fenton Citation2006; Jarzabkowski and Sillince Citation2007; Jarzabkowski, Lê, and Van de Ven Citation2013; Johnsen Citation2016; Williams and Lewis Citation2008). Pluralistic organizing tensions can thus be said to be inherent in the public sector, which develops various bureaucratic organizing practices and processes to deal with those tensions (Jarzabkowski and Fenton Citation2006). We have contributed to strategy research by analyzing the micro processes of strategizing at the STA and the awareness of three specific tensions of public organizations: short and long term, parts and whole, and reactivity and proactivity. These tensions have been shown to potentially enable or constrain strategy making in the public sector.

Conceptually, we know a lot about strategy, but there are few empirical studies of strategy practice and its consequences (Johnsen Citation2016). By focusing on the micro aspects of strategizing in this article, we have contributed rich empirical material to the study of strategic tools, their features, and which tools were adopted, which there has been a call for (Jarzabkowski and Kaplan Citation2015). Moreover, there is an emergent need to further enhance our understanding of how SM is applied in public organizations as its use is growing, but at the same time we know too little of its application and possible consequences (George and Desmidt Citation2014; Hansen Rosenberg Citation2011; Williams and Lewis Citation2008). This article was an attempt to address some of these issues.

However, we need several more article of this kind, and we suggest that more research is needed on strategy practices in the public sector and which tools are used, how they are used, and why. In other words, more case studies need to be done on a micro level of analysis. Furthermore, there is more research needed that takes the specific traits of the public sector into account when it comes to strategy work and SM; this, as we conclude that the public sector has several specific, unique traits that bring on tensions when applying SM in practice.

ACKNOWLEDGMENTS

The authors would like to thank the Swedish Transport Administration, The Jan Wallanders and Tom Hedelius Foundation, and the AES (the Academy of Management and Control in Central Government) at Stockholm Business School. We also thank Rhys Andrews and two anonymous reviewers. An earlier draft of this article was presented at the 9th International EIASM Public Sector Conference in Lisbon, Portugal, September 6–8, 2016.

Additional information

Funding

This work was supported by the Swedish Transport Administration [Grant Number 2511202], The Jan Wallanders and Tom Hedelius Foundation [Grant Number W2013-0542:1], and the Academy of Management and Control in Central Government [Grant Number 2930227].

Notes on contributors

Linda Höglund

Linda Höglund ([email protected]) is an assistant professor at School of Business, Society and Engineering (EST), Mälardalen University, Sweden. Her current research focus on discourses of strategy, strategic entrepreneurship practices, strategizing and strategic management in a public sector context.

Mikael Holmgren Caicedo

Mikael Holmgren Caicedo ([email protected]) is an associate professor at Stockholm Business School, Stockholm University, Sweden. His research interests are on the organization of management accounting and control and the poetics and rhetoric of organizational and accounting practices.

Maria Mårtensson

Maria Mårtensson ([email protected]) is an associate professor at Stockholm Business School, Stockholm University, Sweden. Maria’s current research interest concern management accounting and control, strategic management and entrepreneurship in a public sector context.

Fredrik Svärdsten

Fredrik Svärdsten ([email protected]) is assistant professor at Stockholm Business School, Stockholm University, Sweden. His research interests concern strategic management, performance management, and auditing in the public sector.

REFERENCES

  • Andrews, R. and S. Van de Walle. 2012. “New Public Management and Citizens’ Perceptions of Local Service Efficiency, Responsiveness, Equity and Effectiveness.” Public Management Review 15(5):762–783.
  • Andrews, R., G. A. Boyne, J. Law, and E. M. Walker. 2008. “Organizational Strategy, External Regulation and Public Performance.” Public Administration 86(1):185–203.
  • Andrews, R., G. A. Boyne, J. Law, and E. M. Walker. 2009a. “Centralization, Organizational Strategy, and Public Service Performance.” Journal of Public Administration Research and Theory 19(1):57–80.
  • Andrews, R., G. A. Boyne, J. Law, and E. M. Walker. 2009b. “Strategy Formulation, Strategy Content and Performance.” Public Management Review 11(1):1–22.
  • Balogun, J., P. Jarzabkowski, and D. Seidl. 2007. “Strategizing Activity and Practice.” Pp. 196–214 in Advanced Strategic Management, edited by V. Ambrosini, and M. Jenkins. Basingstoke, England: Palgrave.
  • Bevan, G. and C. Hood. 2006. “What’s Measured is What Matters: Targets and Gaming in the English Public Health Care System.” Public Administration 84(3):517–538.
  • Boyone, G. A. and R. M. Walker. 2010. “Strategic Management and Public Service Performance: The Way Ahead.” Public Administration Review 70(1):185–192.
  • Bryson, J. M. 2004. Strategic Planning for Public and Nonprofit Organizations: A Guide to Strengthening and Sustaining Organizational Achievement, 3rd ed. San Francisco, CA: Jossey-Bass.
  • Bryson, J. M., F. Ackermann, and C. Eden. 2007. “Putting the Resource-Based View of Strategy and Distinctive Competencies to Work in Public Organizations.” Public Administration Review 67(4):702–717.
  • Bryson, J. M., F. S. Berry, and K. Yang. 2010. “The State of Public Strategic Management Research: A Selective Literature Review and Set of Future Directions.” The American Review of Public Administration 40(5):495–521.
  • Bryson, J. M., B. C. Cosby, and J. K. Bryson. 2009. “Understanding Strategic Planning and the Formulation and Implementation of Strategic Plans as a Way of Knowing: The Contributions of Actor-Network Theory.” International Public Management Journal 12(2):172–207.
  • Diefenbach, T. 2009. “New Public Management in Public Sector Organizations: The Dark Sides of Managerialistic ‘Enlightenment.’” Public Administration 87(4):892–909.
  • Drucker, P. 1954. The Principles of Management. New York, NY: Harper & Row.
  • Drumaux, A. and C. Goethals. 2007. “Strategic Management: A Tool for Public Management? An Overview of the Belgian Federal Experience.” International Journal of Public Sector Management 20(7):638–654.
  • Dyer, W. G. and A. L. Wilkins Jr. 1991. “Better Stories, Not Better Constructs, to Generate Better Theory: A Rejoinder to Eisenhardt.” The Academy of Management Review 16(3):613–619.
  • Elbanna, S., A. Rhys, and R. Pollanen. 2016. “Strategic Planning and Implementation Success in Public Service Organizations: Evidence from Canada.” Public Management Review 18(2):1017–1042.
  • Feldman, M. S., K. Sköldberg, R. N. Brown, and D. Horner. 2004. “Making Sense of Stories: A Rhetorical Approach to Narrative Analysis.” Journal of Public Administration Research and Theory 14(2):147–170.
  • Ferlie, E. 2003. “Quasi-Strategy: Strategic Management in Contemporary Public Sector.” Pp. 279–298 in Handbook of Strategy and Management, edited by A. M. Pettigrew, H. Thomas, and R. Whittington. London, England: Sage.
  • Ferlie, E., L. Ashburner, L. FitzGerald, and A. Pettigrew. 1996. The New Public Management in Action. Oxford, England: Oxford University Press.
  • Ferlie, E. and E. Ongaro. 2015. Strategic Management in the Public Services Organizations: Concepts, Schools and Contemporary Issues. Abingdon, England: Routledge.
  • George, B. and S. Desmidt. 2014. “A State of Research on Strategic Management in the Public Sector: An Analysis of the Empirical Evidence.” Pp. 151–172 in Strategic Management in Public Organizations: European Practices and Perspectives, edited by P. Joyce, and A. Drumaux. New York, NY: Routledge.
  • George, B. and S. Desmidt. 2016. “Strategic-Decision Quality in Public Organizations: An Information Processing Perspective.” Administration & Society 43:1–26.
  • George, B., S. Desmidt, and J. De Moyer. 2016a. “Strategic Decision Quality in Flemish Municipalities.” Public Money & Management 36(5):317–324.
  • George, B., S. Desmidt, P. A. Nielsen, and M. Baekgaard. 2016b. “Rational Planning and Politicians’ Preferences for Spending and Reform: Replication an Extension of a Survey Experiment.” Public Management Review 19(9):1–21.
  • Hansen Rosenberg, J. 2011. “Application of Strategic Management Tools after an NPM Inspired Reform: Strategy as Practice in Danish Schools.” Administration and Society 43(7):770–806.
  • Hansen Rosenberg, J. and E. Ferlie. 2016. “Applying Strategic Management Theories in Public Sector Organizations: Developing a Typology.” Public Management Review 18(1):1–19.
  • Höglund, L. 2015. Strategic Entrepreneurship: Organizing Entrepreneurship in Established Organizations. Lund, Sweden: Studentlitteratur.
  • Höglund, L., M. Holmgren, M. Caicedo, and M. Mårtensson 2015. “Managing Paradoxes in Governance: Tensions in the Emergence of a New Board.” Pp. 3–29 in Contingency, Behavioural and Evolutionary Perspectives on Public and Nonprofit Governance, edited by L. Gnan, A. Hinna, and Monteduro. Bingley, England: Emerald Books.
  • Hood, C. and G. Peters. 2004. “The Middle Aging of New Public Management: Into the Age of Paradox?” Journal of Public Administration Research and Theory 14(3):267–282.
  • Jarzabkowski, P. 2005. Strategy as Practice: An Activity Based Approach. London, England: Sage.
  • Jarzabkowski, P. J. 2008. “Shaping Strategy as a Structuration Process.” Academy of Management Journal 51(4):621–650.
  • Jarzabkowski, P., J. Balogun, and D. Seidl. 2007. “Strategizing: The Challenges of a Practice Perspective.” Human Relations 60(1):5–27.
  • Jarzabkowski, P. and E. Fenton. 2006. “Strategizing and Organizing in Pluralistic Contexts.” Long Range Planning 39(1):631–648.
  • Jarzabkowski, P. and S. Kaplan. 2015. “Strategy Tools-in-use: A Framework for Understanding ‘Technologies of Rationality’ in Practice.” Strategic Management Journal 36(4):537–558.
  • Jarzabkowski, P., J. K. Lê, and A. H. Van de Ven. 2013. “Responding to Competing Strategic Demands: How Organizing, Belonging, and Performing Paradoxes Coevolve.” Strategic Organization 11(3):245–280.
  • Jarzabkowski, P. and D. Seidl. 2008. “The role of meetings in the social practice of strategy.” Organization Studies 29(11):1391–1426.
  • Jarzabkowski, P. and A. P. Spee. 2009. “Strategy-as-Practice: A Review and Future Directions for the Field.” International Journal of Management Reviews 11(1):69–95.
  • Jarzabkowski, P. and D. Seidl. 2008. “The Role of Meetings in the Social Practice of Strategy.” Organization Studies 29(11):1391–1426.
  • Jarzabkowski, P. and J. Sillince. 2007. “A Rhetoric-in-Context Approach to Building Commitment to Multiple Strategic Goals.” Organization Studies 28(11):1639–1665.
  • Johansson, J.-E. 2009. “Strategy Formation in Public Agencies.” Public Administration 87(4):872–891.
  • Johnsen, Å. 2016. “Strategic Planning and Management in Local Government in Norway: Status after Three Decades.” Scandinavian Political Studies 39(4):333–365.
  • Johnson, G. 1987. Strategic Change and the Management Process. Oxford, England: Basil Blackwell.
  • Johnson, G. and K. Scholes. 2001. Exploring Public Sector Strategy. Upper Saddle River, NJ: Prentice Hall.
  • Johnson, G., A. Langley, L. Melin, and R. Whittington. 2007. Strategy as Practice: Research Directions and Resources. Cambridge, England: Cambridge University Press.
  • Johnson, G., L. Melin, and R. Whittington. 2003. “Guest Editors’ Introduction: Micro Strategy and Strategizing: Towards an Activity-Based View.” Journal of Management Studies 40(19):3–22.
  • Joyce, P. 2000. Strategy in the Public Sector: A Guide to Effective Change Management. West Sussex, England: Wiley.
  • Joyce, P. 2004. “Guest Editorial: Public Sector Strategic Management: The Changes Required.” Strategic Change 13(3):107–110.
  • Kaplan, R. S. and D. P. Norton. 1992. “The Balanced Scorecard: Measures that Drive Performance.” Harvard Business Review 70:71–79.
  • Koteen, J. 1997. Strategic Management in Public and Nonprofit Organizations: Managing Public Concerns in an Era of Limits. Westport, CT: Greenwood Press.
  • Lane, J.-E. 2008. “Strategic Management for Public Services Delivery.” The International Journal of Leadership in Public Services 4(3):15–23.
  • Lane, J.-E., and J. Wallis. 2009. “Strategic Management and Public Leadership.” Public Management Review 11(1):101–120.
  • Lapsley, I. 2008. “The NPM Agenda: Back to the Future.” Financial Accountability and Management 24(1):77–93.
  • Lê, J. K. and P. A. Jarzabkowski 2015. “The Role of Task and Process Conflict in Strategizing.” British Journal of Management 26(3):439–462.
  • Miles R. E. and C. C. Snow. 1978. Organizational Strategy, Structure, and Process. New York, NY: McGraw-Hill.
  • Mintzberg, H. 1994. The Rise and Fall of Strategic Planning. New York, NY: The Free Press.
  • Mintzberg, H. and J. A. Waters. 1985. “Of Strategies, Deliberate and Emergent.” Strategic Management Journal 6(1):257–272.
  • Mintzberg, M., B. Ahlstrand, and J. Lampel. 1998. Strategy Safari: A Guided Tour through the Wilds of Strategic Management. New York, NY: The Free Press.
  • Olve, N.-G., J. Roy, and M. Wetter. 1998. Performance Drivers: A Practical Guide to Using the Balanced Scorecard. New York, NY: John Wiley & Sons.
  • Pettigrew, A. M. 1985. The Awakening Giant. Oxford, England: Basil Blackwell.
  • Plant, T. 2009. “Holistic Strategic Planning in the Public Sector.” Performance Improvement 48(2):38–43.
  • Poister, T. H. 2010. “The Future of Strategic Planning in the Public Sector: Linking Strategic Management and Performance.” Public Administration Review 70(1):246–254.
  • Porter, M. E. 1980. Competitive Strategy Techniques for Analyzing Industries and Competitors. New York, NY: Free Press.
  • Porter, M. E. 1985. Competitive Advantage: Creating and Sustaining Superior Performance. New York, NY: Free Press.
  • Schindehutte, M. and M. H. Morris. 2009. “Advancing Strategic Entrepreneurship Research: The Role of Complexity Science in Shifting the Paradigm.” Entrepreneurship Theory and Practice 33(1):241–276.
  • Siggelkow, N. 2007. “Persuasion with Case Studies.” Academy of Management Journal 50(1):20–24.
  • Smith, P. 1995. “On the Unintended Consequences of Publishing Performance Data in the Public Sector.” International Journal of Public Administration 18(2–3):277–310.
  • Spee, A. P. and P. Jarzabkowski. 2011. “Strategic Planning as Communicative Process.” Organization Studies 32(9):1217–1245.
  • Stake, R. E. 1995. The Art of Case Study Research. Thousand Oaks, CA: Sage Publications.
  • Van de Ven, A. 2007. Engaged Scholarship: A Guide for Organizational and Social Research. Oxford, England: Oxford University Press.
  • Walker, R. M., R. Andrews, G. A. Boyne, K. J. Meier, and L. J. O’Toole Jr. 2010. “Wakeup Call: Strategic Management, Network Alarms, and Performance.” Public Administration Review 70(5):731–741.
  • Weiss J. 2016. “Trust as a Key for Strategic Management? The Relevance of Council-Administration Relations for NPM-Related Reforms in German Local Governments.” Public Management Review 19(10):1–16.
  • Whittington, R. 2006. “Completing the Practice Turn in Strategy Research.” Organization Studies 27(5):613–634.
  • Whittington, R. 2007. “Strategy Practice and Strategy Process: Family Differences and the Sociological Eye.” Organization Studies 28(10):1575–1586.
  • Van Wessel, M., R. van Buuren, and C. van Woerkum. 2011. “Changing Planning by Changing Practice: How Water Managers Innovate through Action.” International Public Management Journal 14(3):262–283.
  • Williams, W. and D. Lewis 2008. “Strategic Management Tools and Public Sector Management.” Public Management Review 10(5):653–671.