306
Views
0
CrossRef citations to date
0
Altmetric
Corrigendum

Corrigendum

This article refers to:
Adjusting scheduling model with release and due dates in production planning

Chinos, E., & Vakhania, N. (2017). Adjusting scheduling model with release and due dates in production planning. Cogent Engineering, 4(1), 1321175. https://doi.org/10.1080/23311916.2017.1321175

The first author, Elisa Chinos, was referred to incorrectly as a “PDD student” in the “About the Author” text in this article. This has now been corrected to “PhD student”. The authors apologize for this error.