Rini, Aakanksha Kishore, Leopoldo Eduardo Cárdenas-Barrón & Chandra K. Jaggi. (2022) Strategic decisions in an imperfect quality and inspection scenario under two-stage credit financing with order overlapping approach. Expert Systems with Applications 195, pages 116426.
Crossref
Prerna Gautam, Sumit Maheshwari, Ahmad Hasan, Amrina Kausar & Chandra K. Jaggi. (2022) Optimal inventory strategies for an imperfect production system with advertisement and price reliant demand under rework option for defectives. RAIRO - Operations Research 56:1, pages 183-197.
Crossref
Omar G. Alsawafy & Shokri Z. Selim. (2022) Analysis of a discrete production workstation. Computers & Operations Research 137, pages 105532.
Crossref
Harun Öztürk. (2021) Modelling Economic Order Quantities, Considering Buy and Repair Options for Defective Items, and Allowing for Shortages and Inspection Errors. Journal of the Operations Research Society of China 9:4, pages 757-795.
Crossref
Priyamvada, Prerna Gautam & Aditi Khanna. (2021) Sustainable production strategies for deteriorating and imperfect quality items with an investment in preservation technology. International Journal of System Assurance Engineering and Management 12:5, pages 910-918.
Crossref
Barun Khara, Jayanta Kumar Dey & Shyamal Kumar Mondal. (2020) An integrated imperfect production system with advertisement dependent demand using branch and bound technique. Flexible Services and Manufacturing Journal 33:2, pages 508-546.
Crossref
Amalesh Kumar Manna, Rajan Mondal, Ali Akbar Shaikh, Irfan Ali & Asoke Kumar Bhunia. (2021) Single-manufacturer and multi-retailer supply chain model with pre-payment based partial free transportation. RAIRO - Operations Research 55:2, pages 1063-1076.
Crossref
Barun Khara, Shyamal Kumar Mondal & Jayanta Kumar Dey. (2021) An imperfect production inventory model with advance payment and credit period in a two-echelon supply chain management. RAIRO - Operations Research 55:1, pages 189-211.
Crossref
Prerna Gautam, Sumit Maheshwari, Amrina Kausar & Chandra K. Jaggi. 2021. Advances in Interdisciplinary Research in Engineering and Business Management. Advances in Interdisciplinary Research in Engineering and Business Management
185
215
.
Harun Öztürk. (2020) Çevreye Karşı Duyarlılık ile Çok Ürünlü Stok Kontrol Probleminde Optimal Üretim Çevrim Süresinin BelirlenmesiÇevreye Karşı Duyarlılık ile Çok Ürünlü Stok Kontrol Probleminde Optimal Üretim Çevrim Süresinin Belirlenmesi. Alphanumeric Journal 8:2, pages 275-297.
Crossref
Jiafei Zheng, Hongbing Yang, Qingsong Wu & Ziyang Wang. (2020) A two-stage integrating optimization of production scheduling, maintenance and quality. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 234:11, pages 1448-1459.
Crossref
Amir Hossein Nobil, Abolfazl Kazemi & Ata Allah Taleizadeh. (2020) Economic lot-size problem for a cleaner manufacturing system with warm-up period. RAIRO - Operations Research 54:5, pages 1495-1514.
Crossref
Aditi Khanna, Prerna Gautam, Biswajit Sarkar & Chandra K. Jaggi. (2020) Integrated vendor–buyer strategies for imperfect production systems with maintenance and warranty policy. RAIRO - Operations Research 54:2, pages 435-450.
Crossref
Nita H. Shah & Monika K. Naik. 2020. Optimization and Inventory Management. Optimization and Inventory Management
119
136
.
Anindita Mukherjee, Oshmita Dey & B. C. Giri. (2019) An integrated vendor–buyer model with stochastic demand, lot-size dependent lead-time and learning in production. Journal of Industrial Engineering International 15:S1, pages 165-178.
Crossref
Soheyl Khalilpourazari, Seyed Hamid Reza Pasandideh & Seyed Taghi Akhavan Niaki. (2019) Optimizing a multi-item economic order quantity problem with imperfect items, inspection errors, and backorders. Soft Computing 23:22, pages 11671-11698.
Crossref
Chang Wook Kang, Misbah Ullah, Mitali Sarkar, Muhammad Omair & Biswajit Sarkar. (2019) A Single-Stage Manufacturing Model with Imperfect Items, Inspections, Rework, and Planned Backorders. Mathematics 7:5, pages 446.
Crossref
Fabian G. Beck, Konstantin Biel & Christoph H. Glock. (2019) Integration of energy aspects into the economic lot scheduling problem. International Journal of Production Economics 209, pages 399-410.
Crossref
Oshmita Dey. (2017) A fuzzy random integrated inventory model with imperfect production under optimal vendor investment. Operational Research 19:1, pages 101-115.
Crossref
Anindita Mukherjee, Oshmita Dey & B. C. Giri. 2019. Information Technology and Applied Mathematics. Information Technology and Applied Mathematics
187
203
.
S Yuniar, R Wangsaputra & A T Sinaga. (2018) Determination of Economic Lot Size between Suppliers and Manufacturers for Imperfect Production System with Probabilistic Demand. IOP Conference Series: Materials Science and Engineering 319, pages 012084.
Crossref
Chang Wook Kang, Misbah Ullah & Biswajit Sarkar. (2017) Optimum ordering policy for an imperfect single-stage manufacturing system with safety stock and planned backorder. The International Journal of Advanced Manufacturing Technology 95:1-4, pages 109-120.
Crossref
Oshmita Dey & Anindita Mukherjee. 2018. Operations Research and Optimization. Operations Research and Optimization
303
314
.
Gary C. Lin. (2017) A Vendor-Buyer Supply Chain Model with an Imperfect Production System and Standby Key Modules. A Vendor-Buyer Supply Chain Model with an Imperfect Production System and Standby Key Modules.
Leila Jafari & Viliam Makis. (2016) Joint optimization of lot-sizing and maintenance policy for a partially observable two-unit system. The International Journal of Advanced Manufacturing Technology 87:5-8, pages 1621-1639.
Crossref
L. Jafari & V. Makis. (2015) Joint optimal lot sizing and preventive maintenance policy for a production facility subject to condition monitoring. International Journal of Production Economics 169, pages 156-168.
Crossref
Filemon Yoga Adhisatya, The Jin Ai & Dah-Chuan Gong. (2015) Economic Lot Scheduling Problem with two Imperfect Key Modules. Procedia Manufacturing 4, pages 30-37.
Crossref
O. Dey & B.C. Giri. (2014) Optimal vendor investment for reducing defect rate in a vendor–buyer integrated system with imperfect production process. International Journal of Production Economics 155, pages 222-228.
Crossref
S. Paul, M. I. M. Wahab & X. F. Cao. 2014. Handbook of EOQ Inventory Problems. Handbook of EOQ Inventory Problems
179
199
.
Dah-Chuan Gong, Jhin-Yong Lin, Gary C. Lin & Wen-Na Ma. (2013) A mathematical model on an economic lot scheduling problem with shifting process and joint material replenishment. A mathematical model on an economic lot scheduling problem with shifting process and joint material replenishment.
Jia-Tzer Hsu & Lie-Fern Hsu. (2013) An EOQ model with imperfect quality items, inspection errors, shortage backordering, and sales returns. International Journal of Production Economics 143:1, pages 162-170.
Crossref
Hing Kai Chan, Sai Ho Chung & Ming K. Lim. (2013) Recent research trend of economic‐lot scheduling problems. Journal of Manufacturing Technology Management 24:3, pages 465-482.
Crossref
Jia-Tzer Hsu & Lie-Fern Hsu. (2012) An integrated vendor–buyer cooperative inventory model in an imperfect production process with shortage backordering. The International Journal of Advanced Manufacturing Technology 65:1-4, pages 493-505.
Crossref
Chui-Yu Chiu, Ming-Feng Yang, Chung-Jung Tang & Yi Lin. (2013) Integrated imperfect production inventory model under permissible
delay in payments depending on the order quantity. Journal of Industrial & Management Optimization 9:4, pages 945-965.
Crossref
Jia-Tzer Hsu & Lie-Fern Hsu. (2013) Two EPQ models with imperfect production processes, inspection errors, planned backorders, and sales returns. Computers & Industrial Engineering 64:1, pages 389-402.
Crossref
Baju Bawono, The Jin Ai, Ririn Diar Astanti & Thomas Indarto Wibowo. 2013. Proceedings of the Institute of Industrial Engineers Asian Conference 2013. Proceedings of the Institute of Industrial Engineers Asian Conference 2013
1101
1107
.
Saad M.A. Suliman & Sayed Husain Jawad. (2012) Optimization of preventive maintenance schedule and production lot size. International Journal of Production Economics 137:1, pages 19-28.
Crossref
Himani Dem & S.R. Singh. (2012) A Two-Warehouse Production Model with Quality Consideration. Procedia Engineering 38, pages 3242-3259.
Crossref
Sung-Koon Lee & Peom Park. (2011) Suggestion of Model Change Work Improvement by REBA and Therblig. Journal of the Ergonomics Society of Korea 30:6, pages 757-764.
Crossref
Ya-Hui Lin, Jen-Ming Chen & Yan-Chun Chen. (2011) The impact of inspection errors, imperfect maintenance and minimal repairs on an imperfect production system. Mathematical and Computer Modelling 53:9-10, pages 1680-1691.
Crossref
Pilar I. Vidal-Carreras. (2010) Enfoques para la Resolución del Problema ELSP. WPOM-Working Papers on Operations Management 1:2, pages 31.
Crossref
Wenzhu Liao, Ershun Pan & Lifeng Xi. (2009) Preventive maintenance scheduling for repairable system with deterioration. Journal of Intelligent Manufacturing 21:6, pages 875-884.
Crossref
Wen-Na Ma, Dah-Chuan Gong & Gary C. Lin. (2010) An optimal common production cycle time for imperfect production processes with scrap. Mathematical and Computer Modelling 52:5-6, pages 724-737.
Crossref
Chiuh-Cheng Chyu & I-Ping Huang. (2010) Supplier and Producer Profit Sharing Models Based on Inspection Sampling Policy. Journal of Service Science and Management 03:04, pages 479-486.
Crossref
Peter Kelle, Sandra Transchel & Stefan Minner. (2009) Buyer–supplier cooperation and negotiation support with random yield consideration. International Journal of Production Economics 118:1, pages 152-159.
Crossref
Wenzhu Liao, Ershun Pan & Lifeng Xi. (2009) A condition-based maintenance policy for intelligent monitored system. International Journal of Computer Applications in Technology 35:2/3/4, pages 104.
Crossref
Mohamad Y. Jaber & Alfred L. Guiffrida. (2008) Learning curves for imperfect production processes with reworks and process restoration interruptions. European Journal of Operational Research 189:1, pages 93-104.
Crossref
Selma Öner & Taner Bilgiç. (2008) Economic lot scheduling with uncontrolled co-production. European Journal of Operational Research 188:3, pages 793-810.
Crossref
Ming-Cheng Lo & Ming-Feng Yang. (2008) Imperfect Reworking Process Consideration in Integrated Inventory Model under Permissible Delay in Payments. Mathematical Problems in Engineering 2008, pages 1-18.
Crossref
Shib Sankar Sana, Suresh Kumar Goyal & Kripasindhu Chaudhuri. (2007) An imperfect production process in a volume flexible inventory model. International Journal of Production Economics 105:2, pages 548-559.
Crossref
Chao-Kuei Huang. (2004) An optimal policy for a single-vendor single-buyer integrated production–inventory problem with process unreliability consideration. International Journal of Production Economics 91:1, pages 91-98.
Crossref
B.C. Giri, I. Moon & W.Y. Yun. (2003) Scheduling economic lot sizes in deteriorating production systems. Naval Research Logistics (NRL) 50:6, pages 650-661.
Crossref
M. Ben-Daya & M. A. Rahim. 2001. Integrated Models in Production Planning, Inventory, Quality, and Maintenance. Integrated Models in Production Planning, Inventory, Quality, and Maintenance
3
28
.