423
Views
65
CrossRef citations to date
0
Altmetric
Original Articles

Lot sizing in a production system with rework and product deterioration

Pages 1355-1374 | Published online: 22 Feb 2007

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (13)

Pierre Kohlmann & Florian Sahling. (2024) A flexible planning approach for integrated lot sizing and rework planning with random proportion of defective products. International Journal of Production Research 0:0, pages 1-18.
Read now
Harun Öztürk. (2022) A deterministic economic production quantity model with partial backordering and outsourcing repair of non-conforming products. International Journal of Systems Science: Operations & Logistics 9:3, pages 355-383.
Read now
James D. Abbey & V. Daniel R. Guide$suffix/text()$suffix/text(). (2018) A typology of remanufacturing in closed-loop supply chains. International Journal of Production Research 56:1-2, pages 374-384.
Read now
Felix T.S. Chan, Nan Li, S.H. Chung & Mozafar Saadat. (2017) Management of sustainable manufacturing systems-a review on mathematical problems. International Journal of Production Research 55:4, pages 1210-1225.
Read now
Andreas Goerler & Stefan Voß. (2016) Dynamic lot-sizing with rework of defective items and minimum lot-size constraints. International Journal of Production Research 54:8, pages 2284-2297.
Read now
M. Karimi-Nasab & K. Sabri-Laghaie. (2014) Developing approximate algorithms for EPQ problem with process compressibility and random error in production/inspection. International Journal of Production Research 52:8, pages 2388-2421.
Read now
Shoude Li. (2014) Optimal control of production-maintenance system with deteriorating items, emission tax and pollution R&D investment. International Journal of Production Research 52:6, pages 1787-1807.
Read now
Hui Ming Wee & Gede Agus Widyadana. (2012) Economic production quantity models for deteriorating items with rework and stochastic preventive maintenance time. International Journal of Production Research 50:11, pages 2940-2952.
Read now
Chun-Jen Chung, Gede Agus Widyadana & Hui Ming Wee. (2011) Economic production quantity model for deteriorating inventory with random machine unavailability and shortage. International Journal of Production Research 49:3, pages 883-902.
Read now
Hyun Joon Shin & Yong Ha Kang. (2010) A rework-based dispatching algorithm for module process in TFT-LCD manufacture. International Journal of Production Research 48:3, pages 915-931.
Read now
Deng-Maw Tsai. (2009) Economic production quantity with imperfect production processes and learning effects. Journal of Information and Optimization Sciences 30:4, pages 723-742.
Read now
P. Sasikumar & G. Kannan. (2009) Issues in reverse supply chain, part III: classification and simple analysis. International Journal of Sustainable Engineering 2:1, pages 2-27.
Read now
Pablo Biswas & Bhaba R. Sarker. (2008) Optimal batch quantity models for a lean production system with in-cycle rework and scrap. International Journal of Production Research 46:23, pages 6585-6610.
Read now

Articles from other publishers (52)

Cristiano AV Cavalcante, Augusto CJ Santos, Rafael GN Paiva, Adetoye A Aribisala & Roberta B Da Silva. (2023) Delay time model for determining the effectiveness of a system under adverse conditions of production and inspection. Proceedings of the Institution of Mechanical Engineers, Part O: Journal of Risk and Reliability.
Crossref
Adel A. Alamri. (2023) A Sustainable Closed-Loop Supply Chains Inventory Model Considering Optimal Number of Remanufacturing Times. Sustainability 15:12, pages 9517.
Crossref
Faezeh Bagheri, Melissa Demartini, Alessandra Arezza, Flavio Tonelli, Massimo Pacella & Gabriele Papadia. (2022) An Agent-Based Approach for Make-To-Order Master Production Scheduling. Processes 10:5, pages 921.
Crossref
Christian Scheller, Kerstin Schmidt & Thomas Stefan Spengler. (2020) Decentralized master production and recycling scheduling of lithium-ion batteries: a techno-economic optimization model. Journal of Business Economics 91:2, pages 253-282.
Crossref
Nidhi Handa, Sunil Kumar & Jitendra Kumar. (2021) Development of a closed-loop supply chain system with exponential demand and multivariate production/remanufacturing rates for deteriorated products. Materials Today: Proceedings 47, pages 2560-2564.
Crossref
Adel A. Alamri. (2021) Exploring the effect of the first cycle on the economic production quantity repair and waste disposal model. Applied Mathematical Modelling 89, pages 519-540.
Crossref
Amir Hossein Nobil, Abolfazl Kazemi & Ata Allah Taleizadeh. (2020) Economic lot-size problem for a cleaner manufacturing system with warm-up period. RAIRO - Operations Research 54:5, pages 1495-1514.
Crossref
Zhe Zhang, Sen Liu & Ben Niu. (2020) Coordination mechanism of dual-channel closed-loop supply chains considering product quality and return. Journal of Cleaner Production 248, pages 119273.
Crossref
S. Tharani & R. Uthayakumar. A comparative study on stock dependent production model for deteriorating items with carbon emission, rework and multiple production setups. A comparative study on stock dependent production model for deteriorating items with carbon emission, rework and multiple production setups.
Ata Allah Taleizadeh & Mohammad Sadegh Moshtagh. (2019) A consignment stock scheme for closed loop supply chain with imperfect manufacturing processes, lost sales, and quality dependent return: Multi Levels Structure. International Journal of Production Economics 217, pages 298-316.
Crossref
Sunil Tiwari, Waqas Ahmed & Biswajit Sarkar. (2018) Multi-item sustainable green production system under trade-credit and partial backordering. Journal of Cleaner Production 204, pages 82-95.
Crossref
Nita H. Shah, Dushyantkumar G. Patel & Digeshkumar B. Shah. (2016) EPQ model for returned/reworked inventories during imperfect production process under price-sensitive stock-dependent demand. Operational Research 18:2, pages 343-359.
Crossref
Danja Sonntag & Gudrun P. Kiesmüller. (2018) Disposal versus rework – Inventory control in a production system with random yield. European Journal of Operational Research 267:1, pages 138-149.
Crossref
Arun Kumar Paul. 2018. Green Initiatives for Business Sustainability and Value Creation. Green Initiatives for Business Sustainability and Value Creation 182 227 .
Shalini Jain, Sunil Tiwari, Leopoldo Eduardo Cárdenas-Barrón, Ali Akbar Shaikh & Shiv Raj Singh. (2018) A fuzzy imperfect production and repair inventory model with time dependent demand, production and repair rates under inflationary conditions. RAIRO - Operations Research 52:1, pages 217-239.
Crossref
R. Uthayakumar & S. Tharani. (2017) An economic production model for deteriorating items and time dependent demand with rework and multiple production setups. Journal of Industrial Engineering International 13:4, pages 499-512.
Crossref
Brojeswar Pal, Shib Sankar Sana & Kripasindhu Chaudhuri. (2017) A stochastic production inventory model for deteriorating items with products’ finite life-cycle. RAIRO - Operations Research 51:3, pages 669-684.
Crossref
Nan Li, Felix T. S. Chan, S. H. Chung & Allen H. Tai. (2017) A Stochastic Production-Inventory Model in a Two-State Production System With Inventory Deterioration, Rework Process, and Backordering. IEEE Transactions on Systems, Man, and Cybernetics: Systems 47:6, pages 916-926.
Crossref
Muhammad Omair, Biswajit Sarkar & Leopoldo Eduardo Cárdenas-Barrón. (2017) Minimum Quantity Lubrication and Carbon Footprint: A Step towards Sustainability. Sustainability 9:5, pages 714.
Crossref
Mohammad Sadegh Moshtagh & Ata Allah Taleizadeh. (2017) Stochastic integrated manufacturing and remanufacturing model with shortage, rework and quality based return rate in a closed loop supply chain. Journal of Cleaner Production 141, pages 1548-1573.
Crossref
Julia Pahl & Stefan Voss. (2016) Load dependent lead times and sustainability. Load dependent lead times and sustainability.
Cheng-Kang Chen, Tzu-Chun Weng & Chih-Chung Lo. (2016) Optimal replenishment quantity for new products and return rate of used products for a retailer. Applied Mathematical Modelling 40:23-24, pages 9754-9766.
Crossref
Ehsan Shekarian, Ezutah Udoncy Olugu, Salwa Hanim Abdul-Rashid & Eleonora Bottani. (2016) A Fuzzy Reverse Logistics Inventory System Integrating Economic Order/Production Quantity Models. International Journal of Fuzzy Systems 18:6, pages 1141-1161.
Crossref
Lama Moussawi-Haidar, Moueen Salameh & Walid Nasr. (2016) Production lot sizing with quality screening and rework. Applied Mathematical Modelling 40:4, pages 3242-3256.
Crossref
Digeshkumar Bipinchandra Shah, Dushyantkumar G. Patel & Nita H. Shah. 2016. Optimal Inventory Control and Management Techniques. Optimal Inventory Control and Management Techniques 17 31 .
Christian Nuss, Ramin Sahamie & Dennis Stindt. (2014) The Reverse Supply Chain Planning Matrix: A Classification Scheme for Planning Problems in Reverse Logistics. International Journal of Management Reviews 17:4, pages 413-436.
Crossref
B.C. Giri & S. Sharma. (2015) Optimizing a closed-loop supply chain with manufacturing defects and quality dependent return rate. Journal of Manufacturing Systems 35, pages 92-111.
Crossref
N. Li, Felix T. S. Chan, S. H. Chung & Allen H. Tai. (2015) An EPQ Model for Deteriorating Production System and Items with Rework. Mathematical Problems in Engineering 2015, pages 1-10.
Crossref
Julia Pahl & Stefan Voß. (2014) Integrating deterioration and lifetime constraints in production and supply chain planning: A survey. European Journal of Operational Research 238:3, pages 654-674.
Crossref
Mahsa Parvini, Ali Atashi, S. Mohammad Moattar Husseini & Akbar Esfahanipour. (2014) A two-echelon inventory model with product returns considering demands dependent return rates. The International Journal of Advanced Manufacturing Technology 72:1-4, pages 107-118.
Crossref
Hui Ming Wee & Gede Agus Widyadana. (2013) A production model for deteriorating items with stochastic preventive maintenance time and rework process with FIFO rule. Omega 41:6, pages 941-954.
Crossref
Kseniya Schemeleva, Xavier Delorme, Alexandre Dolgui, Frédéric Grimaud & Mikhail Y. Kovalyov. (2013) Lot-sizing on a single imperfect machine: ILP models and FPTAS extensions. Computers & Industrial Engineering 65:4, pages 561-569.
Crossref
R. Ramezanian & M. Saidi-Mehrabad. (2012) Multi-product unrelated parallel machines scheduling problem with rework processes. Scientia Iranica 19:6, pages 1887-1893.
Crossref
S. R. Singh & Neha Saxena. (2012) An Optimal Returned Policy for a Reverse Logistics Inventory Model with Backorders. Advances in Decision Sciences 2012, pages 1-21.
Crossref
Gede Agus Widyadana & Hui Ming Wee. (2012) An economic production quantity model for deteriorating items with multiple production setups and rework. International Journal of Production Economics 138:1, pages 62-67.
Crossref
K. Schemeleva, X. Delorme, A. Dolgui, F. Grimaud & M.Y. Kovalyov. (2012) Production Lot Sizes on a Single Imperfect Machine: FPTAS vs ILP models. IFAC Proceedings Volumes 45:6, pages 590-595.
Crossref
. 2012. Corporate Risk Management. Corporate Risk Management 381 393 .
Adam Janiak & Tomasz Krysiak. (2012) Scheduling jobs with values dependent on their completion times. International Journal of Production Economics 135:1, pages 231-241.
Crossref
Giovanni Davoli & Riccardo Melloni. 2012. Advances in Production Management Systems. Value Networks: Innovation, Technologies, and Management. Advances in Production Management Systems. Value Networks: Innovation, Technologies, and Management 45 53 .
Ahmed M.A. El Saadany & Mohamad Y. Jaber. (2011) A production/remanufacture model with returns’ subassemblies managed differently. International Journal of Production Economics 133:1, pages 119-126.
Crossref
Mohamad Y. Jaber & Ahmed M.A. El Saadany. (2011) An economic production and remanufacturing model with learning effects. International Journal of Production Economics 131:1, pages 115-127.
Crossref
Adel A. Alamri. (2011) Theory and methodology on the global optimal solution to a General Reverse Logistics Inventory Model for deteriorating items and time-varying rates. Computers & Industrial Engineering 60:2, pages 236-247.
Crossref
C. P. Pappis & N. P. Rachaniotis. (2009) Scheduling in a multi-processor environment with deteriorating job processing times and decreasing values: the case of forest fires. Journal of Heuristics 16:4, pages 617-632.
Crossref
I. Konstantaras & K. Skouri. (2010) Lot sizing for a single product recovery system with variable setup numbers. European Journal of Operational Research 203:2, pages 326-335.
Crossref
Costas P. Pappis & Nikolaos Panagiotis Rachaniotis. (2009) Scheduling a single fire fighting resource with deteriorating fire suppression times and set-up times. Operational Research 10:1, pages 27-42.
Crossref
Ahmed M.A. El Saadany & Mohamad Y. Jaber. (2010) A production/remanufacturing inventory model with price and quality dependant return rate. Computers & Industrial Engineering 58:3, pages 352-362.
Crossref
Mohamad Y. Jaber & Ahmed M.A. El Saadany. (2009) The production, remanufacture and waste disposal model with lost sales. International Journal of Production Economics 120:1, pages 115-124.
Crossref
Ning Liu, Youngjoo Kim & Hark Hwang. (2009) An optimal operating policy for the production system with rework. Computers & Industrial Engineering 56:3, pages 874-887.
Crossref
Shen-Lian Chung, Hui-Ming Wee & Po-Chung Yang. (2008) Optimal policy for a closed-loop supply chain inventory system with remanufacturing. Mathematical and Computer Modelling 48:5-6, pages 867-881.
Crossref
Ahmed M.A. El Saadany & Mohamad Y. Jaber. (2008) The EOQ repair and waste disposal model with switching costs. Computers & Industrial Engineering 55:1, pages 219-233.
Crossref
Mohamad Y. Jaber & Marc A. Rosen. (2008) The economic order quantity repair and waste disposal model with entropy cost. European Journal of Operational Research 188:1, pages 109-120.
Crossref
Johnny C. Ho, Adriano O. Solis & Yih-Long Chang. (2007) An evaluation of lot-sizing heuristics for deteriorating inventory in material requirements planning systems. Computers & Operations Research 34:9, pages 2562-2575.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.