Purushottam L. Meena, Rajesh Katiyar & Gopal Kumar. (2022) Supplier performance and selection from sustainable supply chain performance perspective. International Journal of Productivity and Performance Management 72:8, pages 2420-2445.
Crossref
Faezeh Bagheri, Melissa Demartini, Alessandra Arezza, Flavio Tonelli, Massimo Pacella & Gabriele Papadia. (2022) An Agent-Based Approach for Make-To-Order Master Production Scheduling. Processes 10:5, pages 921.
Crossref
Timm Ziarnetzky, Lars Monch & Reha Uzsoy. (2020) Simulation-Based Performance Assessment of Production Planning Models With Safety Stock and Forecast Evolution in Semiconductor Wafer Fabrication. IEEE Transactions on Semiconductor Manufacturing 33:1, pages 1-12.
Crossref
Hirokazu Kobayashi, Kuniharu Itoh & Hisashi Tamaki. (2018) Introduction of an Optimization Technique with Dividing Term and Moving Horizon時間分割逐次予測型スケジューリング手法の試み. Transactions of the Institute of Systems, Control and Information Engineers 31:9, pages 313-327.
Crossref
Uche Okongwu, Matthieu Lauras, Julien François & Jean-Christophe Deschamps. (2016) Impact of the integration of tactical supply chain planning determinants on performance. Journal of Manufacturing Systems 38, pages 181-194.
Crossref
Narat Hasachoo & Ruedee Masuchun. (2015) Factors affecting schedule nervousness in the production operations of airline catering industry. Factors affecting schedule nervousness in the production operations of airline catering industry.
Patrik Jonsson & Linea Kjellsdotter Ivert. (2015) Improving performance with sophisticated master production scheduling. International Journal of Production Economics 168, pages 118-130.
Crossref
Rajesh Katiyar, Mukesh Kumar Barua & Purushottam L. Meena. (2015) Modelling the measures of supply chain performance in the Indian automotive industry. Benchmarking: An International Journal 22:4, pages 665-696.
Crossref
Thomas Ponsignon & Lars Mönch. (2014) Simulation-based performance assessment of master planning approaches in semiconductor manufacturing. Omega 46, pages 21-35.
Crossref
Nicolai Præstholm, Ann-Louise Andersen, Kjeld Nielsen & Thomas Ditlev Brunø. 2014. Progress in Pattern Recognition, Image Analysis, Computer Vision, and Applications. Progress in Pattern Recognition, Image Analysis, Computer Vision, and Applications
411
418
.
Ann-Louise Andersen, Nicolai Præstholm, Kjeld Nielsen & Thomas Ditlev Brunø. 2014. Progress in Pattern Recognition, Image Analysis, Computer Vision, and Applications. Progress in Pattern Recognition, Image Analysis, Computer Vision, and Applications
403
410
.
Jia-Nian Zheng & Chen-Fu Chien. (2013) Master production schedule and system for excelling enterprise resources (SEER) in the LED industry. Master production schedule and system for excelling enterprise resources (SEER) in the LED industry.
Thomas Ponsignon & Lars Mönch. (2012) Heuristic approaches for master planning in semiconductor manufacturing. Computers & Operations Research 39:3, pages 479-491.
Crossref
Jun-Der Leu, Li-Ting Huang & Chon-You Chen. (2010) A MRP-II based planning method for the TFT-LCD manufacturing. A MRP-II based planning method for the TFT-LCD manufacturing.