324
Views
24
CrossRef citations to date
0
Altmetric
Original Articles

ASALBP: the alternative subgraphs assembly line balancing problem

&
Pages 3503-3516 | Received 01 Dec 2006, Published online: 15 Apr 2008

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (8)

Tadeusz Sawik. (2024) A new MIP approach for balancing and scheduling of mixed model assembly lines with alternative precedence relations. International Journal of Production Research 62:1-2, pages 110-121.
Read now
Yunfang Peng, Lijun Zhang, Beixin Xia & Yajuan Han. (2023) Research on balancing and sequencing problems of flexible mixed model assembly lines with alternative precedence relations. International Journal of Production Research 61:24, pages 8451-8467.
Read now
Daria Leiber, Anh-Tu Vuong & Gunther Reinhart. (2022) Alternative subgraphs assembly line balancing problem with resource selection and parallel stations. Engineering Optimization 54:11, pages 1903-1918.
Read now
Bahman Naderi, Ahmed Azab & Katayoun Borooshan. (2019) A realistic multi-manned five-sided mixed-model assembly line balancing and scheduling problem with moving workers and limited workspace. International Journal of Production Research 57:3, pages 643-661.
Read now
K.N. Genikomsakis & V.D. Tourassis. (2012) Task proximity index: a novel measure for assessing the work-efficiency of assembly line balancing configurations. International Journal of Production Research 50:6, pages 1624-1638.
Read now
Rafael Pastor. (2011) LB-ALBP: the lexicographic bottleneck assembly line balancing problem. International Journal of Production Research 49:8, pages 2425-2442.
Read now
Pablo Cortés, Luis Onieva & José Guadix. (2010) Optimising and simulating the assembly line balancing problem in a motorcycle manufacturing company: a case study. International Journal of Production Research 48:12, pages 3637-3656.
Read now
Luigi Martino & Rafael Pastor. (2010) Heuristic procedures for solving the general assembly line balancing problem with setups. International Journal of Production Research 48:6, pages 1787-1804.
Read now

Articles from other publishers (16)

Ümmühan Palamut & Şener Akpinar. (2023) A hybrid metaheuristic based on the firefly and bat algorithms to solve the alternative subgraphs assembly line balancing problem. Production Engineering.
Crossref
Nils Boysen, Philipp Schulze & Armin Scholl. (2022) Assembly line balancing: What happened in the last fifteen years?. European Journal of Operational Research 301:3, pages 797-814.
Crossref
Jeroen Burgelman & Mario Vanhoucke. (2020) Project schedule performance under general mode implementation disruptions. European Journal of Operational Research 280:1, pages 295-311.
Crossref
Jonathan Oesterle, Lionel Amodeo & Farouk Yalaoui. (2017) A comparative study of Multi-Objective Algorithms for the Assembly Line Balancing and Equipment Selection Problem under consideration of Product Design Alternatives. Journal of Intelligent Manufacturing 30:3, pages 1021-1046.
Crossref
Jonathan Oesterle, Thomas Bauernhansl & Lionel Amodeo. (2016) Hybrid Multi-objective Optimization Method for Solving Simultaneously the line Balancing, Equipment and Buffer Sizing Problems for Hybrid Assembly Systems. Procedia CIRP 57, pages 416-421.
Crossref
Mohand Lounes Bentaha, Olga Battaïa, Alexandre Dolgui & S. Jack Hu. (2015) Second order conic approximation for disassembly line design with joint probabilistic constraints. European Journal of Operational Research 247:3, pages 957-967.
Crossref
Seren Ozmehmet Tasan & Mitsuo Gen. (2013) An integrated selection and scheduling for disjunctive network problems. Computers & Industrial Engineering 65:1, pages 65-76.
Crossref
Olga Battaïa, Xavier Delorme, Alexandre Dolgui & Frédéric Grimaud. (2013) Integrated Decision Making in Flow Line Balancing. IFAC Proceedings Volumes 46:9, pages 831-838.
Crossref
Mir-Bahador Aryanezhad, Nima Fakhim Hashemi, Ahmad Makui & Hasan Javanshir. (2012) A simple approach to the two-dimensional guillotine cutting stock problem. Journal of Industrial Engineering International 8:1.
Crossref
R. Čapek, P. Šůcha & Z. Hanzálek. (2012) Production scheduling with alternative process plans. European Journal of Operational Research 217:2, pages 300-311.
Crossref
Mohd Fadzil Faisae Rashid, Windo Hutabarat & Ashutosh Tiwari. (2011) A review on assembly sequence planning and assembly line balancing optimisation using soft computing approaches. The International Journal of Advanced Manufacturing Technology 59:1-4, pages 335-349.
Crossref
Seyda Topaloglu, Latif Salum & Aliye Ayca Supciller. (2012) Rule-based modeling and constraint programming based solution of the assembly line balancing problem. Expert Systems with Applications 39:3, pages 3484-3493.
Crossref
R. Capek, P. S ucha & Z. Hanzalek. (2010) Alternative process plans in wire harnesses production. Alternative process plans in wire harnesses production.
Seren Ozmehmet Tasan & Mitsuo Gen. (2010) An integrated selection and scheduling for large-sized disjunctive network problems. An integrated selection and scheduling for large-sized disjunctive network problems.
Armin Scholl, Nils Boysen & Malte Fliedner. (2009) Optimally solving the alternative subgraphs assembly line balancing problem. Annals of Operations Research 172:1, pages 243-258.
Crossref
Liliana Capacho, Rafael Pastor, Alexander Dolgui & Olga Guschinskaya. (2007) An evaluation of constructive heuristic methods for solving the alternative subgraphs assembly line balancing problem. Journal of Heuristics 15:2, pages 109-132.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.