Eugene Levner, Vladimir Kats, Pengyu Yan & Ada Che. (2024) Fast Algorithm for High-Throughput Screening Scheduling Based on the PERT/CPM Project Management Technique. Algorithms 17:3, pages 127.
Crossref
Jianguang Feng, Ada Che, Chengbin Chu, Eugene Levner & Vladimir Kats. (2024) Scheduling robotic cells with fixed processing times or time windows: Classification, solution approaches, polynomial algorithms and complexity. European Journal of Operational Research.
Crossref
Sophie Reimschüssel, Uwe Fuchs & Guido Sand. 2023. 33rd European Symposium on Computer Aided Process Engineering. 33rd European Symposium on Computer Aided Process Engineering
125
130
.
Hyun-Jung Kim & Jun-Ho Lee. (2022) Scheduling of Dual-Gripper Robotic Cells With Reinforcement Learning. IEEE Transactions on Automation Science and Engineering 19:2, pages 1120-1136.
Crossref
Emna Laajili, Sid Lamrous, Marie-Ange Manier & Jean-Marc Nicod. (2021) An Adapted Variable Neighborhood Search based algorithm for the cyclic multi-hoist design and scheduling problem. Computers & Industrial Engineering 157, pages 107225.
Crossref
Pengyu Yan, Hongru Miao, Ada Che & Kaize Yu. (2021) Nash-equilibrium algorithm and incentive protocol for a decentralized decision and scheduling problem in sustainable electroplating plants. Computers & Operations Research 128, pages 105130.
Crossref
Xiao-Fei Zhao & Xiu-Ping Guo. (2018) An effective chemical reaction optimization for cyclic multi-type parts robotic cell scheduling problem with blocking. Journal of Intelligent & Fuzzy Systems 35:3, pages 3567-3579.
Crossref
Hyun-Jung Kim & Jun-Ho Lee. (2018) Completion Time Analysis for Automated Manufacturing Systems with Parallel Processing Modules. Completion Time Analysis for Automated Manufacturing Systems with Parallel Processing Modules.
Hakan Gultekin, Betul Coban & Vahid Eghbal Akhlaghi. (2018) Cyclic scheduling of parts and robot moves in m-machine robotic cells. Computers & Operations Research 90, pages 161-172.
Crossref
Jun-Ho Lee & Hyun-Jung Kim. (2017) Completion Time Analysis of Wafer Lots in Single-Armed Cluster Tools With Parallel Processing Modules. IEEE Transactions on Automation Science and Engineering 14:4, pages 1622-1633.
Crossref
Jipeng Wang, Chunrong Pan, Hesuan Hu & Yuan Zhou. (2017) Scheduling of single-arm cluster tools with multi-type wafers and shared PMs. Scheduling of single-arm cluster tools with multi-type wafers and shared PMs.
Jun-Ho Lee & Hyun-Jung Kim. (2016) Makespan Analysis of Lot Switching Period in Cluster Tools. IEEE Transactions on Semiconductor Manufacturing 29:2, pages 127-136.
Crossref
Adnen El Amraoui & Mohsen Elhafsi. (2016) An efficient new heuristic for the hoist scheduling problem. Computers & Operations Research 67, pages 184-192.
Crossref
Hyun-Jung Kim, Jun-Ho Lee, Sunhee Baik & Tae-Eog Lee. (2015) Scheduling In-Line Multiple Cluster Tools. IEEE Transactions on Semiconductor Manufacturing 28:2, pages 171-179.
Crossref
Hyun-Jung Kim, Jun-Ho Lee & Tae-Eog Lee. (2015) Noncyclic Scheduling of Cluster Tools With a Branch and Bound Algorithm. IEEE Transactions on Automation Science and Engineering 12:2, pages 690-700.
Crossref
Olatunde T. Baruwa & Miquel A. Piera. (2015) Identifying FMS repetitive patterns for efficient search-based scheduling algorithm: A colored Petri net approach. Journal of Manufacturing Systems 35, pages 120-135.
Crossref
Hyun-Jung Kim, Jun-Ho Lee & Tae-Eog Lee. (2014) Non-Cyclic Scheduling of a Wet Station. IEEE Transactions on Automation Science and Engineering 11:4, pages 1262-1274.
Crossref
Jun-Ho Lee, Hyun-Jung Kim & Tae-Eog Lee. (2014) Scheduling Cluster Tools for Concurrent Processing of Two Wafer Types. IEEE Transactions on Automation Science and Engineering 11:2, pages 525-536.
Crossref
Adnen El Amraoui, Marie-Ange Manier, Abdellah El Moudni & Mohamed Benrejeb. (2013) A genetic algorithm approach for a single hoist scheduling problem with time windows constraints. Engineering Applications of Artificial Intelligence 26:7, pages 1761-1771.
Crossref
Shibohua Zhang, Pengyu Yan & Ada Che. (2013) A discrete differential evolution algorithm for cyclic scheduling problem in re-entrant robotic cells. A discrete differential evolution algorithm for cyclic scheduling problem in re-entrant robotic cells.
Adnen El Amraoui, Marie-Ange Manier, Abdellah El Moudni & Mohamed Benrejeb. (2013) A linear optimization approach to the heterogeneous r-cyclic hoist scheduling problem. Computers & Industrial Engineering 65:3, pages 360-369.
Crossref
Pengyu Yan, Xiaoqiang Cai, Zhen Zhou & Xiaowo Tang. (2013) A dynamic branch and bound approach for robotic rescheduling with randomly arriving jobs. A dynamic branch and bound approach for robotic rescheduling with randomly arriving jobs.
S. C. Steneberg. (2013) MILP model for multi-product, multi-part and multi-hoist cycle shops. MILP model for multi-product, multi-part and multi-hoist cycle shops.
Hyun-Jung Kim, Jun-Ho Lee, Chihyun Jung & Tae-Eog Lee. (2013) Scheduling Cluster Tools With Ready Time Constraints for Consecutive Small Lots. IEEE Transactions on Automation Science and Engineering 10:1, pages 145-159.
Crossref
Hyun-Jung Kim, Jun-Ho Lee & Tae-Eog Lee. (2012) Scheduling a wet station using a branch and bound algorithm. Scheduling a wet station using a branch and bound algorithm.
Vladimir Kats & Eugene Levner. (2011) Cyclic Flowshop Scheduling with Operators and Robots: Vyacheslav Tanaev’s Vision and Lasting Contributions. Journal of Scheduling 15:4, pages 419-425.
Crossref
Pengyu Yan, Xiaowo Tang, Ada Che & Chengbin Chu. (2012) Cyclic robotic cells scheduling using tabu search algorithm. Cyclic robotic cells scheduling using tabu search algorithm.
Ada Che, Michelle Chabrol, Michel Gourgand & Yuan Wang. (2012) Scheduling multiple robots in a no-wait re-entrant robotic flowshop. International Journal of Production Economics 135:1, pages 199-208.
Crossref
Adnen El Amraoui & Mohsen Elhafsi. (2016) An Efficient New Heuristic for the Hoist Scheduling Problem. SSRN Electronic Journal.
Crossref