287
Views
37
CrossRef citations to date
0
Altmetric
Original Articles

Optimal cyclic scheduling of a hoist and multi-type parts with fixed processing times

, , &
Pages 1225-1243 | Received 15 Apr 2008, Accepted 23 Sep 2008, Published online: 10 Feb 2009

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (8)

Jun-Ho Lee & Hyun-Jung Kim. (2022) Reinforcement learning for robotic flow shop scheduling with processing time variations. International Journal of Production Research 60:7, pages 2346-2368.
Read now
Jun-Ho Lee, Hyun-Jung Kim & Tae-Eog Lee. (2015) Scheduling cluster tools for concurrent processing of two wafer types with PM sharing. International Journal of Production Research 53:19, pages 6007-6022.
Read now
Heejung Kim, Hyun-Jung Kim, Jun-Ho Lee & Tae-Eog Lee. (2013) Scheduling dual-armed cluster tools with cleaning processes. International Journal of Production Research 51:12, pages 3671-3687.
Read now
Pengyu Yan, Ada Che, Naiding Yang & Chengbin Chu. (2012) A tabu search algorithm with solution space partition and repairing procedure for cyclic robotic cell scheduling problem. International Journal of Production Research 50:22, pages 6403-6418.
Read now
Mehdi Foumani & Kouroush Jenab. (2012) Cycle time analysis in reentrant robotic cells with swap ability. International Journal of Production Research 50:22, pages 6372-6387.
Read now
Patrick Hirsch, Andreas Palfi & Manfred Gronalt. (2012) Solving a time constrained two-crane routing problem for material handling with an ant colony optimisation approach: an application in the roof-tile industry. International Journal of Production Research 50:20, pages 6005-6021.
Read now
Ada Che, Zhen Zhou, Chengbin Chu & Haoxun Chen. (2011) Multi-degree cyclic hoist scheduling with time window constraints. International Journal of Production Research 49:19, pages 5679-5693.
Read now
K. Kujawski & J. Świątek. (2011) Electroplating production scheduling by cyclogram unfolding in dynamic hoist scheduling problem. International Journal of Production Research 49:17, pages 5355-5371.
Read now

Articles from other publishers (29)

Eugene Levner, Vladimir Kats, Pengyu Yan & Ada Che. (2024) Fast Algorithm for High-Throughput Screening Scheduling Based on the PERT/CPM Project Management Technique. Algorithms 17:3, pages 127.
Crossref
Jianguang Feng, Ada Che, Chengbin Chu, Eugene Levner & Vladimir Kats. (2024) Scheduling robotic cells with fixed processing times or time windows: Classification, solution approaches, polynomial algorithms and complexity. European Journal of Operational Research.
Crossref
Sophie Reimschüssel, Uwe Fuchs & Guido Sand. 2023. 33rd European Symposium on Computer Aided Process Engineering. 33rd European Symposium on Computer Aided Process Engineering 125 130 .
Hyun-Jung Kim & Jun-Ho Lee. (2022) Scheduling of Dual-Gripper Robotic Cells With Reinforcement Learning. IEEE Transactions on Automation Science and Engineering 19:2, pages 1120-1136.
Crossref
Emna Laajili, Sid Lamrous, Marie-Ange Manier & Jean-Marc Nicod. (2021) An Adapted Variable Neighborhood Search based algorithm for the cyclic multi-hoist design and scheduling problem. Computers & Industrial Engineering 157, pages 107225.
Crossref
Pengyu Yan, Hongru Miao, Ada Che & Kaize Yu. (2021) Nash-equilibrium algorithm and incentive protocol for a decentralized decision and scheduling problem in sustainable electroplating plants. Computers & Operations Research 128, pages 105130.
Crossref
Xiao-Fei Zhao & Xiu-Ping Guo. (2018) An effective chemical reaction optimization for cyclic multi-type parts robotic cell scheduling problem with blocking. Journal of Intelligent & Fuzzy Systems 35:3, pages 3567-3579.
Crossref
Hyun-Jung Kim & Jun-Ho Lee. (2018) Completion Time Analysis for Automated Manufacturing Systems with Parallel Processing Modules. Completion Time Analysis for Automated Manufacturing Systems with Parallel Processing Modules.
Hakan Gultekin, Betul Coban & Vahid Eghbal Akhlaghi. (2018) Cyclic scheduling of parts and robot moves in m-machine robotic cells. Computers & Operations Research 90, pages 161-172.
Crossref
Jun-Ho Lee & Hyun-Jung Kim. (2017) Completion Time Analysis of Wafer Lots in Single-Armed Cluster Tools With Parallel Processing Modules. IEEE Transactions on Automation Science and Engineering 14:4, pages 1622-1633.
Crossref
Jipeng Wang, Chunrong Pan, Hesuan Hu & Yuan Zhou. (2017) Scheduling of single-arm cluster tools with multi-type wafers and shared PMs. Scheduling of single-arm cluster tools with multi-type wafers and shared PMs.
Jun-Ho Lee & Hyun-Jung Kim. (2016) Makespan Analysis of Lot Switching Period in Cluster Tools. IEEE Transactions on Semiconductor Manufacturing 29:2, pages 127-136.
Crossref
Adnen El Amraoui & Mohsen Elhafsi. (2016) An efficient new heuristic for the hoist scheduling problem. Computers & Operations Research 67, pages 184-192.
Crossref
Hyun-Jung Kim, Jun-Ho Lee, Sunhee Baik & Tae-Eog Lee. (2015) Scheduling In-Line Multiple Cluster Tools. IEEE Transactions on Semiconductor Manufacturing 28:2, pages 171-179.
Crossref
Hyun-Jung Kim, Jun-Ho Lee & Tae-Eog Lee. (2015) Noncyclic Scheduling of Cluster Tools With a Branch and Bound Algorithm. IEEE Transactions on Automation Science and Engineering 12:2, pages 690-700.
Crossref
Olatunde T. Baruwa & Miquel A. Piera. (2015) Identifying FMS repetitive patterns for efficient search-based scheduling algorithm: A colored Petri net approach. Journal of Manufacturing Systems 35, pages 120-135.
Crossref
Hyun-Jung Kim, Jun-Ho Lee & Tae-Eog Lee. (2014) Non-Cyclic Scheduling of a Wet Station. IEEE Transactions on Automation Science and Engineering 11:4, pages 1262-1274.
Crossref
Jun-Ho Lee, Hyun-Jung Kim & Tae-Eog Lee. (2014) Scheduling Cluster Tools for Concurrent Processing of Two Wafer Types. IEEE Transactions on Automation Science and Engineering 11:2, pages 525-536.
Crossref
Adnen El Amraoui, Marie-Ange Manier, Abdellah El Moudni & Mohamed Benrejeb. (2013) A genetic algorithm approach for a single hoist scheduling problem with time windows constraints. Engineering Applications of Artificial Intelligence 26:7, pages 1761-1771.
Crossref
Shibohua Zhang, Pengyu Yan & Ada Che. (2013) A discrete differential evolution algorithm for cyclic scheduling problem in re-entrant robotic cells. A discrete differential evolution algorithm for cyclic scheduling problem in re-entrant robotic cells.
Adnen El Amraoui, Marie-Ange Manier, Abdellah El Moudni & Mohamed Benrejeb. (2013) A linear optimization approach to the heterogeneous r-cyclic hoist scheduling problem. Computers & Industrial Engineering 65:3, pages 360-369.
Crossref
Pengyu Yan, Xiaoqiang Cai, Zhen Zhou & Xiaowo Tang. (2013) A dynamic branch and bound approach for robotic rescheduling with randomly arriving jobs. A dynamic branch and bound approach for robotic rescheduling with randomly arriving jobs.
S. C. Steneberg. (2013) MILP model for multi-product, multi-part and multi-hoist cycle shops. MILP model for multi-product, multi-part and multi-hoist cycle shops.
Hyun-Jung Kim, Jun-Ho Lee, Chihyun Jung & Tae-Eog Lee. (2013) Scheduling Cluster Tools With Ready Time Constraints for Consecutive Small Lots. IEEE Transactions on Automation Science and Engineering 10:1, pages 145-159.
Crossref
Hyun-Jung Kim, Jun-Ho Lee & Tae-Eog Lee. (2012) Scheduling a wet station using a branch and bound algorithm. Scheduling a wet station using a branch and bound algorithm.
Vladimir Kats & Eugene Levner. (2011) Cyclic Flowshop Scheduling with Operators and Robots: Vyacheslav Tanaev’s Vision and Lasting Contributions. Journal of Scheduling 15:4, pages 419-425.
Crossref
Pengyu Yan, Xiaowo Tang, Ada Che & Chengbin Chu. (2012) Cyclic robotic cells scheduling using tabu search algorithm. Cyclic robotic cells scheduling using tabu search algorithm.
Ada Che, Michelle Chabrol, Michel Gourgand & Yuan Wang. (2012) Scheduling multiple robots in a no-wait re-entrant robotic flowshop. International Journal of Production Economics 135:1, pages 199-208.
Crossref
Adnen El Amraoui & Mohsen Elhafsi. (2016) An Efficient New Heuristic for the Hoist Scheduling Problem. SSRN Electronic Journal.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.