276
Views
26
CrossRef citations to date
0
Altmetric
Original Articles

Prioritising production and engineering lots in wafer fabrication facilities: a simulation study

&
Pages 3105-3125 | Received 11 Aug 2009, Accepted 08 Mar 2010, Published online: 20 May 2010

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (2)

Jun-Ho Lee & Hyun-Jung Kim. (2022) Reinforcement learning for robotic flow shop scheduling with processing time variations. International Journal of Production Research 60:7, pages 2346-2368.
Read now
Timm Ziarnetzky & Lars Mönch. (2016) Incorporating engineering process improvement activities into production planning formulations using a large-scale wafer fab model. International Journal of Production Research 54:21, pages 6416-6435.
Read now

Articles from other publishers (24)

Yanfeng Wu & Sihua Chen. (2023) Machine Allocation in Semiconductor Wafer Fabrication Systems: A Simulation-Based Approach. Journal of Systems Science and Systems Engineering 32:3, pages 372-390.
Crossref
Philipp Neuner, Stefan Haeussler, Julian Fodor & Gregor Blossey. (2022) Putting a Price Tag on Hot Lots and Expediting in Semiconductor Manufacturing. Putting a Price Tag on Hot Lots and Expediting in Semiconductor Manufacturing.
Jaewoo Chung & Jaejin Jang. (2022) Influence of an R&D lot on productivity in semiconductor manufacturing. Computers & Industrial Engineering 168, pages 108030.
Crossref
John W. Fowler & Lars Mönch. (2022) A survey of scheduling with parallel batch (p-batch) processing. European Journal of Operational Research 298:1, pages 1-24.
Crossref
Ching Foong Lee, Aik Ying Tang, Georg Seidel, Soo Leen Low & Boon Ping Gan. (2021) Operator Resource Planning in a Giga Fab During Covid-19 Restrictions. Operator Resource Planning in a Giga Fab During Covid-19 Restrictions.
Atchyuta Bharadwaj Manda, Karthick Gopalswamy, Sara Shashaani & Reha Uzsoy. (2020) A Simulation Optimization Approach for Managing Product Transitions in Multistage Production Lines. A Simulation Optimization Approach for Managing Product Transitions in Multistage Production Lines.
Joris Werling, Claude Yugma, Ameur Soukhal & Thierry Mohr. (2020) An Agent-Based Simulation Model with Human Resource Integration for Semiconductor Manufacturing Facility. An Agent-Based Simulation Model with Human Resource Integration for Semiconductor Manufacturing Facility.
Denny Kopp, Michael Hassoun, Adar Kalir & Lars Monch. (2020) SMT2020—A Semiconductor Manufacturing Testbed. IEEE Transactions on Semiconductor Manufacturing 33:4, pages 522-531.
Crossref
Atchyuta Bharadwaj Manda & Reha Uzsoy. (2020) A Simple Model of Capacity Contention During New Product Introductions. IEEE Transactions on Semiconductor Manufacturing 33:2, pages 240-251.
Crossref
Atchyuta Bharadwaj Manda & Reha Uzsoy. (2019) Optimzing Engineering and Production Lots During Product Transitions in Semiconductor Manufacturing. Optimzing Engineering and Production Lots During Product Transitions in Semiconductor Manufacturing.
Timm Ziarnetzky, Lars Monch, Thomas Ponsignon & Hans Ehm. (2019) Integrated Planning of Production and Engineering Activities in Semiconductor Supply Chains: A Simulation Study. Integrated Planning of Production and Engineering Activities in Semiconductor Supply Chains: A Simulation Study.
Michael Hassoun, Denny Kopp, Lars Monch & Adar Kalir. (2019) A New High-Volume/Low-Mix Simulation Testbed for Semiconductor Manufacturing. A New High-Volume/Low-Mix Simulation Testbed for Semiconductor Manufacturing.
Po-Chen Lin & Leon McGinnis. (2017) Test problems, reference models and fab simulation. Test problems, reference models and fab simulation.
Timm Ziarnetzky, Lars Monch, Thomas Ponsignon & Hans Ehm. (2017) Rolling horizon planning with engineering activities in semiconductor supply chains. Rolling horizon planning with engineering activities in semiconductor supply chains.
Yong H Chung, Jeong C Seo, Chong Man Kim, Byung H Kim & Sang C Park. (2016) Reservation-based dispatching rule for make-to-order wafer FAB with high-priority lots. Concurrent Engineering 25:1, pages 68-80.
Crossref
Kuo-Hao Chang. (2016) Risk-Controlled Product Mix Planning in Semiconductor Manufacturing Using Simulation Optimization. IEEE Transactions on Semiconductor Manufacturing 29:4, pages 411-418.
Crossref
Rene Ramacher & Lars Mönch. (2016) An automated negotiation approach to solve single machine scheduling problems with interfering job sets. Computers & Industrial Engineering 99, pages 318-329.
Crossref
Ying-Chin Ho, Jian-Wei Lin, Hao-Cheng Liu & Yuehwern Yih. (2016) A study on the lot production management in a thin-film-transistor liquid-crystal display fab. Journal of Manufacturing Systems 40, pages 9-25.
Crossref
Kuo-Hao Chang & Liam Y. Hsieh. (2016) Determination of Wafer Start Mix in Semiconductor Manufacturing During New Technology Ramp-Up: Model, Solution Method, and an Empirical Study. IEEE Transactions on Systems, Man, and Cybernetics: Systems 46:2, pages 294-302.
Crossref
Yong H. Chung, Sang C. Park, Byung H. Kim & Jeong C. Seo. (2015) Reservation based dispatching rule for wafer FAB with engineering lots. Reservation based dispatching rule for wafer FAB with engineering lots.
Yong H. Chung, Sang C. Park, Byung H. Kim & Jeong C. Seo. (2014) Due date control in order-driven FAB with high priority orders. Due date control in order-driven FAB with high priority orders.
James C. Chen, A. P. Putra, N. Anggono, K. J. Wang, S. W. Lin & C. C. Chen. 2014. Proceedings of 2013 4th International Asia Conference on Industrial Engineering and Management Innovation (IEMI2013). Proceedings of 2013 4th International Asia Conference on Industrial Engineering and Management Innovation (IEMI2013) 999 1008 .
Sukgon Kim & Reha Uzsoy. (2013) Modeling and Analysis of Integrated Planning of Production and Engineering Process Improvement. IEEE Transactions on Semiconductor Manufacturing 26:3, pages 414-422.
Crossref
Sukgon Kim & R. Uzsoy. (2012) Modeling and analysis of integrated planning of production and engineering process improvement. Modeling and analysis of integrated planning of production and engineering process improvement.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.